Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 CrAccepted-AOC C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | ₹1.6 Cr | L-1 | Accepted-AOC ADMITTED |
| 2 | L-2₹1.9 Cr+₹21.1 L (12.9%)Rejected-AOC GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | ₹1.9 Cr+₹21.1 L (12.9%) | L-2 | Rejected-AOC ADMITTED |
| 3 | L-3₹1.9 Cr+₹21.1 L (12.9%)Rejected-AOC 417 SHAHPUR NIJ MORTA DISTT GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹1.9 Cr+₹21.1 L (12.9%) | L-3 | Rejected-AOC ADMIITED |
| 4 | L-4₹1.9 Cr+₹22.3 L (13.6%)Rejected-AOC | ₹1.9 Cr+₹22.3 L (13.6%) | L-4 | Rejected-AOC ADMITTED |
| 5 | L-5₹1.9 Cr+₹23.4 L (14.3%)Rejected-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.9 Cr+₹23.4 L (14.3%) | L-5 | Rejected-AOC ADMITTED |
| Sl No | Description | Qty | Unit | M/S OM ENTERPRISES L3 | PURNAGIRI CONSTRUCTION CO. PVT. LTD. L6 | SINGH CONTRACTOR L2 | M/S OM BALA JEE CONSTRUCTION L1 | GOMATINETRA CONSTRUCTIONS L5 | VIJAY ASSOCIATES L4 | M/S UNITE ENTERPRISES L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in ordinary soil including 1.50m lift and 30m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as directed by Engineer- in-Charge. | 15,902 | Cum | 55 ₹8,74,610 | 37 ₹5,88,374 | 66.65 ₹10,59,868.3 | 10 ₹1,59,020 Lowest | 40 ₹6,36,080 | 50 ₹7,95,100 | 65 ₹10,33,630 |
| 2.00 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade 13.112.1 work (Two or more coats applied @ 1.43 Itr/ 10 sqm) over existing cement paint surface including all cost of labour, material and T&P etc. Complete. | 8,041 | Sqm. | 90 ₹7,23,690 | 110 ₹8,84,510 | 101.75 ₹8,18,171.75 | 60 ₹4,82,460 Lowest | 80 ₹6,43,280 | 100 ₹8,04,100 | 115 ₹9,24,715 |
| 3.00 | Supplying and Laying of 240 GSM Geotextile sheet below Pitching on slopes & top of shank including all cost of labour, material and T&P etc with all taxes but excluding cost of G.S.T. required for proper completion of work as per Engineer-In-Charge. | 2,824 | Sqm. | 100 ₹2,82,400 | 120 ₹3,38,880 | 109.12 ₹3,08,154.88 | 100 ₹2,82,400 | 80 ₹2,25,920 Lowest | 100 ₹2,82,400 | 95.15 ₹2,68,703.6 |
| 4.00 | Laying Sand Below Boulder Pitching including all cost of labour, material and T&P etc. Complete (as per drawing) | 740 | Cum | 75 ₹55,500 | 100 ₹74,000 | 164.3 ₹1,21,582 | 103 ₹76,220 | 40 ₹29,600 Lowest | 200 ₹1,48,000 | 315.25 ₹2,33,285 |
| 5.00 | Relaying dry boulder pitching including dismantling of old and damaged pitching with 20 to 40 kg boulder, with cost of all new material , labour, T&P etc for completion of work per cum. | 936 | Cum | 1,250 ₹11,70,000 | 1,500 ₹14,04,000 | 1,287.63 ₹12,05,221.68 | 500 ₹4,68,000 Lowest | 1,250 ₹11,70,000 | 1,150 ₹10,76,400 | 1,650 ₹15,44,400 |
| 6.00 | Supply and filling of mechanically woven double twisted Hexagonel shaped wire mesh gabion box/crate of size 3.00 x1.50x 1.00 M mesh size 10 cm x 12 cm 10 SWG G.I. wire with 40kg. to 60kg. boulder size as directed by Engineer in charge & also including all cost of material, labour & T&P etc. | 94 | Nos. | 12,000 ₹11,28,000 | 13,000 ₹12,22,000 | 11,396.29 ₹10,71,251.26 | 10,000 ₹9,40,000 Lowest | 11,000 ₹10,34,000 | 10,000 ₹9,40,000 Lowest | 10,845.5 ₹10,19,477 |
| 7.00 | Supply and Dumping of Boulder Size 40-60Kg boulder size as directed by Engineer in charge & also including all cost of material, labour & T&P etc. | 420 | Cum. | 2,160 ₹9,07,200 | 2,500 ₹10,50,000 | 2,012.94 ₹8,45,434.8 | 2,560 ₹10,75,200 | 2,200 ₹9,24,000 | 410 ₹1,72,200 Lowest | 2,045 ₹8,58,900 |
| 8.00 | Supply & Fixing SOLAR PHOTO VOLTAIC POWER GENERATION SYSTEM Supplying, installation, testing and commissioning, roof top solar photo voltaic power generation system including space fram 5KW Solar System including all cost of Battery, Solar pannel and Solar Inverter Material, Labour, T&P Etc. Complete. | 3 | Per Nos. | 1,98,000 ₹5,94,000 Lowest | 2,40,000 ₹7,20,000 | 2,26,610 ₹6,79,830 | 2,20,000 ₹6,60,000 | 2,40,000 ₹7,20,000 | 2,70,000 ₹8,10,000 | 2,72,000 ₹8,16,000 |
| 9.00 | S&F of 32 Amp. 415 V metal clad TPN HRC type switch fuse unit complete with HRC fuse on angle iron bracket complete in all respect.
Cat. B | 3 | No | 1,658 ₹4,974 Lowest | 2,200 ₹6,600 | 4,843.75 ₹14,531.25 | 2,300 ₹6,900 | 1,800 ₹5,400 | 2,150 ₹6,450 | 2,150 ₹6,450 |
| 10.00 | S&F of 16 Amp. 415 V metal clad TPN HRC type switch fuse unit complete with HRC fuse on angle iron bracket complete in all respect.
Cat B | 5 | No | 1,335 ₹6,675 Lowest | 1,800 ₹9,000 | 3,255 ₹16,275 | 1,820 ₹9,100 | 1,500 ₹7,500 | 1,750 ₹8,750 | 1,450 ₹7,250 |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
4 Oct 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Duni Barrage ke navinikaran ka karye.
2025_UPIDC_1075777_1
02/SE/2025-26
Open Tender
Civil Works
Item Rate
365 days
PILIBHIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹4.8 L
Yes
4 Nov 2025
22 Sept 2025
4 Oct 2025
22 Sept 2025
4 Oct 2025
22 Sept 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .