| 1 | L1₹4.4 CrAccepted-AOC PREYOSREE MANSION PARK ROAD DIST SILCHAR ASSAM 788001 | CACHAR | ASSAM | 788001 | ₹4.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.8 Cr+₹39.4 L (9.01%)Rejected-Finance | ₹4.8 Cr+₹39.4 L (9.01%) | L2 | Rejected-Finance Not Qualified |
| 3 | L3₹5.1 Cr+₹76.2 L (17.4%)Rejected-Finance | ₹5.1 Cr+₹76.2 L (17.4%) | L3 | Rejected-Finance Not Qualified |
| Sl No | Description | Qty | Unit | Debajit Deb L2 | Arindam Dutta L1 | SRI AMBARISH ROY L3 |
|---|---|---|---|---|---|---|
| 1.00 | Pile load test on single vertical pile in accordance with
IS:2911(Part-IV).
a). Initial and Routine load test
i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani | 781 | MT | 330 ₹2,57,730 | 600 ₹4,68,600 | 150 ₹1,17,150 Lowest |
| 2.00 | Pile load test on single vertical pile in accordance with
IS:2911(Part-IV).
a). Initial and Routine load test
ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil | 720.5 | MT | 330 ₹2,37,765 | 600 ₹4,32,300 | 150 ₹1,08,075 Lowest |
| 3.00 | Pile load test on single vertical pile in accordance with
IS:2911(Part-IV).
a). Initial and Routine load test
iii) Br. on Uttar Sonapur to Narayanbasti Road | 748 | MT | 330 ₹2,46,840 | 600 ₹4,48,800 | 150 ₹1,12,200 Lowest |
| 4.00 | Pile load test on single vertical pile in accordance with
IS:2911(Part-IV).
B. (Lateral load test)
i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani | 4.56 | MT | 5,500 ₹25,080 | 5,000 ₹22,800 | 1,000 ₹4,560 Lowest |
| 5.00 | Pile load test on single vertical pile in accordance with
IS:2911(Part-IV).
B. (Lateral load test)
ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil | 4.96 | MT | 5,500 ₹27,280 | 5,000 ₹24,800 | 1,000 ₹4,960 Lowest |
| 6.00 | Pile load test on single vertical pile in accordance with
IS:2911(Part-IV).
B. (Lateral load test)
iii) Br. on Uttar Sonapur to Narayanbasti Road | 4.18 | MT | 5,500 ₹22,990 | 5,000 ₹20,900 | 1,000 ₹4,180 Lowest |
| 7.00 | Pile integrity test.
Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job
i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani | 4 | Nos. | 2,080 ₹8,320 | 750 ₹3,000 | 500 ₹2,000 Lowest |
| 8.00 | Pile integrity test.
Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job
ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil | 4 | Nos. | 2,080 ₹8,320 | 750 ₹3,000 | 500 ₹2,000 Lowest |
| 9.00 | Pile integrity test.
Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job
iii) Br. on Uttar Sonapur to Narayanbasti Road | 4 | Nos. | 2,080 ₹8,320 | 750 ₹3,000 | 500 ₹2,000 Lowest |
| 10.00 | Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm)
i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani | 240 | Rmt | 7,883 ₹18,91,920 | 7,000 ₹16,80,000 Lowest | 7,000 ₹16,80,000 Lowest |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
21 Sept 2024, 2:00 pmClosed
Chief Engineer (EAP), PWRD
O/o the Chief Engineer (EAP), PWRD, Fatasil Ambari, Guwahati-25
CE/EAP/ARRBP/OCB/Bridges-3/Cachar/02 Construction of Bridges in Cachar district i Br 2/1 on Hazarigram to Dolugram via Kalapani ii Br on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil iii Br on Uttar Sonapur to Narayanbasti Road
2024_PWRDW_38708_2
CEEAP/ARRBP111TENDERS2024ptI15
Open Tender
Civil Works - Bridges
Item Rate
730 days
Cachar
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
₹10.6 L
Yes
O/o the Chief Engineer (EAP), PWRD
5 Sept 2025
31 Aug 2024
21 Sept 2024
31 Aug 2024
21 Sept 2024
31 Aug 2024
31 Aug 2024 - 3 Sept 2024
3 Sept 2024
Amount
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test iii) Br. on Uttar Sonapur to Narayanbasti Road
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). B. (Lateral load test) iii) Br. on Uttar Sonapur to Narayanbasti Road
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Pile integrity test. Integrity testing for all piles by using pile driving analyser or equivalent as approved by engineer in charge and detailed in specification. Test to be carried out by an approved reputed agency. Item to include all incidental work to execute the job iii) Br. on Uttar Sonapur to Narayanbasti Road
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Bored cast-in-situ M35 grade R.C.C. Pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200mm) iii) Br. on Uttar Sonapur to Narayanbasti Road
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (B) Mechanical Means (II) With dewatering (i) Depth upto 3 m iii) Br. on Uttar Sonapur to Narayanbasti Road
Levelling course for Pile cap i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Levelling course for Pile cap ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Levelling course for Pile cap iii) Br. on Uttar Sonapur to Narayanbasti Road
Cement concrete for reinforced concrete in Pile cap & Tie Beam complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Cement concrete for reinforced concrete in Pile cap & Tie Beam complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Cement concrete for reinforced concrete in Pile cap & Tie Beam complete as per drawing and Technical Specification.RCC Grade M35 (Using Batching Plant, Transit Mixer and Concrete Pump) iii) Br. on Uttar Sonapur to Narayanbasti Road
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Pile & Pile caps, Beams i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Pile & Pile caps, Beams ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Pile & Pile caps, Beams iii) Br. on Uttar Sonapur to Narayanbasti Road
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, riding return walls, fly walls ) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, riding return walls, fly walls ) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Plain/Reinforced cement concrete,(Box culvert including walls, haunches, Corbel, riding return walls, fly walls ) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M35 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Uttar Sonapur to Narayanbasti Road
Plain/Reinforced cement concrete,(U return wall) in complete as per drawing and technical specification and steel shuttering formwork Without plasticiser H. RCC Grade M25 b. Height 5m to 10m Case II. Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Box Culvert Structure(External wall, Internal wall, Corbel & Haunches, Fly Walls) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Box Culvert Structure(External wall, Internal wall, Corbel & Haunches, Fly Walls) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Box Culvert Structure(External wall, Internal wall, Corbel & Haunches, Fly Walls) iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size toeards the wall and provided over the entire surfaces behind the abutement, wing wall and return wall to the full height compacted to firm condition complete as per drawing and technical specification. iii) Br. on Uttar Sonapur to Narayanbasti Road
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications (1000 mm c/c) iii) Br. on Uttar Sonapur to Narayanbasti Road
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Rebound Hammer test Non-Destructive tecting with rebound hammer for detection of damage zone in reinforced concrete structures and furnishing the finding in proper comprehensing format. iii) Br. on Uttar Sonapur to Narayanbasti Road
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Ultrasonic pulse velocity test Non-Destructive tecting with ultrasonic pulse velocity meter with data storage facility for detection of cracks voids and other imperfections in reinforced concrete structure and furnishing the finding thereof in proper comprehnsible format complete as directed by the department iii) Br. on Uttar Sonapur to Narayanbasti Road
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork.Without Plasticiser M35 Deck Slab & M35 RCC Crosss Girder Height 5m to 10m Case II Using Batching Plant, Transit Mixer and Concrete Pump iii) Br. on Uttar Sonapur to Narayanbasti Road
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification iii) Br. on Uttar Sonapur to Narayanbasti Road
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Reinforced cement concrete approach slab (M30) including reinforcement and formwork complete as per drawing and Technical specification.TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) iii) Br. on Uttar Sonapur to Narayanbasti Road
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bar 25mm dia, 450mm long at expansion joints filled with pre moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclouser to MOST circular No. RW/NH - 33022/1/94-DO III dated June 1994 as per dimension in the approved drawing and at locations directed by the engineer, all as specified. iii) Br. on Uttar Sonapur to Narayanbasti Road
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Deck slab i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Deck slab ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Supplying, fitting and placing TMT (Fe-500 D) reinforcement bar (From Primary Producer: TATA/SAIL/Esser Steel/ Jindal steel/Shyam steel/RINL) in complete as per drawings and technical specifications Clauses 1000 and 1202 Deck slab iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications iii) Br. on Uttar Sonapur to Narayanbasti Road
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Painting on concrete surface (Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 Sq.m. ) For Plain surface iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and fixing drainage spouts as per MORT & H specifications. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing and fixing drainage spouts as per MORT & H specifications. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and fixing drainage spouts as per MORT & H specifications. iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302 150 mm Filter Media iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 300 mm Filter Media ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 300 mm Filter Media iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 iii) Br. on Uttar Sonapur to Narayanbasti Road
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. iii) Br. on Uttar Sonapur to Narayanbasti Road
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 iii) Br. on Uttar Sonapur to Narayanbasti Road
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. iii) Br. on Uttar Sonapur to Narayanbasti Road
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. By Mechanical Means iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and laying interlocking concrete block pavement with M40 grade grade of concrete blocks having thickness 80mm as per technical specification clause 1504 complete including carriage. iii) Br. on Uttar Sonapur to Narayanbasti Road
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or as directed by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or other locations shown on the drawing or asdirected by the Engineer including preparation of ground, fetching of sods and watering as per Technical Specification Clause 309. iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm equilateral triangle i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm equilateral triangle ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm equilateral triangle iii) Br. on Uttar Sonapur to Narayanbasti Road
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iv) 800mm x 600mm rectangular i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iv) 800mm x 600mm rectangular ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801 iv) 800mm x 600mm rectangular iii) Br. on Uttar Sonapur to Narayanbasti Road
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Metal Beam Crash Barrier, Type - A: "W" Metal Beam Crash Barrier (Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2m center to center, 1.8 m high, 1.1m below ground/road level, all steel parts and fitments to be galvanized by hot dip process, all fitting to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause 810.) iii) Br. on Uttar Sonapur to Narayanbasti Road
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface iii) Br. on Uttar Sonapur to Narayanbasti Road
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Tree Plantation Planting of Trees and their Maintenance for three Year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge mannure, planting the saplings, backfilling the trenches, watering , fixing the tree guatrd and maintaining the plants for three year. iii) Br. on Uttar Sonapur to Narayanbasti Road
Dismantling of Tie Beam, Girder & Walls i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apartand white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Air quality monitoring At 3 locations for 2seasons for 2 consecutive years. (Construction Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Air quality monitoring At 3 locations for 2seasons for 2 consecutive years. (Construction Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Air quality monitoring At 3 locations for 2seasons for 2 consecutive years. (Construction Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Air quality monitoring at 3 locations for 2 seasons for 1year. (Operation Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Water quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Water quality monitoring at 3l locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Noise quality monitoring at 3 Locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Noise quality monitoring at 3 Locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Noise quality monitoring at 3 Locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Noise quality monitoring at 3 locations for 2 seasons for 1 year. (Operation Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Soil quality monitoring at 3 locations for 2 seasons for 2 consecutive years. (Construction Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Soil quality monitoring at 3 locations for 2 seasons for 1 year.(Operation Stage) iii) Br. on Uttar Sonapur to Narayanbasti Road
Training related to Capacity Building i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
Training related to Capacity Building ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
Training related to Capacity Building iii) Br. on Uttar Sonapur to Narayanbasti Road
A Provisional sum (fixed amount) for items of Tree felling/plantation of Rs. 5,66,473.00 (not to be changed by the Bidder in BOQ) i) Br. No. 2/1 on Hazarigram to Dolugram via Kalapani
A Provisional sum (fixed amount) for items of Utility Shifting & Tree felling/plantation of Rs. 2,08,477.00 (not to be changed by the Bidder in BOQ) ii) Br. on NH-37 at Chiripool to Sribar Lakhipur Road via Borbil
A Provisional sum (fixed amount) for items of Utility Shifting & Tree felling/plantation of Rs. 2,72,977.00 (not to be changed by the Bidder in BOQ) iii) Br. on Uttar Sonapur to Narayanbasti Road
Debajit Deb (BID ID -240176)
SRI AMBARISH ROY (BID ID -238948)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .