Tender Value
Refer Docs
EMD Value
₹2,700
Closing Date
17 Mar 2021, 10:00 amClosed
Officiating Commanding Officer, 43 RR Bn
43 RR Bn PIN-934543 c/o 56 APO
Installation of Three Hand Pumps at three locations Sasalkote, Irwan Khetar and Mangalnar of District Rajouri (Jammu and Kashmir)
2021_ARMY_429883_1
A/87/OS/2020-21
Limited
Civil Works
Works
7 days
Sasalkote, Irwan Khetar and Mangalnar
Please refer as per RFP
2 documents required · 2 mandatory
₹0
₹2,700
Yes
17 Mar 2021
11 Mar 2021
17 Mar 2021
11 Mar 2021
17 Mar 2021
11 Mar 2021
11 Mar 2021 - 15 Mar 2021
Installation of Hand Pump at Sasalkote Drilling of 165 mm dia bore and installation testing and commissioning of India Mark II Hand Pump
Cost of MS Casing Pipe 125 mm dia meter minimum thickness 5.4 mm
Cost of Pump Set Assembly 32 mm
Cost of Rise Pipe 32 mm dia meter B Class
Development of bore
Cost of addition Plunger Rod
Casing Shoe
Cost of Construction of Platform as per UNICEF design by using the following material : Sand
20 mm Aggregate
40 mm Aggregate
Cement
Labour Charges @ 1 day
Mason Charges @ 1 day
Installation of Hand Pump at Irwan Khetar (Thandikasi) Drilling of 165 mm dia bore and installation testing and commissioning of India Mark II Hand Pump
Cost of MS Casing Pipe 125 mm dia meter minimum thickness 5.4 mm
Cost of Pump Set Assembly 32 mm
Cost of Rise Pipe 32 mm dia meter B Class
Development of bore
Cost of addition Plunger Rod
Casing Shoe
Cost of Construction of Platform as per UNICEF design by using the following material : Sand
20 mm Aggregate
40 mm Aggregate
Cement
Labour Charges @ 1 day
Mason Charges @ 1 day
Installation of Hand Pump at Mangalnar Drilling of 165 mm dia bore and installation testing and commissioning of India Mark II Hand Pump
Cost of MS Casing Pipe 125 mm dia meter minimum thickness 5.4 mm
Cost of Pump Set Assembly 32 mm
Cost of Rise Pipe 32 mm dia meter B Class
Development of bore
Cost of addition Plunger Rod
Casing Shoe
Cost of Construction of Platform as per UNICEF design by using the following material : Sand
20 mm Aggregate
40 mm Aggregate
Cement
Labour Charges @ 1 day
Mason Charges @ 1 day
MS Mohd Rashid
FAROOQ AHMED
SHADI KHAN
SURAIYA BANO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .