Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-Finance 367 FARTABAD GHOSHPARA GARIA KOLKATA 700 084 | KOLKATA | KOLKATA | WEST BENGAL | 700084 | L1 | Accepted-Finance Accepted-lowest | |
| 2 | L2₹2.3 L+₹2,255 (1.00%)Rejected-Finance 12 7 CHANDIDAS AVENUE B ZONE DURGAPUR 713205 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713205 | L2 | Rejected-Finance Regretted-rate is high | |
| 3 | L3₹2.3 L+₹3,387 (1.50%)Rejected-Finance BIDHAN MARKET BARASAT | BARASAT | L3 | Rejected-Finance Regretted-rate is high | |
| 4 | Rejected-Technical NOT FOUND | - | Rejected-Technical Regretted-Insufficient documents submitted. | |
| 5 | Rejected-Technical 1 1 7 S C ROY PATH ATHPUR DIST NORTH 24 PGS P S JAGADDAL PIN 743128 | BARRACKPORE | 24 PARGANAS NORTH | WEST BENGAL | 743128 | - | Rejected-Technical Regretted-ESI not submitted. |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
31 Jan 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE BNWD
Room No.124 1ST FLOOR PURTA BHAVAN D.F. BLOCK SECTOR I SALT LAKE KOLKATA 700 091.
Day to Day Operation of Pump motor sets including minor repair of pump motor set etc. located at Vidyasagar Bhavan, Salt Lake, Kolkata-700091 in 2 (two) shift during the year 2023-2024.
2024_WBPWD_649845_2
WBPWD/EE/BNWD/NIQ32e/2023-2024
Open Tender
CIVIL WORKS
Item Rate
180 days
Salt Lake
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,000
Yes
22 Mar 2024
19 Jan 2024
2 Feb 2024
19 Jan 2024
31 Jan 2024
22 Jan 2024
Amount
Day-to-day operation of Pump Motor Set for every day 2 (two) shifts including all sorts of minor / normal maintenance of pump, motor, switch panel of pump etc. with lifting & lowering of submersible pump if required as per the direction of Engineer-in-Charge within the entire compound of at Animal Resource Development Department, Salt Lake.
Profit / Service Charges Semi-skilled Labour for operation of pump motor sets. all Days = 184 days x 2 = 368 man days.
Overall checkup for entire pump motor set, repair work of motor starter, main switch, panel board etc. including minor repair pump motor set. at regular interval as per direction by the Engineer-in-Charge.
HAZRA ENTERPRISE
TECHNO FAITH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .