Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.7 LAdmitted-Finance | ₹43.7 L | L1 | Admitted-Finance |
| 2 | L2₹49.5 LAdmitted-Finance | ₹49.5 L | L2 | Admitted-Finance |
| 3 | L3₹52.3 LAdmitted-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | ₹52.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SURESH KUMAR L3 | RAJESH KUMAR GOVT. CONTRACTOR L2 | SACHIN KUMAR SHARMA L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in all kinds of soil in all leads and lifts such as pick work, jumper work in saturated/un saturated soil including bailing out water, blasting work in hard/ soft rock or chieselling in hard/soft rock where blasting in prohibited in all leads and lifts stacking the excavated earth more than 3mtr. clear from the edge of excavation and then returing the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and disposing od all surplus excavated earth as directed with in all leads and lifts and handing over the usable materials available from excavation to department free of cost as per direction of Engineer-in-charge with in all leads and lifts complete in all respect. | 213.92 | Cum. | 710 ₹1.5 L | 680 ₹1.5 L | 620 ₹1.3 L |
| 2.00 | Cutting in earth work and disposal of excavated earth in all kinds of soil in pick work, jumper work and blasting work complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | 97.5 | Cum | 850 ₹82,875 | 600 ₹58,500 | 500 ₹48,750 |
| 3.00 | Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 35.87 | Cum | 21,500 ₹7.7 L | 20,500 ₹7.4 L | 18,500 ₹6.6 L |
| 4.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | ||||||
| 4.01 | Foundations, footings, basis of columns & the like and mass concrete. | 9.23 | Cum | 21,500 ₹2.0 L | 19,500 ₹1.8 L | 19,200 ₹1.8 L |
| 4.02 | wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | 33.36 | Cum | 20,500 ₹6.8 L | 20,000 ₹6.7 L | 19,700 ₹6.6 L |
| 4.03 | Suspended floors, roofs, landing, shelves and their supports balconies, beams and girders bressumers and cantilevers upto floor two levels including all leads and lifts etc. complete in all respect. | 0.89 | Cum | 20,500 ₹18,245 | 20,000 ₹17,800 | 19,900 ₹17,711 |
| 5.00 | Providing,placing & laying of mild/tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor level with in all leads and lifts complete in all respect. | 3,065.22 | Kg | 172 ₹5.3 L | 165 ₹5.1 L | 115 ₹3.5 L |
| 6.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish including centering,shuttering,strutting and propping etc. with wooden battons and ballies,height of propping and centering below supporting floor to ceiling not exceeding 4.00 mtr and removal of the samefor in situreinforced and plain concrete work in :- | ||||||
| 6.01 | Flat surfaces such as soffits of suspended floors,roofs,landing and the like floor etc. up to 200 mm in thickness including all leads and lifts complete in all respect. | 6.36 | Sqm. | 920 ₹5,851.20 | 900 ₹5,724 | 800 ₹5,088 |
Tender Value
₹30.9 L
EMD Value
₹61,843
Closing Date
10 Apr 2026, 11:00 amClosed
EE Jal Shakti Division Katrain
EE Jal Shakti Division Katrain
(SH- C/O Sedimentation tank, C/O Filter bed, C/O barbed wire fencing around civil structure, Providing, laying, jointing and testing of GI pipes of various dia at differeng RDs)(Under PDNA at Sr.No. 18307 and 18190)
2026_HPIPH_133271_16
EE Katrain 7-50 dated 01/04/2026
Open Tender
Civil Works
60 days
Katrain
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹61,843
15 Apr 2026
3 Apr 2026
10 Apr 2026
3 Apr 2026
10 Apr 2026
3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Excavation in foundation trenches etc. in all kinds of soil in all leads and lifts such as pick work, jumper work in saturated/un saturated soil including bailing out water, blasting work in hard/ soft rock or chieselling in hard/soft rock where blasting in prohibited in all leads and lifts stacking the excavated earth more than 3mtr. clear from the edge of excavation and then returing the stacked soil in 15cm layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and disposing od all surplus excavated earth as directed with in all leads and lifts and handing over the usable materials available from excavation to department free of cost as per direction of Engineer-in-charge with in all leads and lifts complete in all respect. | - | Cum. | - | - | itemH1Code1 | |
Cutting in earth work and disposal of excavated earth in all kinds of soil in pick work, jumper work and blasting work complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | - | Cum | - | - | code1.02 | |
Providing and laying cement concrete 1:3:6 (1 cement:3 sand:6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | - | Cum | - | - | code1.03 | |
Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | - | - | - | - | code1.04 | |
Foundations, footings, basis of columns & the like and mass concrete. | - | Cum | - | - | code1.05 | |
wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | - | Cum | - | - | code1.06 | |
Suspended floors, roofs, landing, shelves and their supports balconies, beams and girders bressumers and cantilevers upto floor two levels including all leads and lifts etc. complete in all respect. | - | Cum | - | - | code1.07 | |
Providing,placing & laying of mild/tor steel reinforcement for RCC work including bending binding and placing in position complete upto floor level with in all leads and lifts complete in all respect. | - | Kg | - | - | code1.08 | |
Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5 mm so as to give a fair finish including centering,shuttering,strutting and propping etc. with wooden battons and ballies,height of propping and centering below supporting floor to ceiling not exceeding 4.00 mtr and removal of the samefor in situreinforced and plain concrete work in :- | - | - | - | - | code1.09 | |
Flat surfaces such as soffits of suspended floors,roofs,landing and the like floor etc. up to 200 mm in thickness including all leads and lifts complete in all respect. | - | Sqm. | - | - | code1.10 |
stage.html
html • 0.03 MB
techsummary_197102.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_197102.xls
BOQ • 0.41 MB
Form8.pdf
Tender Documents • 1.19 MB
Terms.pdf
Tender Documents • 0.22 MB
Download all tender documents and submit your bid