| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | ₹4.7 L | L1 | Accepted-Finance accept |
| 2 | L2₹4.9 LAccepted-Finance V P O SEHAL TEHSIL BAIJNATH DISTT KANGRA H P | MANDI | HIMACHAL PRADESH | 175013 | ₹4.9 L | L2 | Accepted-Finance accept |
| 3 | L3₹5.1 LAccepted-Finance VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | ₹5.1 L | L3 | Accepted-Finance accept |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Recommended as eligible but Contractor/Firm requested to this office vide e-mail on dated 19.12.2025 ( Copy enclosed) due to unavoidable and personal reason withdraw me from this tender. |
| Sl No | Description | Qty | Unit | AMIT CHOUDHARY L3 | GALAXY ASSOCIATE L1 | SUNNY KAPOOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation , trenches etc., in all kinds of soil such as pickwork, jumper work blasting work, including decomposed soft and hard rock,including chiselling wedging clearance of bushes etc.including shoring, dewatering etc. in all leads and lifts stacking the excavated soil in all lifts clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth and sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus earth within all leads and lifts complete to the entire satisfaction of the Engineer-in-charge . | 31.38 | Cum | 950 ₹29,811 | 800 ₹25,104 | 900 ₹28,242 |
| 2.00 | Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts | 2.35 | Cum | 9,000 ₹21,150 | 8,000 ₹18,800 | 8,500 ₹19,975 |
| 3.00 | Providing and laying cement concrete 1:1.5:3 (One cement is to one & half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in foundation and plinth with in all leads and lifts as per the direction of Engineer-in-charge. | 4.5 | Cum | 11,000 ₹49,500 | 10,000 ₹45,000 | 10,500 ₹47,250 |
| 4.00 | Providing and laying cement concrete 1:1.5:3 (One cement is to one & half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work inWalls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge. | 18 | Cum | 11,500 ₹2,07,000 | 10,500 ₹1,89,000 | 10,800 ₹1,94,400 |
| 5.00 | Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in foundation and plinth with in all leads and lifts as per the direction of Engineer-in-charge. | 0.45 | Cum | 12,000 ₹5,400 | 9,500 ₹4,275 | 10,000 ₹4,500 |
| 6.00 | Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work inWalls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge. | 0.54 | Cum | 12,000 ₹6,480 | 9,500 ₹5,130 | 10,000 ₹5,400 |
| 7.00 | Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring in vertical walls with in all leads and lifts as per the direction of Engineer-in-charge. | 143.85 | Sqm | 400 ₹57,540 | 350 ₹50,347.5 | 380 ₹54,663 |
| 8.00 | Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge. | 1,386.13 | Kg | 98 ₹1,35,841.23 | 94 ₹1,30,296.69 | 96 ₹1,33,068.96 |
Tender Value
₹4.8 L
EMD Value
₹9,551
Closing Date
8 Dec 2025, 5:00 pmClosed
Executve Engineer JSV Division Jaisinghpur
O/O The Executive Engineer JSV Division Jaisinghpur
Restoration of rain damages of FIS Lohan Kuhl in GP-Bharwana in Tehsil -Palampur Distt-Kangra ,H.P,SH, C,O RCC chambers for Railway crossing in village-Bhuana under Section-Panchrukhi
2025_HPIPH_121816_1
10915-11000 dated 25.11.2025
Open Tender
Civil Works - Others
90 days
Bhuana
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Executive Engineer JSV Division Jaisinghpur
₹9,551
3 Jan 2026
26 Nov 2025
9 Dec 2025
26 Nov 2025
8 Dec 2025
26 Nov 2025
Amount
Excavation in foundation , trenches etc., in all kinds of soil such as pickwork, jumper work blasting work, including decomposed soft and hard rock,including chiselling wedging clearance of bushes etc.including shoring, dewatering etc. in all leads and lifts stacking the excavated soil in all lifts clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinth and sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus earth within all leads and lifts complete to the entire satisfaction of the Engineer-in-charge .
Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts
Providing and laying cement concrete 1:1.5:3 (One cement is to one & half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in foundation and plinth with in all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:1.5:3 (One cement is to one & half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work inWalls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in foundation and plinth with in all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work inWalls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge.
Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring in vertical walls with in all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
SUNNY KAPOOR (BID ID -590338)
AMIT CHOUDHARY (BID ID -590335)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Form6.pdf
Tender Documents • 0.46 MB
Form8.pdf
Tender Documents • 1.35 MB
Termsconditons.pdf
Tender Documents • 0.29 MB
BOQ_178640.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid