Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 LRejected-Finance | ₹3.5 L | L2 | Rejected-Finance L2 |
Updated dates
Tender Value
₹3 L
EMD Value
₹7,500
Closing Date
10 Mar 2026, 4:00 pmClosed
Assistant Forest Conservator
O/o ACF, Social Forestry, TVPM
Cost of raising and First year maintenance of Seed Orchard at Mylamoodu in Bharathannoor during 2025-26 and 2026-27
2026_FD_842604_1
KFDDO/13261/2026/A1
Open Tender
Agricultural or Forestry
720 days
Mylamoodu
Please refer Tender documents.
2 documents required · 2 mandatory
₹708
Yes
₹7,500
Yes
19 May 2026
2 Mar 2026
11 Mar 2026
2 Mar 2026
10 Mar 2026
2 Mar 2026
2 Mar 2026 - 10 Mar 2026
Clearing boundary line to a width of 1.5m to facilitate survey
Survey with prismatic compass
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm om plan), including dressing of sides and ramming of bottom, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concretes of specified grade excluding the cost of centering and shuttering - all work upto plinth level 1:5:10 (1 cement : 5 coarse sand (zone -III):10 graded stone aggregate 40 mm nominal size)
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc including cutting, hoisting, fixing positions are applying a printing cost of approve steel primer, including welding etc. complete. Hot finished welded type tubes.
Providing 4 mm wire mesh with 1x1 inch spacing including cost of material cutting, welding all labour charges, carrying materials etc complete
Finishing with epoxy paint (two or more coats) at all locations prepared and applied as per manufacturers specifications including appropriate priming coat, preparations of surface etc complete on steel work
Cost of providing gate 1.2m width and 1.2m height with all fittings
Collection of 60 cm bamboos, reed or wooden stakes for aligning and staking
Transport of stakes
Aligning of stakes
Digging pits of size 45x45x45 in ordinary soil before rain
Providing good quality two feet tail basketted seedlings (from Department nursery or other reputed firms) at site including all charges
Head load transport of basketted seedlings to planting site and distribution up to a lead of 50m (including casuality replacement ) allowed subject to actuals
Cost of cow dung / fertilizer including all charges
Application of manure
Covering pits, digging planting holes and planting
First year first weeding
Making platform of size 1mx1m with 30/2 cm depth inwards slope
Engaging man mazdoor to remove sprouted acacia seedlings and do watering as and when necessary
First year second weeding
Replacing casualities using big bag seedlings
First year third weeding
Engaging fire watcher
Contingencies including erecting plantation board
Provision for VDA
Contractor Profit (10%)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
Tendernotice_2.pdf
PDF • 0.66 MB
BOQ_1421708.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid