| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹73.5 LAccepted-AOC | ₹73.5 L | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹73.9 L+₹34,027 (0.46%)Rejected-Finance | ₹73.9 L+₹34,027 (0.46%) | 2 | Rejected-Finance 2nd lowest |
| 3 | 3₹74.3 L+₹80,792.80 (1.10%)Rejected-Finance | ₹74.3 L+₹80,792.80 (1.10%) | 3 | Rejected-Finance 3rd lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Offline Bid Not Submitted |
Tender Value
₹74.3 L
Closing Date
30 Aug 2021, 5:00 pmClosed
Executive Engineer,CD, UKPJN, Rudrapur
Office of the Executive Engineer, Construction Division, Uttarakhand Peyjal Nigam, Udham Singh Nagar (Rudrapur)
Istallation of India marka II hand pump boulder Strata(15 No.) and Rebore of India marka II hand pump Ordinary Strata(30 No.) and boulder strata(24 No.) including all accessories etc. complete at Different location of block Rudrapur
2021_MDPEY_35621_1
1382/NIVIDA VIGYAPAN/133 DT.- 17.08.2021
Open Tender
Civil Works - Water Works
Item Rate
270 days
Rudrapur
Please refer tender document
2 documents required · 2 mandatory
₹4,720
Executive Engineer,CD, UKPJN, Rudrapur
Exempted
Rudrapur
28 Jul 2023
20 Aug 2021
1 Sept 2021
20 Aug 2021
30 Aug 2021
24 Aug 2021
23 Aug 2021
Amount
Installation of India Mark-II Hand Pumps(Boulder Strata)
Hiring of machinary for hand pump boring
Construction of 150 mm dia bore by Casing Method in soil mixed with kankar ,bajri etc. including development of bore and erection of boring assembly and T & P, dismantling after completion of work also including all labour required for leaving of site loading arrangement etc. 0 to 25 Mt.
Construction of 200 mm dia bore hole by casing Method in soil mixed with clay ,bajri and boulders including erection of boring and T & P, handing and dismentiing after complection of work also including all labour required for leveling of site loading arrangement etc. 0 to 20 M.B.G.L and Above(as per site condition).By casing method
Construction of 150 mm dia bore by Palm and Pressure Method in soil mixed with kankar ,bajri etc. including erection of boring assembly and T & P, dismantling after completion of work also including all labour required for leaving of site loading arrangement etc. 25 to 50 Mt. and Above
Supply and fixing of 63 mm Dia 3 meter long PVC strainer using in palm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 63 mm Dia 6 kg/cm2 PVC pipe using in palm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 63 X110 mm Dia (6 kg/cm2 ) PVC reducer including all fixing materials labour etc. complete
Supply and fixing of 110 mm Dia 6 kg /cm2 ISI mark PVC pipe using in palm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 32 mm Dia 3meterlong G.I.medium pipeincluding socket etc. complete and fixing in cylinder and hand pump machine with proper completion of work.
Supply and installation of India Mark-II hand pump Machine set ( With 08 no. - 12 mm Ø Electrogalvanised M.S. road & 01 no. Hand Pump cylnder complete of approved make) over the hole as per instruction of the Engineer Incharge including of all labour materials etc .complete .
Supply and fixing of Circular precast concrete plate form and C.C.drain (1 meterlong )including making a Block of Size 0.76x0.76x0.40 in P.C.C.1:2:4 for hand pump as per type design including supply of all materials ,labour T & P required for proper complection of work
Embossing the details of hand pump installation as per deparmental circular over the hand pump body complete.
Development of bore by over pumping and back washing till the discharge free from turbidity ( Man tolerance 20 mg per litre turbidity 20 minutes of starting the pump ) including equipment labour T&P etc. required for proper completion of the work.
Disinfection of H.P. using powder chlorine compound including through cleaning of all exterior parts of hand pump coming in contact with water, also including supply of bleaching powder complete.
Surrounding or Packing added coarse sand in between the bore hole and the strainer up to 3m from the strainer, including supply of coarse sand, labour T&P etc. required for proper completion of the work.
Sealing of the annular space between the housing pipe and the bore hole in single continuous operation with puddle clay, bantonite clay and cement concrete as per drawing supplied by the department including supply of all material,labour T&P etc. required
Rebore of India Mark-II Hand Pumps. (Ordinary Strata).
Hiring of machinary for hand pump boring
Construction of 150 mm dia bore by Casing Method in soil mixed with kankar ,bajri etc.including development of bore and of erection of boring assembly and T & P, dismantling after completion of work also including all labour required for leaving of site loading arrangement etc. 0 to 25 Mt.
Construction of 150 mm dia bore by Palm and Pressure Method in soil mixed with kankar ,bajri etc.including erection of boring &Tand P, dismantling after completion of work also including all labour required for leaving of site loading arrangement etc.25 to 50 Mt. and Above
Supply and fixing of 63 mm Dia 3 meter long PVC strainer using inpalm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 63 mm Dia 6 kg/cm2 PVC pipe using in palm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 63 X110 mm Dia OD (6 kg/cm2 ) PVC reducer including all fixing materials labour etc. complete
Supply and fixing of 110 mm Dia 6 kg /cm2 ISI mark PVC pipe using in palm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 32 mm Dia 3meterlong G.I.medium pipeincluding socket etc. complete and fixing in cylinder and hand pump machine with proper completion of work.
Installation of India Mark-II hand pump Machine set over the hole as per instruction of the Engineer Incharge including of all labour materials etc .complete .
Supply of Circular precast concrete plateform, C.C.drain and chauki(standing base) as per type design.
Fixing of Circular precast concrete plate form, C.C.drain (1.00 meter long ) and chauki(standing base) including making a Block of Size 0.76x0.76x0.40 in P.C.C.1:2:4 for hand pump as per type design including supply of all materials ,labour T & P required for proper complection of work
Embossing the details of hand pump installation as per deparmental circular over the hand pump body complete.
Development of bore by over pumping and back washing till the discharge free from turbidity ( Man tolerance 20 mg per litre turbidity 20 minutes of starting the pump ) including equipment labour T&P etc. required for proper completion of the work.
Disinfection of H.P. using powder chlorine compound including through cleaning of all exterior parts of hand pump coming in contact with water, also including supply of bleaching powder complete.
Surrounding or Packing added coarse sand in between the bore hole and the strainer up to 3m from the strainer, including supply of coarse sand, labour T&P etc. required for proper completion of the work.
Sealing of the annular space between the housing pipe and the bore hole in single continuous operation with puddle clay, bantonite clay and cement concrete as per drawing supplied by the department including supply of all material,labour T&P etc. required
Dismantling of old Hand Pump and platform including excavation of Hand Pump materials, G.I. pipe, P.V.C. pipe as possible, complete with disposal of all U/S materials up to 50 m.
Supply of following materials to be used in Installation of India Mark-II Hand Pump and its spare parts. (Confirming to relevant I.S. standard specification & I.S.I. Mark).
Front Cover
Machine Bolt & Nut
M12X40 Hexa Bolt (Machine Bolt)
M12 Hexa Nut (Machine Nut)
M 12x20 Hexa Bolt (Front Cover/Tapa Bolt)
Third plate 4mm thick
Head Assembly with Handle
Handle axle with nut & washer (Axel Complete)
Handle axle withOut nut & washer
Axel bush
Axel washer (4mm thick) to suit M-12
Chain with coupling
Chain Nut & Bolt(H.P. Chain Complete)
Hexa bolt M-10 x 1.5 x 40 chain
Hexa Lock Nut M-10x1.5 (chain)
Ball Bearing (6204 Z) S.K.F./N.B.C.)
Handle Bar
Water Tank
M-12 x 50 Hexa coupling
12 mm dia. 3 m long electro galvanized M.S. Rod
Rubber Sealing ring (big)
Rubber Sealing (Upper Valve)/Rubber ring small
Rubber Sealing (Check Valve)/Rubber ring big
Pump Bucket (Nintrile Rubber)
Metal seat retainer
Plunger Yoko Body
Upper valve guide
Check Valve guide
Brass liner
Cylinder reducing cap
C.I. Cylinder Assembly Complete
Upper Valve Complete
Check Valve Complete
Plunger Rod
G.I. Socket 32 mm dia.
Pedestal/Tripod of Machine
Rebore of India Mark-II Hand Pumps. (Bolder Strata).
Hiring of machinary for hand pump boring
Construction of 150 mm dia bore by Casing Method in soil mixed with kankar ,bajri etc.including development of bore and of erection of boring assembly and T & P, dismantling after completion of work also including all labour required for leaving of site loading arrangement etc. 0 to 25 Mt.
Construction of 200 mm dia bore hole by casing Method in soil mixed with clay ,bajri and boulders including erection of boring and T & P, handing and dismentiing after complection of work also including all labour required for leveling of site loading arrangement etc.0 to 20 M.B.G.L.By casing method
Construction of 150 mm dia bore by Palm and Pressure Method insoil mixed with kankar ,bajri etc.including erresion of boring &Tand P, dismantling after completion of work also including all labour required for leaving of site loading arrangement etc.25 to 50 Mt. and Above
Supply and fixing of 63 mm Dia 3 meter long PVC strainer using inpalm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 63 mm Dia 6 kg/cm2 PVC pipe using in palm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 63 X110 mm Dia OD (6 kg/cm2 ) PVC reducer including all fixing materials labour etc. complete
Supply and fixing of 110 mm Dia 6 kg /cm2 ISI mark PVC pipe using in palm pressure method including all fixing materials labour socket etc. complete
Supply and fixing of 32 mm Dia 3meterlong G.I.medium pipeincluding socket etc. complete and fixing in cylinder and hand pump machine with proper completion of work.
Supply and fixing of Circular precast concrete plate form and C.C.drain (1 meterlong )including making a Block of Size 0.76x0.76x0.40 in P.C.C.1:2:4 for hand pump as per type design including supply of all materials ,labour T & P required for proper complection of work
Same as item 11 above but without Circular precast concrete plate form and C.C.drain.
Embossing the details of hand pump installation as per deparmental circular over the hand pump body complete.
Development of bore by over pumping and back washing till the discharge free from turbidity ( Man tolerance 20 mg per litre turbidity 20 minutes of starting the pump ) including equipment labour T&P etc. required for proper completion of the work.
Disinfection of H.P. using powder chlorine compound including through cleaning of all exterior parts of hand pump coming in contact with water, also including supply of bleaching powder complete.
Surrounding or Packing added coarse sand in between the bore hole and the strainer up to 3m from the strainer, including supply of coarse sand, labour T&P etc. required for proper completion of the work.
Sealing of the annular space between the housing pipe and the bore hole in single continuous operation with puddle clay, bantonite clay and cement concrete as per drawing supplied by the department including supply of all material,labour T&P etc. required
Dismantling of old H.P. concrete platform with assembly and extraction of PVC &GI pipe etc.with the help of chain pully and other special T&P etc.
Supply of following materials to be used in Installation of India Mark-II Hand Pump and its spare parts. (Confirming to relevant I.S. standard specification & I.S.I. Mark).
Front Cover
Machine Bolt & Nut
M12X40 Hexa Bolt (Machine Bolt)
M12 Hexa Nut (Machine Nut)
M 12x20 Hexa Bolt (Front Cover/Tapa Bolt)
Third plate 4mm thick
Head Assembly with Handle
Handle axle with nut & washer (Axel Complete)
Handle axle withOut nut & washer
Axel bush
Axel washer (4mm thick) to suit M-12
Chain with coupling
Chain Nut & Bolt(H.P. Chain Complete)
Hexa bolt M-10 x 1.5 x 40 chain
Hexa Lock Nut M-10x1.5 (chain)
Ball Bearing (6204 Z) S.K.F./N.B.C.)
Handle Bar
Water Tank
M-12 x 50 Hexa coupling
12 mm dia. 3 m long electro galvanized M.S. Rod
Rubber Sealing ring (big)
Rubber Sealing (Upper Valve)/Rubber ring small
Rubber Sealing (Check Valve)/Rubber ring big
Pump Bucket (Nintrile Rubber)
Metal seat retainer
Plunger Yoko Body
Upper valve guide
Check Valve guide
Brass liner
Cylinder reducing cap
C.I. Cylinder Assembly Complete
Upper Valve Complete
Check Valve Complete
Plunger Rod
G.I. Socket 32 mm dia.
Pedestal/Tripod of Machine
UNITED CONSTRUCTION
hifze ali
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .