Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹34.1 L
EMD Value
₹35,000
Closing Date
13 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,Sauni Yojana Division,Rajkot
Third-Party Inspection/Project Management Agency For The Services Of Project Management, Construction, Supervision And Design Review Insite/Offsite Inspection & Testing Of Materials, Machinery, Equipments, Review Of Qap For Providing Irrigation Water For Filling Of Various Ponds Situated Within 3.0 Km From Existing Main Pipeline Of Sauni Yojana Link - 4 Package - 1, 2, 3, 4 & 5a (District - Surendranagar, Botad, Rajkot & Amreli) (Taluka - Chuda, Sayla, Botad, Vinchhiya, Jasdan, Gondal, Gadhada, Kotda Sangani & Babra) Through Various Dia Ms/Hdpe Pipeline By Making Connection From Existing Pipeline Scour Valve With All Allied Works Etc Complete. (2nd Attempt)
272603
01 of 2026
Open
Miscellaneous Works
Works
Rajkot
17 documents required · 17 mandatory
₹1,500
Yes
Executive Engineer, Sauni Yojna Division, Rajkot
₹35,000
Yes
4 Feb 2026
4 Feb 2026
4 Feb 2026
13 Feb 2026
4 Feb 2026
Addenda/Amendments to the above, for the INSPECTION SERVICES OF THE ABOVE
WORK, we the undersigned offer our inspection services from the date of commissioning
including defects liability period as given in Conditions of Contract and in conformity with
Schedules, Annexure, Bidding Documents, including Addendum Nos. _____________ (insert
numbers) for Lump Sum fixed price mention in the summary cost. Our financial proposal
shall be fixed and firm binding upon us subject to the modifications resulting from
contract negotiations up to expiration of the validity period of the proposal. The amount
of consultancy services is inclusive of all taxes, duties, service charges etc.
2. We undertake, if our Bid is accepted, to complete and deliver the Works in accordance
with the Contract within 12months or till the Project Implementation period, inclusive of
monsoons, from the date of receipt of work order to us by you. We will observe the laws
applicable to perform the services.
3. We agree to abide by this Bid for a period of 120 days from of opening of online Bid the
date fixed for receiving the same and it shall remain binding upon us and may be accepted
at any time before the expiry of that Period.
4. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed and conditions of form
“C” but until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
5. We agree, if our Bid accepted, to furnish Performance Bond / Security in the forms and of
value specified in the Conditions of Contract of a sum equivalent to Rs. 2.56Lakh for due
performance of the Contract.
6. We understand that you are not bound to accept the lowest or any Bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
The bid is lump sum bid for THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR
THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION, SUPERVISION AND DESIGN REVIEW
INSITE/OFFSITE INSPECTION & TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF
QAP FOR PROVIDING IRRIGATION WATER FOR FILLING OF VARIOUS PONDS SITUATED WITHIN
3.0 KM FROM EXISTING MAIN PIPELINE OF SAUNI YOJANA LINK - 4 PACKAGE - 1, 2, 3, 4 & 5A
(DISTRICT - SURENDRANAGAR, BOTAD, RAJKOT & AMRELI) (TALUKA - CHUDA, SAYLA, BOTAD,
VINCHHIYA, JASDAN, GONDAL, GADHADA, KOTDA SANGANI & BABRA) THROUGH VARIOUS DIA
MS/HDPE PIPELINE BY MAKING CONNECTION FROM EXISTING PIPELINE SCOUR VALVE WITH
ALL ALLIED WORKS ETC COMPLETE.
The bidder shall quote his firm and fixed lump sum price for the entire work under this
Contract, defined in more details in various sections of this bid document & form “C” of Lump
1. The rates and prices shall be submitted in the formats given in the enclosed Price
Schedules. Rates and prices received in any other formats will be rejected and the Bids
will be disqualified.
2. It will be entirely at the discretion of the NWRWS & KD to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bid on this account.
Schedule only will be considered for price evaluation& shall form a part of the Contract
4. Each item is to be individually priced and the amounts shall be added up to arrive at the
except where the item description requires the item to be priced on "as applicable" basis.
The item shall not be priced if it is "not applicable" to the bidder's design, in which case
the bidder shall add the words "NOT APPLICABLE". The wording in the item description
is for subject matter guidance only: clause references are indicative only and all other
relevant clauses shall also be referred to. The prices shall allow for all the works covered
under the bid and all liabilities and contractual obligations whether separately specified
or not. Items against which no prices are quoted shall not be separately paid for and the
bidder shall be deemed to have covered
The cost for execution of such items (according to the requirements of the bid
document) in the prices quoted for the other items.
satisfactory working of the system as specified, will not be separately paid for by the
NWRWS & KD when executed and shall be deemed to be already covered by other items
and rates listed in the price sheets and Lump sum prices quoted in Schedule.
6. Interim payment will be made as per break up given in the Price document.
Schedules shall be the basis to work out a schedule of Interim payments during
construction with the successful bidder.
8. The Consultant shall be deemed to have allowed in his price for provision, maintenance
and final removal of all temporary works of whatsoever nature required for the
inspection services for the proper execution of works. The rates shall be deemed to
include any works and setting out that may be required to be carried out for laying out
of all the works involved.
9. Prices shall be entered online and shall be entered in figures and in words. Where there
is a discrepancy between the unit rates and the amount entered, the latter shall govern.
Specifications and the other sections of these bid documents and these documents are
to be taken as mutually explanatory of one another.
11. Prices quoted by the Consultant shall be firm for the entire consultancy work of Contract
without any escalation or extra payment than tendered cost. The Quoted price should
be match with Annexure E and COST SUMMARY SCHEDULE.
12. The Consultant shall interpret the data furnished if any additional survey work or
investigation required shall be carried out by EPC Contractor.
13. The Consultant should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites at his
own cost. These accessed will be used by the other contractors working for NWRWS &
KD/ Government.
COST SUMMARY SCHEDULE
FORM OF FINANCIAL PROPOSAL
Description of Services Amount in Rs.
In Figure In words
THIRD-PARTY INSPECTION/PROJECT MANAGEMENT AGENCY FOR
THE SERVICES OF PROJECT MANAGEMENT, CONSTRUCTION,
SUPERVISION AND DESIGN REVIEW INSITE/OFFSITE INSPECTION &
TESTING OF MATERIALS, MACHINERY, EQUIPMENTS, REVIEW OF QAP Rupees
FOR PROVIDING IRRIGATION WATER FOR FILLING OF VARIOUS Thirty
PONDS SITUATED WITHIN 3.0 KM FROM EXISTING MAIN PIPELINE OF Four
SAUNI YOJANA LINK - 4 PACKAGE - 1, 2, 3, 4 & 5A (DISTRICT - Lakhs
1 SURENDRANAGAR, BOTAD, RAJKOT & AMRELI) (TALUKA - CHUDA, Rs.34,12,200/- Twelve
SAYLA, BOTAD, VINCHHIYA, JASDAN, GONDAL, GADHADA, KOTDA
SANGANI & BABRA) THROUGH VARIOUS DIA MS/HDPE PIPELINE BY
MAKING CONNECTION FROM EXISTING PIPELINE SCOUR VALVE WITH
ALL ALLIED WORKS ETC COMPLETE.
4.0 Summary of costs (Lump - sum fix price)
General Manager “Authorized person of Inspecting Firm.”
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
Construction Inspection of materials Post Construction
Pre-Construction Design Review &
Supervision & allied machineries and Activities &Defect Total
Activity Approval
activities equipment Correction Period
Title Minimum experience required
Remunerati Remunerat Duration Remunerat Duration Remunerat Duration Remunerati Remunerat
Requirem Duration Duration of
on per ion per of ion per of ion per of on per ion per
ents in engageme Engagement Months Total
month,(all month,(all Engageme month,(all Engageme month,(all Engageme month,(all month,(all
Project nt(Days) (Days)
inclusive) inclusive) nt(Days) inclusive) nt(Days) inclusive) nt(Days) inclusive) inclusive)
Part-A(Personals)
Graduate In Civil / Mechanical engineering with over 15 years’
experience in M.S. / Steel pipeline project monitoring of water supply
projects, preferably having design/office experience and having
handled projects of similar nature.
Master's degree in Structural Engineering with 10 years of
2 Senior Structural Engineer
Senior Mechanical/Safety Graduate Mechanical engineer with over 10 years’ experience in
Engineer design & inspection of pipe manufacturing, valve and instrument etc.
Water Supply & Pipeline Graduate in Hydraulics/Civil/ Mechanical Engineering with over
Engineer years of experience of similar nature.
Graduate with over 2 years of experience or diploma with over
8 Site Supervision Staff
years’ experience of site pipeline work of similar nature.
(ii) Mechanical (Mini. Two Engineer should have ASNT level-II in
UT(PAUT) as per SNT-TC-1A OR ASNT Level III in UT
11 Additional Staff
i. Surveyor Diploma Civil with minimum of 2 years’ Experience of experience
or ITI Surveyor having 2 years of experience
Ii ROU Supervisor Experience in ROU or similar nature of work
Total of Part-A
Part-B(Other Expanses)
1 TRANSPORTATION(i)Two-wheeler
TRANSPORTATION(ii)Four-wheeler
2 COMMUNICATION L.S.
3 OFFICEEXPANCESINCLUDINGRENTANDOTHEROVERHEADS L.S.
4 STATIONERYEXPANCESINCLUDINGALLCONSUMABLES L.S.
5 Any other expenses if any L.S.
Total of Part-B
Schedule of Payment
The breakup of consultancy services shall be as under:
Percentage of L.S.
Name of activity quoted price in Amount in Rs.
A Pre contract activity 2%
Design Review /
C Supervision &allied 50 %
Inspection of the
D material, machineries 28 %
Post construction &
defect correction activity
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
Schedule of Payment
A. Pre-construction Activity: 2 % of quoted price
Total Amount: _________________
Total Amount: _________________
Percentage to be
Particulars released of total amount
Particulars released of total amount
On submission of review report on
On submission of methodology &
work plan withpert chart &
required formats of various
On setting out for project with
3 required facility atsite with 60%
deployment of staff
On review of working survey &
setting out the lineout of the work
Any other matter require to
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
Schedule of Payment
B. Design Review / Approval: 10 % of quoted price
Total Amount: ________________
Total Amount: ________________
Percentage to be
Sr. released of total
B1 On approval of L.S. &G.A. 20 %
On approval of structural drawing of End 10%
structure& Road / other crossing, etc.
Design of Pipe line, Thrust block,
B3 Supporting structure, Valve chambers,
Surge devices if any, etc.
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
C. Construction & Supervision, scrutiny of design & allied activity
of work: 50% of quoted price
Total Amount: ________________
Total Amount: ________________
Further Break up of Activities for pipe line
Percentage to be
Sr. No Particulars released
of total amount
of total amount
C - A.1 M.S./ HDPE Pipeline work 50 %
C - A.2 Mechanical work 30 %
C - A.3 RCC Work 10 %
C - A.4 After Finalization of ROU 10 %
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
Further Breakup of above activity C
C-A.1 Pipeline work: 50 % of C-A Amount: ____________
Particulars to be Amount in Rs
inspection of pipe, inside & outside
1 coating of pipeand Transportation
Excavation, bedding,
2 lowering,laying & jointing of
pipeline & PAUT
4 Refilling & other items
1. The amount is to be paid on running meter basis. Per meter rate is to be arrived by
dividing the total length of transmission main. Payment is to be made as per
progress of work done. The hydro test payment is to be made after carrying out of
2. The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Note: The Contractor shall submit the copy of attendance sheet for the period of Signed
by competent authority of department.
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
C-A.2 Mechanical Items: 30 % of C Amount: ___________
Sr. Percentage to
Particulars Amount in Rs
1 On erection of Air valves 35 % of C-A.2
On erection of Scour &
miscellaneous devices.
4 commissioning of Pipeline 15% of C-A.2
Total 100% of C-A.2
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
C-A.3 RCC work: 10% of C Amount: ____________
Particulars be Amount in Rs.
1 Setting Out 10 % of C-A3
2 Work up to ground level 50 % of C-A3
3 Work up to plinth level 15 % of C-A3
4 On completion of work 25 % of C-A3
Total 100 % of C-A3
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
C-A.4 After Finalization of ROU: 10 % of C Amount: ___________
Sr. Percentage to
Particulars Amount in Rs
1 After Finalization of ROU 100 % of C-A.4
Total 100% of C-A.4
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
D. Inspection of material, machineries and equipment: 28 %quoted
Total Amount: _________________
Total Amount: _________________
Sr. No Particulars Percentage to be Amount in Rs.
D-1 Inspection of M.S. /HDPE 50 % of quoted
Pipeline amount for D
D-2 Inspection of valves and water 25% of Quoted
control hammer amount for D
devices related to Pipeline
D-3 Inspection of other 25% of quoted
Mechanical equipment. amount for D
Note: The Consultant / TPI shall submit the copy of inspection report.
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
D-2 Inspection of valves and other Equipment: 25 % of D Amount:
(MECHANICAL of Pipeline) PERCENTAGE OF QUOTED
related toD-2 AMOUNT
1. Sluice / Scour valves 50 % of quoted amount
2. Air valves 50% of quoted amount
Total Total 100 % of quoted amount
Note: The amount is to be paid on basis of quantities of mechanical and
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
E. Post Construction Activity & Defect Correction Activity : 10 % of Quoted
Price Total Amount: __________________
Price Total Amount: __________________
Schedule of Payment
(a) Post Correction Activity : 25 % of E Amount_____________
Sr. No Particulars Percentage to be Amount in
1 After Completion of testing during 95 % of E (a)
commissioning Stage
2 After clearing and tiding of sites by 5 % of E (a)
the contractor to complete &carry
out all works required to finalize
the construction contract
administratively
Total 100 % of E (a)
(b) Defect Correction Activity : 25 % of E Amount: ___________
Sr. No Particulars Percentage to be Amount in
1 On completion of outstanding 25 % of E(b)
work at time of taking over
2 After rectification of any defect 25 % of E(b)
observed during the running of
3 Proportionate payment to be 25 % of E(b)
made during defect liability period
4 After end of defect liability Period 25 % of E(b)
Total 100 % of quoted
(c) ROU Activity: 50 % of E Amount: ___________
Sr. No Particulars Percentage to be Amount in
1 On completion of ROU Payment 100 % of E(c)
as per all Govt. Section
Total 100 % of quoted
Deputy Executive Engineer Deputy Executive Engineer Executive Engineer
Sauni Yojana Sub Division Sauni Yojana Sub Division No. 2 Sauni Yojana Division
Limbdi Rajkot Rajkot
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Vol-I Pre Qaulification and Technical Proposal.pdf
2. Vol-II Financial Bid.pdf
3. Vol-II Part-2C.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .