| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.0 LAccepted-Finance | L-1 | Accepted-Finance Accepted | |
| 2 | L-2₹20.2 L+₹24,834 (1.24%)Accepted-Finance | L-2 | Accepted-Finance Accepted | |
| 3 | L-3₹21.6 L+₹1.6 L (8.06%)Accepted-Finance | L-3 | Accepted-Finance Accepted | |
| 4 | L-4₹22.1 L+₹2.1 L (10.5%)Accepted-Finance | L-4 | Accepted-Finance Accepted | |
| 5 | L-5₹22.5 L+₹2.5 L (12.4%)Accepted-Finance | L-5 | Accepted-Finance Accepted |
Tender Value
₹32.3 L
EMD Value
₹64,505
Closing Date
7 Aug 2026, 3:00 pmClosed
Executive Engineer, PWD, SER-1, New Delhi
O/o Executive Engineer, PWD, SER-1, New Delhi-110065
A/R and M/O to various roads under Sub-Division SER-12 of Division SER-1 during 2026-27. (SH - Installation of Overhead Sign Boards infront of Jamia Millia Islamia University).
2026_PWD_296223_1
66/EE/SER-1/PWD/2026-27
Open Tender
Civil Works
Percentage
60 days
Assistant Engineer, SER-12
As per NIT
10 documents required · 10 mandatory
₹0
₹64,505
13 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 22.03 | Cum | 196 | ₹4,317.88 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, disposed earth to be leveled and neatly dressed. All kinds of soil | 26.24 | Cum | 177.5 | ₹4,657.6 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 1.3 | Cum | 6,812 | ₹8,855.6 |
| 4 | Centering and shuttering including strutting propping etc. and removal of form for all heights, Foundations, footings, bases of columns etc for mass concrete. | 25.92 | Sqm | 392.15 | ₹10,164.53 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 421.2 | Kg | 107.85 | ₹45,426.42 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works upto plinth level.
Concrete of M25 grade with minimum cement content of 330 kg /cum | 4.21 | Cum | 9,149.1 | ₹38,517.71 |
| 7 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 11,587.87 | Kg | 194.4 | ₹22,52,681.93 |
| 8 | Providing and fixing mild steel round holding down bolts with nuts and washer plates complete. (DSR 2018 - Item 10.19) | 540 | Kg | 97.2 | ₹52,488 |
| 9 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On steel work | 380.64 | Sqm | 241.75 | ₹92,019.72 |
| 10 | Disposal of building rubbish / malba / similar unserviceable, dismentled or waste materials by mechinical means including loading transporting, unloading to approved muncipal dumping ground or as approved by engineer in charge, beyong 50m initial lead, for all leads including all lifts involved | 4.21 | Cum | 263.95 | ₹1,111.23 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.93 MB
BOQ_394290.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .