Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹27.0 L+₹5,545 (0.21%)Rejected-AOC BUNGALOW NO 21 CANTONMENT BAREILLY 243001 | BAREILLY | UTTAR PRADESH | 243001 | L2 | Rejected-AOC ok |
Tender Value
₹27 L
EMD Value
₹54,000
Closing Date
18 Apr 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE WEST BAREILLY
GE WEST BAREILLY
Comprehensive maint of vehicles under GE West Bareilly
2022_MES_514488_1
8034/C/E8
Open Tender
Civil Works
Works
330 days
GE WEST BAREILLY
SCANNED COPY OF ENLISTMENT LETTER IN MES IN RELEVANT CLASS CATEGORY SCANNED COPY OF APPLICATION ON LETTER HEAD OF FIRMSCAN COPY OF DD OF RS 500.00 IN FAVOUR OF GE WEST BAREILLY FROM ANY NATIONALISED OR SCHEDULED BANK SCANNED COPY OF REGISTRATION O
6 documents required · 6 mandatory
₹500
Yes
GE WEST BAREILLY
₹54,000
Yes
6 May 2022
21 Mar 2022
20 Apr 2022
21 Mar 2022
18 Apr 2022
4 Apr 2022
21 Mar 2022 - 3 Apr 2022
60 days
Amount
Repair/maint of vehicles- Tata 207/Tata Xenon , once in a month for 11 Months by cleaning the vehicle from outside with the help of soap/shampoo /car washing detergent completely by removing dust and dirt from under side of the vehicle, checking of lubricants oil ,water, brake oil and other acessories fluid and top up it if required. Cleaning the vehicle from inside with the help of suction pump removing dirt and dust from complete unit, cleaning of dash board with the help of suitable mild cleaning agent of car . Cleaning of radiator of vehicle, checking its efficiency and proper functionng, checking of brake of the vehicle and do minor repair if required.Do suitable oiling and greasing. Checking allingnment of the wheels functioning of wiper, indicators ,back light ,head lights, and all electrical work like wiring and testing of all lights and bulbs complete all as specified and directed .
ditto- as above item No 1.00 but for Eicher 10.70/10.75 including Eicher with Hydraulic Telescopic ladder complete all as specified and as directed
ditto- as above item No 1.00 but for Maruti Gypsy complete all as specified and as directed
ditto- as above item No 1.00 but for Maruti Omini ,Maruti Dzire , Maruti Swift Dzire ,Maruti SX4 complete all as specified and as directed
ditto- as above item No 1.00 but for Tata Indigo complete all as specified and as directed
ditto- as above item No 1.00 but for Hindustan Ambassador complete all as specified and as directed
Repair/maint of vehicles- Motor cycle-Royal Enfield , once in a month for 11 Months by cleaning the vehicle from outside with the help of soap/shampoo/washing detergent completely by removing dust and dirt from the vehicle, checking of lubricants oil , brake oil and other acessories fluid and top up it if required. checking of brake of the vehicle and do minor repair if required.Do suitable oiling and greasing. Checking of ,clutch and accelerator,Chain & socket , indicators ,back and front light ,and testing of all lights and bulbs,repair of puncture if any ,complete all as specified and directed
ditto- as above item No 7.00 but for Motor Cycle Hero complete all as specified and as directed
Servicing and Repair/Maintenance of Vehicles- Tata 207,Tata Xenon each two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP(Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate. 2.Cost of Engine Oil included in quoted Rate. 3 Brake oil, gear oil and coolant shall be measured and paid separatley . 4 Servicing of vehicle shall be carried out at authorised workshop only. 5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Air filter ,Oil filter and Fuel filter each set of three Make - Micro ,bosh
Brake oil
Steering/gear oil
Coolant
Clutch and pressure plate set including clutch bearing and clutch cylinder,Cluthch Paddle complete Make -C K or eqlt
Head light assembly complete with Bulb and connection complete . Make - Autopal, Helonix,Lumax
Head light bulb Helogen 12 volt 60 watt Make - Autopal,Helonix
Fog lamp
Brake/ Back light Assy Make - Autopal, K K
Indicator Assy Make - Autopal, K K
Wipper Assy with blade complete make -Syndicate,Champion etc
Water pump assembly
Door Lock assembly Make -Syndicate,ATS
Coolant bottle with pipe
Wheel Arch Guard cover front and rear as per existing model of Tata 207 DI including clip and bolts
Mud pad of best quality
Side looking mirror of side doors of best quality
Fan v belt Make -Fenner
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair Road spring set Greesing incl replacement of u/s Bush set ,pin etc complete all specified and directed.
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
Master cylinder complete with booster assembly
Repair of fuel pump by overhauling and testing on testing bench including lathe works etc reassembling after repair and replacing with following items:- (a) Valve lifter -01 No (b) Spring -01 No and other items as required
Repair/replacement of Fuel injector (Nozzel set) complete all as specified and directed.
Taking down of radiator complete assembly and repair of radiator including welding/brazing works and replacement of gaskets and seal other items as required all as specified
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Denting and Painting of Vehicle part or full body in work shop including replacement of rusted M S sheet by using gas welding,applying two coat of synthetic enamelled paint over one coat of base primer and matching with existing surface complete all as specified and directed
Only painting including painting of all army sign and marking and vehicle BA No. on Number plate.
Denting and welding of broken parts complete all as directed by the Engr-in-Charge
Replacement of rusted/ damaged seat cover complete set including repair of Damaged seats and stitching work complete all as specified and directed
Supply and fixing of foot mat for Vehicle-Tata 207 complete all as specified and directed
Floor matting best quality
Replacement of door gola rubber set incl door rubber set complete all as specified and directed.
Repair of Door glass channel with Door weeding set of all doors for vehicle complete all as specified and directed.
Supply and fixing of fixing of PVC multistranded copper single core cable 25 sqmm reuired for Battery complete.
Supply and fixing of Horn assembly complete including wiring connection and fixing
Repair to gear box including bush repair/repalce and greasing etc. Complete.
Repair to tank leakage if any for the fuel tank including cleaning of tank and replacement of u/S float valve assembly and fuel tank lock and key.
Repair of puncture of tube inner
Dry Cleaning of Seat cover complete
Supply and fixing of brass battery terminal complete
Servicing and Repair/Maintenance of Vehicles- Eicher 10.70/10.75 each two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed. Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate. 2.Engine Oil will be supplied free of cost by the department but topping and refiling will be done by the contractor. 3 Brake oil, gear oil and coolant shall be measured and paid separatley . 4 Servicing of vehicle shall be carried out at authorised workshop only. 5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Air filter ,Oil filter and Fuel filter each set of three Make - Micro ,bosh
Brake oil
Gear oil
Coolant
Clutch and pressure plate set , including clutch cylinder , Clutch bearing complete Make -C K or eqlt
Head light assembly complete with Bulb and connection complete . Make - Autopal, Helonix,Lumax
Head light bulb Helogen 12 volt 60 watt Make - Autopal,Helonix
Break/ Back light Assy Make - Autopal, K K
Indicator Assy Make - Autopal, K K
Fog lamp
Wipper Assy with blade complete make -Syndicate,Champion etc
Repair to Door /Window glass with replacement of rubber beading and door glass channel complete.
Door Lock assembly Make -Syndicate,ATS
Water pump assembly
Side looking mirror of side doors of best quality
Mud pad of best quality
Coolant bottle with pipe
Fan v belt Make -Fenner
Denting and Painting of Vehicle part or full body in work shop including replacement of rusted M S sheet by using gas welding,applying two coat of synthetic enamelled paint over one coat of base primer and matching with existing surface complete all as specified and directed
Only painting including painting of all army sign and marking and vehicle BA No. on Number plate.
Denting and cutting of rusted cabin body and dala floor incl welding of broken parts with new MS sheet of suitable size complete floor of Eicher rear body complete all as directed.
Replacement of rusted/ damaged seat/seat cover complete all as specified and directed
Floor matting best quality
Supply and fixing of foot mat
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of alternator including repair/replace of rectifier assembly and repair/replace of rotor assembly complete all as specified and as directed
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, Hub greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
Master cylinder complete
Repair of fuel pump and testing on testing bench reassembling after repair and replacing with following items:- (a) Valve lifter -01 No (b) Spring -01 No and other items as required
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Supply and fixing of PVC multistranded copper single core cable 25 sqmm required for Battery
Repair of puncture of tube inner complete all as specified and directed
Repair to gear box including bush repair/repalce and greesing etc. Complete.
Repair to tank leakage if any for the fuel tank including cleaning of tank and replacement of u/S float valve assembly and fuel tank lock and key.
Supply and fixing of brass battery terminal complete
Servicing and Repair/Maintenance of Vehicles- Ambassdor car Make- Hindustan each two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate. 2.Cost of Engine oil, Brake oil, gear oil and coolant included in quoted rate. 4 Servicing of vehicle shall be carried out at authorised workshop only. 5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Air filter ,Oil filter and Fuel filter each set of three Make - Micro ,bosh
Car polish 200gm
Engine main seal rear
Gear box seal front
Gear sim
Gear box packing kit
Tapped cover gas kit
Fan belt (Fenner)
Fuel pipe set
Fuel pipe clip
Labour charge for dismantling engine complete chassis and replacement of main seal and dismantling gear box and replacement of gear box seal and other u/s part
Radiator cleaning fluid bottle
Coolant bottle with pipe
Silencer packing
Silencer belt (TVS)
Distributor paint & condenser kit (Lucus)
Float pin
Dyframe spring (carburetor)
Carburetor packing kit
Rocker
Rocker bolt
Quarter glass lock set
Steering cover
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system,leaf springs, reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
Master cylinder complete
Repair/Replacement of Electronic motorized fuel pump assembly icnl dismentling of old unsv complete all as specified and directed.
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Velvet best quality
Banyan fome
Labour charge for cutting, stitching of appropriate shape & size and fixing complete
Floor matting best quality
Foot mat
Servicing and Repair/Maintenance of Vehicles- Tata Indigo car two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate. 2.Cost of Engine Oil ncluded in quoted Rate. 3 Brake oil, gear oil and coolant shall be measured and paid separatley . 4 Servicing of vehicle shall be carried out at authorised workshop only. 5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Oil filter, Fuel Filter and air filter set of three complete
Filter element
Glow Plug
Brake Oil
Coolant
Clutch and pressure plate set , including clutch cylinder , Clutch bearing complete Make -C K or eqlt
Head light assembly complete with Bulb and connection complete . Make - Autopal, Helonix,Lumax
Head light bulb Helogen 12 volt 60 watt Make - Autopal,Helonix
Head light Relay
Break/ Back light Assy Make - Autopal, K K
Indicator Assy Make - Autopal, K K
Fog lamp
Wipper Assy with blade complete make -Syndicate,Champion etc
Replace of Front Bumper assembly with Bumpher lock plate complete all as specified and directed.
Repair to Door /Window glass with replacement of rubber beading complete all as specified.
Door Lock assembly Make -Syndicate,ATS
Water pump assembly
Side looking mirror of side doors of best quality
Fan v belt Make -Fenner
Star Box Cover
Car Freshner
Parking Light Bulb
Tissue Paper box
Dash board Perfume
Radiator cleaning fluid bottle
Coolant bottle with pipe
Silencer packing
Floor matting best quality
Supply and fixing of foot mat
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system, leaf springs ,reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
Master cylinder complete
Repair of fuel pump and testing on testing bench reassembling after repair and replacing with following items:- (a) Valve lifter -01 No (b) Spring -01 No and other items as required
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Repair to gear box including bush repair/repalce and greesing etc. Complete.
Replacement of rusted/ damaged seat/seat cover complete all as specified and directed
Denting of certain places of bumper/body, removing dents, painting 2 coat of spray paint to matching existing surfaces.
Servicing and Repair/Maintenance of Vehicles- Maruti Gypsy each two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate. 2.Cost of Engine Oil included in quoted rate. 3 Brake oil, gear oil and coolant shall be measured and paid separatley . 4 Servicing of vehicle shall be carried out at authorised workshop only. 5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Fuel Filter, Oil Filter and Air Filter set of three complete
Brake Oil
Steering/Gear Oil
Coolant
Clutch and pressure plate set including clutch bearing and clutch cylinder,Clutch Paddle complete Make -C K or eqlt
Head light assembly complete with Bulb and connection complete . Make - Autopal, Helonix,Lumax
Head light bulb Helogen 12 volt 60 watt Make - Autopal,Helonix
Head light Relay
Break/ Back light Assy Make - Autopal, K K
Indicator Assy Make - Autopal, K K
Fog lamp
Wipper Assy with blade complete make -Syndicate,Champion etc
Repair to Door /Window glass with replacement of rubber beading ,door glass ,channel with handle complete
Door Lock assembly Make -Syndicate,ATS
Water pump assembly
Side looking mirror of side doors of best quality
Fan v belt Make -Fenner
Parking Light Bulb
Perfume
Radiator cleaning fluid bottle
Coolant bottle with pipe
Silencer packing
Cable and Lugs
Air Pipe
Radiator cleaning fluid bottle
PVC side bumpers corner rear set and front set complete
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system, leaf springs ,reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:- (a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
Master cylinder complete
Repair/Replacement of Electronic motorized fuel pump assembly icnl dismentling of old unsv complete all as specified and directed.
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Repair to gear box including bush repair/repalce and greesing etc. Complete.
Roof cover best quality including stitching work and fixing complete
Floor matting best quality
Supply and fixing of foot mat
Replacement of rusted/ damaged seat/seat cover complete all as specified and directed
Denting of certain places of bumper/body, removing dents, painting 2 coat of spray paint to matching existing surfaces.
Servicing and Repair/Maintenance of Vehicles- Maruti SX4/Maruti Omini/ Maruti Swift Dzire/Maruti Dzire each two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine ,self starter , gear box FIP (Fuel Injector Pump), shaft,shocker and suspension system ,braking system inlcuding brake shoe ,Radiator cleaning, replacement of all type of filters and greasing of all wheels, Wheel alignment and wheel balancing by computerized Machine including tyre rotation etc of Vehicles including dismantling / Replacing of defective parts with new parts at workshop complete all as specified and directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate. 2. Engine oil (5W40)suitable for veh consuming 87MT gas as fuel , Brake oil, gear oil ,steering oil and coolant shall be measured and paid separatley . 3 Servicing of vehicle shall be carried out at authorised workshop only. 4.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Oil filter, Fuel Filter and Air filter set of three complete
Brake Oil
Engine Oil
Steering/Gear Oil
Coolant
Filter element
Fan belt
Clutch and pressure plate set including clutch bearing and clutch cylinder,Clutch Paddle complete Make -C K or eqlt
Head light assembly complete with Bulb and connection complete . Make - Autopal, Helonix,Lumax
Head light bulb Helogen 12 volt 60 watt Make - Autopal,Helonix
Head light Relay
Break/ Back light Assy Make - Autopal, K K
Indicator Assy Make - Autopal, K K
Cabin light assembly
Fog lamp assembly
Wipper Assy with blade complete make -Syndicate,Champion etc
Repair to Door /Window glass with replacement of rubber beading complete
Door Lock assembly Make -Syndicate,ATS
Water pump assembly
Side looking mirror of side doors of best quality
Star Box Cover
Steering/Gear handle Cover
Parking Light Bulb
Radiator cleaning fluid bottle
Coolant bottle with pipe
Silencer packing
Cable and Lugs
Mud pad of best quality
Wheel Cover set
Dashboard Lock/Fuel Tank Lock
Tissu Paper box
Tyre Polish
Dashboard Polish
Car Freshner
Car Polish
Perfume
Hand Towels
M & L for rewinding of self starter of Vehicles with super enamelled insulating copper wire of existing gauge , insulating materials including assembling and testing complete all as specified and directed by Opening and dismantling of self starter, and replacing with following items. (a) Carbon brushes -01 Set (b) Solenoid Switch -01 No (c) bendix -01 No (d) Fly wheel -01 No (as per sample).
M & L for Servicing of air conditioning including repalcement of Cabin Air filter and charging of refrigerant including electrical works complete all as specified and as directed
M & L for repair of suspension system by Dismantling front wheel and wheel joint upper and Lower of suspension system, leaf springs ,reassembling and testing after repair including replacement of following items:- (a) Suspension Kit -01 Kit, (b) Lower arm bush -08 Nos. (c) Upper arm bush -04 Nos. (d) Wheel joint upper -02 Nos. (e) Wheel joint lower -02 Nos. (f) Coil spring pad -02 Nos. (g) Tie rod end -04 Nos. (h) Upper arm bolt -02 Nos. (j) Kamani bush front -01 No. (k) Penion bearing -02 Nos. (l) Penion -01 No. (m) UJ Cross -01 No. testing complete all as specified and directed
Repair of Wheels and braking system including servicing and testing of master and slave cylinder by Dismantling front and rear wheels, greasing, brake work including replacing the following items:-(a) Brake pad front wheel -04 Nos. (b) Rear wheel brake shoes -08 Nos. (c) Wheel bearing inner -02 Nos. (d) Wheel bearing outer -02 Nos. (e) Wheel cylinder kit -01 No. (f) Brake plate assly -01 No. (g) Brake pad assembly -04 Nos.(h) Brake lining-01 No
Replacement of front shocker pressure type
Master cylinder complete
Repair/Replacement of Electric fuel pump assembly incl dismentling of old unsv complete all as specified and directed.
Opening steering assembly, removing stearing rack, lathe work, facing, ramming including replacing the following items:- (a) Centre pin bush -02 Nos. (b) Centre bearing assly -01 No. (c) Link rod repair kit, (d) Check nut -02 No. (e) Lower stearing oil -01 Ltr.
Repair to gear box including bush repair/repalce and greesing etc. Complete.
Floor matting best quality
Supply and fixing of foot mat
Replacement of rusted/ damaged seat/seat cover complete all as specified and directed
Denting of certain places of bumper/body, removing dents, painting 2 coat of spray paint to matching existing surfaces.
Servicing and Repair/Maintenance of Vehicles- Motor cycle Royal Enfield 350 CC two times at interval of five months comprising checking and repair/replacement of unserviceable spares of engine, gear box, FIP(Fuel Injector Pump), suspension system ,braking system , Chain and chain cover, Kick Assembly, replacement of filters and greasing of all wheels, of Vehicles including dismantling / Replacing of defective parts with new parts at work shop complete all as specified and directed by Engr in charge Note :-1. Spare parts shall be measured and paid separatly under relevant items here in after but fixing of the same deemed to be included in unit rate. 2.Cost of Engine Oil, Brake oil, gear oil included in quoted rate. 4 Servicing of vehicle shall be carried out at authorised workshop only. 5.Other minor consumable items like nut bolts washer , cotton waste etc are deemed to be included in the quoted rate
Ditto- but for Motor cycle -Hero
Brake shoe
Clutch plate
Brake cable
Accelerater Cable
Clutch wire cable
Air Filter
Head light assly
Kick Housing with bearing
Shock observer rear and front
Chain and socket
Point
Condenser
Spark Plug
Indicating assly
Speedometer assembly
Horn complete assembly
Back light assembly
Lock and key of fuel tank & luggage/dak box
Labour charge for seat repair including replacement of seat cover complete all as specified and directed parts
Supply and Fix Battery 12 Volt 80/75 AH Complete all as specified and directed
Supply and Fix Battery 12 Volt 65 AH Complete all as specified and directed
Retrading of unserviceable tyre of any size by dismantling and refixing the same for smooth running of the vehicle.
M & L for repair of suspension and hydraulic system of Telescopic VMTL Ladder Eicher by testing and inspection of all gear levers and release valves complete and topping up of hydraulic oil and replacement of oil pipe and air pressure pipe , hose pipe and repair and testing of trolley complete all as specified and directed
Repair and servicing of Washing Plant pump and motor including greasing of bearing checking of piston pin and valves and replacement of gaskets nozzles etc all as specified and as directed.
Repair and servicing of Air pressure pump including servicing of compressor complete and all connected electric works as required at site to make the pump serviceable including replacement/checking of piston pin and valves and replacement of gaskets nozzles etc all as specified and as directed.
Repair and servicing of Electronic Air inflator and deflator machine of air pressure pump including all connected electric works as required at site to make the machine serviceable including replacement/checking of sensor ,valves , lock and key etc all as specified and as directed.
Hose pipe for car washing pump 15 mm dia heavy duty
Notes:- (a) All the old retrived material will be the department property and the same will be depsoited to MT store yard. (b) All above vehicle shall be tested by the contractor Rep and their functionality shall be ensured on daily basis before going on duty at 8:30 AM on each working day at MT yard in presence of MES Rep. (c) All defective parts shall be replaced by contractor within 48 hrs in above listed vehicle if any breakdown/offroad condition of vehicle. In case of failure on the part of contractor to do so a panel recovery of Rs. 500/- per day per vehicle shall be made from the contractor dues.
prabhave traders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .