Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | ₹1.1 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹1.1 L+₹1,123.90 (1.00%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹1.1 L+₹1,123.90 (1.00%) | L2 | Rejected-Finance higher than L1 |
| 3 | L3₹1.1 L+₹1,685.85 (1.50%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | ₹1.1 L+₹1,685.85 (1.50%) | L3 | Rejected-Finance higher than L1 |
Tender Value
₹1.1 L
EMD Value
₹3,000
Closing Date
20 Jun 2026, 10:00 amClosed
Executive_Engineer_NTKMD_PHED
Utility_Bldg__Beside_Delhi_Public_School_AA_ID_New_Town_Kol_700156
Repairing of HSC Vertical 30kW pump (Position - 01) Sewage pump of PS-V, AA-II at New Town under NTK Project.
2026_PHED_1025530_11
PHE/NTKMD/e-01 of 2026-27
Open Tender
Project Work
Percentage
30 days
WORK
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,000
7 Sept 2026
28 May 2026
22 Jun 2026
28 May 2026
20 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Withdrawing of HSC vertical executed 30kW sewerage pump motor set along with line shaft and part by part from underground basement of the pump house by existing hoisting arrangement with expert mechanic and labour after disconnection of power line of motor and disconnection of pump from suction and delivery line including cleaning of pump and taken out the dirty materials from inner side of pump like that polythene, parts of plastic, jute etc complete the job as per direction of EIC. | |||||
| 2Dismantling the damaged pump set part by part at worksite for necessary repairing after shifting the pump from basement to pump floor and cutting the rusted nut-bolt as per direction of EIC. | |||||
| 3Carrying charges of impeller for balancing and shaft for checking from worksite to work shop and back to site after work finish including loading and unloading complete the job as per direction of EIC. | |||||
| 4.01 | Supply of fast measuring spares as per sample for HSC vertical sewage pump :
Bearing - SKF 6313 | - | NO. | - | - |
| 4.02 | Bearing - SKF 314 | - | NO. | - | - |
| 4.03 | Gland packing | - | ITEM | - | - |
| 4.04 | Pump Body Gasket | - | SET | - | - |
| 4.05 | High Tension bolts, stud bolts, SS nut bolts washer etc. | - | ITEM | - | - |
| 4.06 | Machining of the SS shaft sleeve as per requirement | - | ITEM | - | - |
| 4.07 | "O" Ring | - | SET | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
Tendernotice_2.pdf
PDF • 0.90 MB
Tendernotice_3.pdf
PDF • 0.55 MB
Tendernotice_4.pdf
PDF • 0.04 MB
BOQ_2520045.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .