Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹43.1 LAccepted-Finance | ₹43.1 L | 1 | Accepted-Finance ok |
| 2 | 2₹43.2 LAccepted-Finance | ₹43.2 L | 2 | Accepted-Finance ok |
| 3 | 3₹43.2 LAccepted-Finance GRAM DHARI PALLI DHARI PALLI TEHSIL BADKOT | ₹43.2 L | 3 | Accepted-Finance ok |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Non Responsive |
| Sl No | Description | Qty | Unit | vinod prasad L3 | Jogeshwar Prasad L2 | Upendra Singh L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in soil in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and
disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | 7,420.04 | Cum | 77 ₹5.7 L | 77 ₹5.7 L | 76 ₹5.6 L |
| 2.00 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the
gabions). | 72 | Nos | 8,795 ₹6.3 L | 8,795 ₹6.3 L | 8,795 ₹6.3 L |
| 3.00 | Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring blasting (With out Dozer) Excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using Dozer including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. | 10,372.69 | Cum | 121 ₹12.6 L | 121 ₹12.6 L | 121 ₹12.6 L |
| 4.00 | Excavation in hilly areas in hard rock requiring blasting, by mechanical means without using Dozer , lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. | 5,187.87 | Cum | 305 ₹15.8 L | 305 ₹15.8 L | 305 ₹15.8 L |
| 5.00 | Removel and Disposal of Unsuitable Soil and Boulders inculiding loading and disposal upto 1000 m (averafe) lead (cum) | 8,068 | Cum | 34.6 ₹2.8 L | 34.47 ₹2.8 L | 34.6 ₹2.8 L |
Tender Value
₹51 L
EMD Value
₹1.0 L
Closing Date
11 May 2026, 2:00 pmClosed
Executive Engineer
EE CD PWD Barkot
Under the state plan, construction of Paluka motor road from Kunwa-Kafnaul motor road of Purola assembly constituency of Uttarkashi district.
2026_pwd_94153_1
465/10A Dated 02/04/2026
Open Tender
Civil Works - Roads
365 days
Paluka
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
EE CD PWD Barkot
₹1.0 L
11 May 2026
13 Apr 2026
11 May 2026
13 Apr 2026
11 May 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and
disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1 | - | Cum | - | - |
| 2 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the
gabions). | - | Nos | - | - |
| 3 | Excavation in Hilly Areas in Ordinary Rock by mechanical means not requiring blasting (With out Dozer) Excavation in hilly area in ordinary rock not requiring blasting by mechanical means without using Dozer including cutting and trimming of slopes and disposal of cut material with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2. | - | Cum | - | - |
| 4 | Excavation in hilly areas in hard rock requiring blasting, by mechanical means without using Dozer , lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2. | - | Cum | - | - |
| 5 | Removel and Disposal of Unsuitable Soil and Boulders inculiding loading and disposal upto 1000 m (averafe) lead (cum) | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_111425.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.77 MB
TC.pdf
Tender Documents • 5.67 MB
BOQ_111425.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid