| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78.0 LAdmitted-Fee/PreQual/Technical/Finance | +11.51% | ₹78.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹80.4 LAdmitted-Fee/PreQual/Technical/Finance NEAR TARAPUR LAXMI DRIVING SCHOOL TARAPUR MOHANPUR WEST TRIPURA 799211 | WEST TRIPURA | TRIPURA | 799211 | +15.00% | ₹80.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹69.9 L
EMD Value
₹1.4 L
Closing Date
30 Jul 2026, 3:00 pmClosed
Executive Engineer TJB Division I Agartala
O/O the Executive Engineer TJB Division I Agartala
Remodelling and Extension of HDPE pipeline at different areas under AMC South Zone within DWS Sub Division No II Milansangha Agartala
2026_Urban_74866_1
17/CE/TJB/2026-27
Open Tender
Civil Works - Water Works
Percentage
365 days
Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹4,000
₹1.4 L
31 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
30 Jul 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavating trenches of required width for pipes, cables etc. including exacavation for sockets, dressing of sides where required, ramming of bottoms, depth upto 1500 mm (slope-1 in 200)including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter - 2 of CPWD specification and direction of the Engineer - in - Charge. For UPVC pipes in new work In all kinds of soil | |||||
| 1.01 | For pipes not exceeding 90 mm dia | 3,500 | mtr | 87.6 | ₹3,06,600 |
| 1.02 | For pipes exceeding 90 mm dia but not exceeding 300 mm dia | 1,800 | mtr | 106.4 | ₹1,91,520 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 60 | cum | 1,177.3 | ₹70,638 |
| 3 | Demolishing of existing C.C. Road /Pavement (manually) for repairing of leakage/pipe line Blockages in/c. re-filling the same with available materials complete as per direction of Engineer-In-Charge. | 300 | sqm | 977.5 | ₹2,93,250 |
| 4 | Cement concrete 1:2:4 in pavements, laid to required slope and camber in panels Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of sand, filling the joints with fine sand etc. all complete as per specification and approval/ direction of the Engineer-in-charge. Cement concrete 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete as per direction of the of the Engineer-in-Charge. | 40 | cum | 10,629.7 | ₹4,25,188 |
| 5 | Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202. | 30 | cum | 859.2 | ₹25,776 |
| 6 | Charges for Brick Soiling Laying flat Brick Soiling on prepared subgrade ( excluding the cost of bricks but including the cost of binding materials) according to line, grades and cross section show on the drawing, filling joints with earth free from clay as per Mord Technical Specification clause 412.
(Without road roller)
Analysis Rate | 250 | sqm | 48.42 | ₹12,105 |
| 7Supplying, laying, jointing, testing and commissioning of approved make PN 10, HDPE water supply pipe mains manufactured as per IS-4984 in PE-100, grade. Jointing shall be butt welding/electrofusion/flange joint. The quoted rate shall also include necessary fittings (Tee, Bends etc) of same quality as pipe material complete as specified in the technical specifications, drawing and instruction of Engineer -in-Charge. | |||||
| 7.01 | 90 mm OD pipes | 3,500 | meter | 883.86 | ₹30,93,510 |
stage.html
html • 0.02 MB
finance_76211.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.14 MB
DNIT.pdf
Tender Documents • 2.33 MB
BOQ_76211.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].