| 4 | Admitted-Finance 405 1 RISHI BANKIM DEULPARA RABINDRA PATH NAIHATI DIST 24 PGS NORTH PIN 743 165 | NAIHATI | NORTH 24 PARGANAS | WEST BENGAL | 743165 | Admitted-Finance |
Tender Value
₹53.5 L
EMD Value
₹26,750
Closing Date
21 Aug 2020, 3:00 pmClosed
Managing Director WBEIDC Ltd
Webel Bhavan Salt Lake SEC V EP GP Block KOL 91
Civil and allied works for creation of temporary parking arrangement at vacant plot no BN6 SEC V Salt Lake KOL 91
2020_WEBEL_291453_1
07/Webel/IDM/BN4/AUDI/20-21/20
Open Tender
IT WORKS ORG
Item Rate
60 days
Salt Lake SEC V Kolkata
Please refer to the tender documents
6 documents required · 6 mandatory
₹1,000
WBEIDC Ltd
₹26,750
Please refer to the NIT document PG No 6 and 7
8 Jan 2021
30 Jul 2020
21 Aug 2020
30 Jul 2020
21 Aug 2020
7 Aug 2020
6 Aug 2020
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. By Mechanical Means. In area of thorny jungle
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with any lead. conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge..(Area of canal surface to be considered)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 5000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works). Material Supply by Contractor.
Granular Sub-base with Graded Material (Table:- 400-1). By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).Grading - II :
Brick pavement with 1st class / picked jhama bricks (as per direction of Engineer in charge) with joints set closed in cement mortar 1:6 including preparation of bed by cutting or filling with ramming the filled up earth to the same profile as that of the finished pavement. Rate is inclusive of cost of supply of all materials, labour and all incidental charges in this connection. When laid in cement mortar (1:6) on the underside as well. One brick on edge pavement laid in herring bone bond pattern.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
Painting the vertical end faces of posts, wheel guards or railing or parapet with alternate bands of different colours as directed by the Engineer-in-charge with approved synthetic enamel paint. Two Coats
Painting Lines, Dashes, Arrows etc on Roads (New) in Two Coats on New Work Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control (Referenceto MORT&H'sspecification803). Over 10 cm in width
Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge..(Area of canal surface to be considered)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 5000 m as per Technical Specification Clause 301.5 for Rural Roads of MORD. (Mode of measurement: pre works and post works). Material Supply by Contractor.
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with any lead. conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge..(Area of canal surface to be considered)
Granular Sub-base with Graded Material (Table:- 400-1). By Mix in Place Method : Construction of granular sub-base by providing graded material, mixing by mix in place method with Rotavator at OMC, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants including cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).Grading - II :
Brick pavement with 1st class / picked jhama bricks (as per direction of Engineer in charge) with joints set closed in cement mortar 1:6 including preparation of bed by cutting or filling with ramming the filled up earth to the same profile as that of the finished pavement. Rate is inclusive of cost of supply of all materials, labour and all incidental charges in this connection. When laid in cement mortar (1:6) on the underside as well. One brick on edge pavement laid in herring bone bond pattern.
CREW FOR YOU HANDYMAN SERVICE PVT LTD.
R, B, ENTERPRISE
D. M. Constructors
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .