| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC | ₹4.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 Cr+₹47.3 L (11.5%)Rejected-Finance | ₹4.6 Cr+₹47.3 L (11.5%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified |
| Sl No | Description | Qty | Unit | akbar L1 | BUILDUS iCS LLP L2 |
|---|---|---|---|---|---|
| 1.00Construction of Dormitory cum Multimedia and Library Centre at Kaikatty | |||||
| 1.00 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 225 | sqm | 18.19 ₹4,092.75 Lowest | 18.19 ₹4,092.75 Lowest |
| 1.00 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | 135 | cum | 257.63 ₹34,780.05 Lowest | 257.63 ₹34,780.05 Lowest |
| 1.00 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m | 45 | cum | 318.47 ₹14,331.15 Lowest | 318.47 ₹14,331.15 Lowest |
| 1.00 | 2.7.1
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.Ordinary rock | 145.6 | cum | 517.87 ₹75,401.87 Lowest | 517.87 ₹75,401.87 Lowest |
| 1.00 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 10.83 | cum | 7,932.89 ₹85,929.06 Lowest | 7,932.89 ₹85,929.06 Lowest |
| 1.01 | 60.2.1
EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 58.18 | cum | 729.39 ₹42,432.99 Lowest | 729.39 ₹42,432.99 Lowest |
| 1.01 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse
sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | 15.68 | cum | 9,235.97 ₹1,44,783.07 Lowest | 9,850.3 ₹1,54,413.3 |
| 1.01 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | 132 | sqm | 386.16 ₹50,973.12 Lowest | 386.16 ₹50,973.12 Lowest |
| 1.01 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 45.61 | cum | 10,488.77 ₹4,78,371.82 Lowest | 12,500.3 ₹5,70,113.68 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
9 Jun 2026, 4:00 pmClosed
ENGINEER (PROJECTS)
KEL MAMALA KOCHI
Forest and Wildlife Department- Development of Nelliyampathy Eco Tourism under Nenmara Forest Division, Palakkad District
2026_KEL_853734_1
KRO/BDC/2410/2026
Open Tender
Civil Works - Buildings
Item Rate
KEL MAMALA KOCHI
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,850
₹1 L
Yes
1 Jul 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
9 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Dormitory cum Multimedia and Library Centre at Kaikatty | |||||
| 1.001 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5
m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - |
| 1.003 | 2.25
Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m | - | cum | - | - |
| 1.004 | 2.7.1
Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.Ordinary rock | 1 | cum | - | - |
| 1.005 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 60.2.1
EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | - | cum | - | - |
| 1.007 | 4.1.3
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse
sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | - | cum | - | - |
| 1.008 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.009 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1442833.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .