| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance | L1 | Accepted-Finance L 1 Bidder | |
| 2 | L2₹4.6 L+₹2,277.84 (0.50%)Rejected-Finance NOAPARA GANGANAGAR KOLKATA 700132 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700132 | L2 | Rejected-Finance Not L1 Bidder | |
| 3 | L3₹4.6 L+₹4,555.69 (1.01%)Rejected-Finance | L3 | Rejected-Finance Not L1 Bidder | |
| 4 | L4₹4.6 L+₹5,922.39 (1.31%)Rejected-Finance 15 KISHNA GHOSH LANE GORABAZAR P O BERHAMPORE DIST MURSHIDABAD WEST BENGAL 742101 | BERHAMPORE | MURSHIDABAD | WEST BENGAL | 742101 | L4 | Rejected-Finance Not L1 Bidder | |
| 5 | L5₹4.6 L+₹11,389.22 (2.51%)Rejected-Finance N A | NA | NA | 121004 | L5 | Rejected-Finance Not L1 Bidder |
Tender Value
₹4.6 L
EMD Value
₹9,111
Closing Date
7 Oct 2026, 1:00 pmClosed
Assistant Engineer, PWDte.Dum Dum Sub Division
DAO- I, KOLKATA NORTH DIVISION, PWDte.. AND EXECUTIVE ENGINEER, KOLKATA NORTH DIVISION, PWDte.
Emergent relocation of pedestrian cutout at Dunlop crossing at B.T. Road under Kolkata North Division, P.W.Dte druing the year 2026_2027
2026_WBPWD_5076531_1
WBPWD AE DDSD/NIeT-11/2026-2027
Open Tender
CIVIL WORKS
Percentage
15 days
Dunlop crossing at B.T. Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,111
Yes
14 Oct 2026
30 Sept 2026
9 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 3.33 | cum | 7,370.65 | ₹24,544.26 |
| 2 | Taking out existing kerb stones of all types from foothpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 9 | metre | 39.35 | ₹354.15 |
| 3 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except
at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineerin-charge
(length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | 1.67 | cum | 10,117.6 | ₹16,896.39 |
| 4 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 540 | kg | 172.6 | ₹93,204 |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work | 24 | sqm | 155.9 | ₹3,741.6 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work | 13.32 | sqm | 160.6 | ₹2,139.19 |
| 7 | Modified Estimate Cost after using correction factor on DSR 2023 on account of GST @ 0.973 as per O.M. Issusd by DG, CPWD, vide no. 158/SE/(TAS)/GST/2024/02-Dated 08/08/2024 on "D" [E] & Add Enhancement for Index for Bonhoogly( No. 34(1)/SDG(Kol)/Cost Index/2026/915, Dated. 19.05.2026@ 15% On "D" (F) | 0.12 | X | 1,40,879 | ₹16,757.13 |
| 8 | Dismantling of flexible pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202).
By Manual Means
Bituminous courses | 7.54 | cum | 819.65 | ₹6,180.16 |
| 9 | Dismantling of flexible pavements
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202).
By Manual Means
Granular course | 25.63 | cum | 582.01 | ₹14,916.92 |
| 10 | Sand Filling in Foundation Trenches
Sand Filling in Foundation Trenches with good local sand free from earth not exceeding 150 mm compacted thickness including inundating each layer by profuse water and porking and rammimg layer by layer. Quality of sand is to be approved by the Engineer-in-charge.(Reference to MORT&H's specification 304). | 4.32 | cum | 1,857.71 | ₹8,025.31 |
stage.html
html • 0.10 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_5170491.xls
BOQ • 0.26 MB
2911_Form.pdf
Tender Documents • 0.54 MB
AnnexureXnew.pdf
Additional Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .