Tender Value
₹3.9 Cr
EMD Value
₹7.9 L
Closing Date
8 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
SM (WC-2) Sector 19 Noida
SM (WC-2) Sector 19 Noida
M/o Road (Theme painting work in Film City Flyover elevated wall and loop from sector-27 to sector- 60 Repair of drain footpath Katchi patries for sector-61 service road on M.P.-2 road Construction of R.C.C. Footpath repair of drain and fixing of M.
2026_NOIDA_1163453_1
17/GM/SM(WC-2)/CB/ET/2026-27
Open Tender
Civil Works - Others
180 days
Noida
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
Yes
Noida
₹7.9 L
Yes
24 Jun 2026
24 Jun 2026
9 Jul 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 150.5 | cum | 144.93 | ₹21,811.97 |
| 0.0 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100.0 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 79.5 | Cum | 5,214.8 | ₹4,14,576.6 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (Zone-III) : derived from natural sources: 8 graded sone aggregate 40 mm nominal size derived from natural sources). | 24.5 | cum | 5,746.88 | ₹1,40,798.56 |
| 0.0 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) : derived from natural sources: 4 graded sone aggregate 20 mm nominal size derived from natural sources) | 105 | Cum. | 7,790.67 | ₹8,18,020.35 |
| 0.0 | 12 mm cement plaster of mix : 1:4 (1 cement : 4 coarse sand) | 988 | Sqm | 176.77 | ₹1,74,648.76 |
| 0.0 | Neat cement punning. | 683 | Sqm. | 39.13 | ₹26,725.79 |
| 0.0 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required . In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 12,318.94 | Kg | 92.34 | ₹11,37,530.92 |
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge | 218 | Cum | 136 | ₹29,648 |
| 0.0 | Providing and laying 500 x 500 x 40 mm thick turf paver (Turf paver XD) on 150 mm thick sub grade of compacted bed of 20 mm thick nominal size stone aggregate and base course and filling with 150 mm thick Jamuna Sand including, spreading well ramming, consolidating, and finishing smooth etc. all complete as per direction of E/I. | 151 | sqm. | 1,377.71 | ₹2,08,034.21 |
| 0.0 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within
50 metres lead as per direction of Engineer - in- charge. | 4 | Cum | 1,347.16 | ₹5,388.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_2181096.xls
BOQ • 0.29 MB
C17.xls
Additional Documents • 0.05 MB
TD17.pdf
Tender Documents • 9.31 MB
Download all tender documents and submit your bid