Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹1.9 L+₹1,934 (1.05%)Rejected-Finance 2ND FLOOR 76A PHUL SARAI RANCHI ROAD DISTT RAMGARH JHARKHAND | RAMGARH | JHARKHAND | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹1.9 L+₹3,650 (1.99%)Rejected-Finance | L3 | Rejected-Finance Due to L3 |
Tender Value
₹2.2 L
EMD Value
₹2,700
Closing Date
29 Jan 2024, 6:00 pmClosed
Project Engineer (Excv), Tapin North OCP
Office of Project Engineer (Excv.), Tapin North OCP, Hazaribagh Area
Repairing of Center bearing assembly articulated joint and both side steering cylinder of Tyre handler BL14TH at Tapin North OCP, Hazaribagh Area.
2024_CCL_298871_1
PE(X)/Tapin (N) OCP/NIT/23-24/070 Dated 17.01.2024
Open Tender
Excavation Department Work
Item Rate
15 days
Tapin North OCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,700
10 Apr 2024
17 Jan 2024
30 Jan 2024
17 Jan 2024
29 Jan 2024
17 Jan 2024
17 Jan 2024 - 22 Jan 2024
Amount
Industrial gas set for cutting of bend, worn out pin, bush and bulged material from both rod end of cylinder
Material filling in all four eyes, housing of both steering cylinder and with suitable electrode.[Lomelt – 210]
Replacement of lock pin(355IN11273)
Replacement of seal kit(355HC00144)
Replacement of steering system hose (355PS91036).
Hiring cost of welding machine, grinding machine and special tools tackles - 01 set for job completion
Grinding stone for finishing and smoothening. [size- 4”]
Supervisor(01 Person per shift per day x 02 days)
Fitter/Welder (02 Person per shift per day x 02 days)
Helper( 02 Person per shift per day x 02 days)
Industrial gas set.
Gauging electrode. L-602 [cutrod]
Steel electrode [Lomelt 210]
Line boring charges.
Grinding stone for finishing and smoothening. [size- 4”]
Hiring cost of welding machine, grinding machine and special tools tackles - 01 set for job completion
Supervisor (01 Person per shift per day x 05 days)
Welder (02 Person per shift per day x 05 days)
Fitter/machinist (02 Person per shift per day x 05 days)
Helper (03 Person per shift per day x 05 days)
Total impact of GST for the purpose of CTC
VIDYA ENTERPRISES
M/S R.S ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .