Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-Finance 37 B PHASE 3 INDUSTRIAL ESTATE GANGYAL JAMMU | 1 | Accepted-Finance found eligible | |
| 2 | 2₹1.3 L+₹5,300 (4.16%)Accepted-Finance GANGYAL JAMMU | 2 | Accepted-Finance found eligible | |
| 3 | 3₹1.4 L+₹9,750 (7.66%)Accepted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | 3 | Accepted-Finance found eligible |
Tender Value
Refer Docs
Closing Date
12 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Laying of foundation of Pumping Unit No. 03 along with allied works at LIS Quasbabala.
2023_IFC_201430_1
MID/AN/151
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
40 days
QUASBABALA
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer, MID Akhnoor Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
16 Jan 2023
3 Jan 2023
14 Jan 2023
3 Jan 2023
12 Jan 2023
5 Jan 2023
4 Jan 2023
Dismantling of old foundation of Pumping Unit 03 of LIS Quasbabala by way of complete disconnecting of pumping unit from the suction and delivery lines by cutting of damaged / worn-out nuts and bolts using blade cutter and manual labour and then de-coupling the pump and the motor, removing the electrical connections from the motor by means of removal of insulations and then removal of nuts and bolts from the connection thimbles using appropriate tool spanners and dismantling the pump and motor individually from the base frame, cutting damaged / worn-out nuts and bolts with the help of blade cutter and manual labour and then lifting & dragging of pump and motor with the help of manual labour from its position and then removing the base frame from the foundation by means of cutting of damaged / worn-out foundation nuts and bolts using suitable cutting arrangement. Complete Job includes cost of skilled / semi-skilled labour, material, tools & tackles charges and hire charges of cutting machine etc. Complete Job
Removal of the existing damaged foundation of pumping unit 03 by way of breaking of existing foundation using jack hammer and manual labour and then extraction of old RCC foundation material using manual labour and dumping the material with a lead of 10 m from the existing location using manual labour on head load. Job also includes manual excavation of soil for making earth pit for laying of foundation for the pumping unit. Complete Job includes cost of skilled / semi-skilled labour, material, tools & tackles charges and hire charges of jack hammer. Complete Job
Laying of pumping unit foundation by using/mixing and laying in position of cement concrete of specified grade with reinforced cement concrete including the cost of centering, shuttering, finishing and reinforcement in 1:2:4 mix. Job also includes fabrication of base frame and fixing of foundation bolts for holding base frame of pumping unit at appropriate place to ensure vibration free operation. Job also includes iron mesh welding for reinforcement and then filling the foundation with concrete and then curing the foundation for at least 8 days. Complete Job includes cost of skilled / semi-skilled labour, material, tools & tackles charges and hire charges of welding set and carriage charges for transportation of material such as cement, sand and bajri. Complete Job
Re-installation of base frame on the foundation bolts by means of providing and fixing of nuts and bolts of suitable size. Job includes dragging,lifting and fixing of pump and motor by using manual labour and installation of pump and motor on the base frame with the help of nuts and bolts of appropriate size. Job also includes resizing of coupling set for noise and vibration free operation by means of welding, machining of bore & keyway on either side of shaft (motor and pump side). Resizing of coupling bolt holes by way of welding, and drilling to proper size. Providing and fitting of new coupling nuts/bolts & rubber bushes and then providing and fixing of safety cover on the coupling. Job includes connecting the pump with suction and delivery lines by means of nuts and bolts of appropriate size and providing and replacing the old gasket. Job also includes making electrical connections to the motor by way of providing and fixing of thimbles using crimping tool and then making connections using nuts and bolts of appropriate size and then providing and fixing of cotton tape and insulation tape. Job also includes testing and commissioning of pumping unit for noise free and efficient operation. Complete job includes cost of skilled / semi-skilled labour, material, with hire charges of tools & tackles at site. Complete Job
HITECH MECHNICALS
M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .