| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -14.99% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.4 CrAdmitted-Finance | -14.99% | ₹1.4 Cr | L1 | Admitted-Finance |
| 3 | L2₹1.5 CrAdmitted-Finance | -9.99% | ₹1.5 Cr | L2 | Admitted-Finance |
| 4 | L3₹1.6 CrAdmitted-Finance BHAWANIPATANA KALAHANDI PIN 766001 | KALAHANDI | ODISHA | 766001 | -6.49% | ₹1.6 Cr | L3 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical CLAUSE NO.116(I) OF DTCN |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
9 Dec 2025, 5:00 pmClosed
CHIEF CONSTRUCTION ENGINEER
Chief Construction Engineer Jeypore R and B circle Jeypore
CIVIL WORKS
2025_EICCL_121660_5
CCEJC R AND B 12/2025-26
National Competitive Bid
Civil Works - Buildings
270 days
NABARANGPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.7 L
Yes
12 Feb 2026
25 Nov 2025
10 Dec 2025
25 Nov 2025
9 Dec 2025
25 Nov 2025
Civil Works
S/F. of 32A. ICDP Main Switch of Havels/Anchor make on M.S. box with bakelite front cover including all accessories & connections.
S/F. OF 2x6mm² PVC Al. Twin core Un-bonded wire of ISI marked.(Make-Havels/Polycab)
S/F. of 32A. D.P. MCB on M.S.Box with bakelite front cover including all connections.
Providing & applying of pre constructional anti-termite treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (PREMISE, IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with 47.5ltr water) pumped these holes to soak the soil @ 1 ltr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P , all taxes and hire charges of machinaries as per direction of Engineer-in-charge.
Earthwork excavation in foundation in hard soil within initial lead of 50m and intial lift of 1.5m including rough dressing and levelling the bed & as per specifiction approved by the E.I.C.
Supplying and filling in foundation trenches and plinth with sand, well watered and rammed in layers not exceeding 23cm in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and , materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as directed by the Engineer-in-Charge.
A. Foundation & Plinth
a. Column Footing
b. PLINTH BEAM
B. Column shaft
Ground Floor
First Floor
Second Floor
C. Lintel
Ground Floor
First Floor
Second Floor
D. Stair Case
Ground Floor
First Floor
Second Floor
E. Chajja
Ground Floor
First Floor
Second Floor
F. Roof Beam
Ground Floor
First Floor
Second Floor
G. Roof slab
Ground Floor
First Floor
Second Floor
Ground Floor
First Floor
Second Floor
H. Shelves
Ground Floor
First Floor
Second Floor
Filling foundation and plinth with excavated materials including watering and ramming complete in all respect as directed by the Engineer-in-Charge
Ground Floor
First Floor
Second Floor
Providing and lying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4cm (1 1/2") 0 mm & down grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading,cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge.
Providing, lifting, hoisting and laying Reinforced cement concrete of M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 200 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position complete as per direction of Engineer-In -Charge.
Ground Floor
First Floor
Second Floor
Supplying, Cutting, Straightening coiled or bent up M.S. rods or Tor steel of SAIL(HYSD Fe-500) welding or jointing if necessary, bending, binding, tying the grills and laying in position as required for R.C.C. works and hoisting, lowering and placing in position in all floors according to approved designs and drawings including cost, conveyance, of M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P etc. complete in all respect as directed by the Engineer-in-charge All reinforcement steel and structural steel shall be procured from primary producers of steel-SAIL/RINL/TATA/JINDAL(Panther)/SHYAM STEEL.
Ground Floor
First Floor
Second Floor
Supplying, fitting, fixing of, M.S Grill for (MS Door, MS GATE ,M.S grill ,, MS Square Bar Spike to openings,tubular trusses and collapsible gate ) of approved specification and of approved size, materials and design with a coat of primer including painting two coats over a coat of redoxide primer with cost and conveyance of all materials, labour, royality, etc. complete in all respect and as per direction of Engineer-in-charge.
Ground Floor
First Floor
Second Floor
Brickwork with Fly ash bricks in cement mortar (1:6) in F&P (23cm x 11cm x 8 cm) having minimum crushing strength not less than 75 kg.per.sq.cm. including splays cutting, circular moulding, chamfering, corbelling and similar such type of woks with all necessary projections watering and curing for 7 days after immersing the bricks in water for six hours before use etc. complete including cost and conveyance of all materials, labour with T&P required for the work and royalties etc. complete in all respect as per direction of Engineer in charge.
Ground Floor
First Floor
Second Floor
Brickwork with Fly ash bricks in cement mortar (1:6) in Superstructure (23cm x 11cm x 8 cm) having minimum crushing strength not less than 75 kg.per.sq.cm. including splays cutting, circular moulding, chamfering, corbelling and similar such type of woks with all necessary projections watering and curing for 7 days after immersing the bricks in water for six hours before use etc. complete including cost and conveyance of all materials, labour with T&P required for the work and royalties etc. complete in all respect as per direction of Engineer in charge.
Ground Floor
First Floor
Second Floor
Brickwork with Fly ash bricks in cement mortar (1:4) in Superstructure (23cm x 11cm x 8 cm) having minimum crushing strength not less than 75 kg.per.sq.cm. including splays cutting, circular moulding, chamfering, corbelling and similar such type of woks with all necessary projections watering and curing for 7 days after immersing the bricks in water for six hours before use etc. complete including cost and conveyance of all materials, labour with T&P required for the work and royalties etc. complete in all respect as per direction of Engineer in charge.
Ground Floor
First Floor
Second Floor
12mm (1/2'') thick cement plaster in cement mortar (1:6) finished smooth to brick walls after raking out the joint including watering and curing for seven days with cost and conveyance of all materials and labour with T& P required for the work and royalities etc. complete in all respect as per direction of Engineer in charge.
16mm (5/8'') thick cement plaster (1:6) finished smooth to inside of 9''/10'' thick brick walls after raking out the joint including watering, curing for seven days with cost and conveyance of all materials and labour with T&P required for the work and royalities etc. complete in all respect as per direction of Engineer in charge.
Providing and fixing rain water down pipe with necessary bend shoes and heads including cost of 110mm dia PVC pipe, clamps and nails etc. with all cost, conveyance, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M20 Concrete.
Ground Floor
First Floor
Second Floor
6mm thick cement plaster (1:4) finished smooth to R.C.C surfaces finished smooth including closed deep chipping and slurry treatment including watering, curing for seven days with cost and conveyance of all materials and labour with T&P required for the work with royalities etc. complete in all respect as per di
Ground Floor
First Floor
Second Floor
rection of Engineer in charge.
Ground Floor
First Floor
Second Floor
Providing and laying Granular Sub-base of Grade-VI stone screening materials as per approved drawing and technical specifications as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge.
Ground Floor
First Floor
Second Floor
Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride(UPVC) ( FENESTA / NCL VEKA LTD.) Three Track - Three Panel sliding window– 60- Series duly manufactured using UPVC reinforced profiles of 108mm x 45 mm x 2.5 mm for outer frames and Window Sash of 39 mm x 58 mm x 2.5 mm capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the window frame shall be fitted with 6 mm thick clear toughened glass of SAINT-GOBAIN make duly fixed with EPDM weathering seal resistant and the system is to be installed using Reinforced Large Coupler at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D 638-14,EN-477-95 and other applicable codes and standards
Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride (UPVC) ( FENESTA / NCL VEKA LTD.) Ventilator/ Top Hung – 60- Series duly manufactured using UPVC reinforced profiles of 60 mm x 55 mmx2.5 mm for outer frames, 75 mm x 60 mm x 2.25 mm for casement Window Sash Profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the window sash shall be fitted with 6 mm thick clear toughened glass of SAINT-GOBAIN make duly fixed with EPDM weathering seal resistant accessories like clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D 638-14,EN-477-95 and other applicable codes and standards.------ (V)forming to ASTM D 638-14,EN-477-95 and other applicable codes and standards
Ground Floor
First Floor
Second Floor
Supplying, fitting and fixing vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 15622-2006 (Group-B) of size 600mm x 600mm Color / Printed series (Homogenous) of approved make (JOHNSON /OASIS / SOMANY/ KAJARIA or equivalent ) in floors on 20mm thick bed of C.M. (1:4) (1cement:4course sand) and filling the joint with white cement mixed with pigment to match the shades of the tile including cost of all materials, taxes, labour, labour cess, T&P etc. required for the work complete in all respect as directed by the Engineer in charge.
Ground Floor
First Floor
Second Floor
Providing and fixing Homogeneous vitrified tiles in dados, skirting and rises of steps /walls on/over 12mm th cement plaster (1:3) (1cement:3sand) joined with neat cement slurry mixed with pigment to match the shade of tiles, rubbing, polishing including cost of tiles, conveyance, taxes & labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge
Ground Floor
First Floor
Second Floor
Supplying, fitting and fixing Chequre tile in floors of approved make conformaing to IS:13755 laid on 20 mm thick cement mortar (1:4) and filling joints with white cement of approved quality including cost of all materials, etc. required for the work all complete as per direction of E.I.C.
Ground Floor
First Floor
Second Floor
Finishing wall surface of wall with wall putty (Water based) of approved make and finished smooth and even surface to receive paiting including cost of scaffulding stsging changes with cost of all materials labour etc complete in all respect as per direction of Engineer In Charge.
Loosening & Levelling to a depth of 150mm, leveling and compacting original ground supporting embankment /sub-grade as per approved drawing and technical specifications as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge.
Dismantling & removing doors, windows, & ventilator including removal of frame, hinges, fastening & stacking the same for reuse and removing the debris with in 50. m Lead. including all costs of labour etc. complete as per direction of E.I.C.
Painting 2(Two) coats with any approved Plastic Emulsion paint to wall surface after cleaning the surface including cost of P.E Paint Cost,Coneyance, of all materials and labour with T&P required for the work etc. comple te in all floors complete in all respects as per the direction of engineer incharge.
Finishing wall surface with Weather Coat two coats with any approved shade over a coat of primer including cost, conveyance, , cess and royalties of all materials with labour and T&P required for the work etc., complete in all respect as per direction of Engineer In Charge.
12mm (1/2'') thick cement plaster in cement mortar (1:4) finished smooth to brick walls after raking out the joint including watering and curing for seven days with cost and conveyance of all materials and labour with T& P required for the work and royalities etc. complete in all respect as per direction of Engineer in charge.
Dismantling brick or stone masonry in lime or cement mortar under 3. m height including stacking the useful materials for reuse and removing the debris with in 50. m Lead. as per direction of the Engineer-in-charge
Dismantling GCI or AC sheet roofing after carefully removing the bolts & nuts including stacking of the materials for reuse and removing the debris with in 50. m Lead. including all costs of labour etc. complete as per direction of E.I.C.
Painting two coats of Synthetic enamel paint to Iron/Wood work over a coat of primer with cost, conveyance, taxes of all materials and labour with T&P required for the work etc.complete in all respect as per direction of Engineer in charge.
2.5 cm.(1'') thick grading concrete(1:2:2) over roof slab after chipping and cleaning the surfaces by wire brushing, laid to proper slope finished smooth including watering, curing, cost, conveyance of all materials such as 6mm size black hard granite crusher broken chips, sand, cement etc. and labour with T& P required for the work with all taxes and royalities etc. complete in all respect as per direction of Engineer in charge.
Supplying and fixing of 80 mm thick cement concrete interlocking paver block of M-40 grade of approved make , design, colour and size made by block making machine with proper compaction laid in required pattern etc
. complete in all respect conforming to IRC SP-63:2018 And as directed by theEngineer-In-Charge.
EI Works
INTERNAL WIRING.
Supplying all materials, labour, T&P and providing and fixing to wall or ceiling and floor IS marked galvanised mild steel tubes (medium grade) confirming to IS: 1239/1990, part-1 of the following nominal bore, tube fittings and clamps including making good the wall , ceiling and floor, testing, cost & conveyance of all materials to worksite, payment of all taxes etc all complete as per P.H specification and direction of the Engineer-in-charge.
25mm dia G.I. pipe
Recessed wiring to Light points/fan points/ Exhaust fan/ Call bell in 20mm dia non-metalic flexible Polythine conduit, confir-ming to IS-6946/1973 with 1.5mm² 1.1KV in-sulated, S.C.multistrand HR FR copper wire of ISI marked, confirming to IS-694/1990 and earth continuity in 1.5mm² S/C. Multistrand Cu. wire with Modular switch board of size 150 mmx 200mmx62mm made of 1.22mm thick G.I. Modular Box including provn. of earth screw, painted with one coat of DA grey enamel paint confirming to IS-5133 Part-I 1969 with 3mm thick Modular front cover fixed with steel screw including supply and fixing of 5A.,250V.,Modular switch of ISI marked, confirming to IS-3854/1997 and ceiling rose of ISI marked confirming to IS-371/1999 mounted on C.I. circular box having front Modular cover complete with all accessories and connections. as per direction of Engineer-in-charge. (Make of wire-Finolex/ Anchor/ Havels/V-guard/Polycab/KEI)
Group-B.
STILT FLOOR:
Recessed wiring to Light points/fan points/ Exhaust fan/ Call bell in 20mm dia non-metalic flexible Polythine conduit, confir-ming to IS-6946/1973 with 1.5mm² 1.1KV in-sulated, S.C.multistrand HR FR copper wire of ISI marked, confirming to IS-694/1990 and earth continuity in 1.5mm² S/C. Multistrand Cu. wire with Modular switch board of size 150 mmx 200mmx62mm made of 1.22mm thick G.I. Modular Box including provn. of earth screw, painted with one coat of DA grey enamel paint confirming to IS-5133 Part-I 1969 with 3mm thick Modular front cover fixed with steel screw including supply and fixing of 5A.,250V.,Modular switch of ISI marked, confirming to IS-3854/1997 and ceiling rose of ISI marked confirming to IS-371/1999 mounted on C.I. circular box having front Modular cover complete with all accessories and connections. as per direction of Engineer-in-charge. (Make of wire-Finolex/ Anchor/ Havels/V-guard/Polycab/KEI)
Group-B.
Group-A
Recessed wiring to Light points/fan points/ Exhaust fan/ Call bell in 20mm dia non-metalic flexible Polythine conduit, confir-ming to IS-6946/1973 with 1.5mm² 1.1KV in-sulated, S.C.multistrand HR FR copper wire of ISI marked, confirming to IS-694/1990 and earth continuity in 1.5mm² S/C. Multistrand Cu. wire with Modular switch board of size 150 mmx 200mmx62mm made of 1.22mm thick G.I. Modular Box including provn. of earth screw, painted with one coat of DA grey enamel paint confirming to IS-5133 Part-I 1969 with 3mm thick Modular front cover fixed with steel screw including supply and fixing of 5A.,250V.,Modular switch of ISI marked, confirming to IS-3854/1997 and ceiling rose of ISI marked confirming to IS-371/1999 mounted on C.I. circular box having front Modular cover complete with all accessories and connections. as per direction of Engineer-in-charge. (Make of wire-Finolex/ Anchor/ Havels/V-guard/Polycab/KEI)
Group-B.
FIRST FLOOR:
Recessed wiring to Light points/fan points/ Exhaust fan/ Call bell in 20mm dia non-metalic flexible Polythine conduit, confir-ming to IS-6946/1973 with 1.5mm² 1.1KV in-sulated, S.C.multistrand HR FR copper wire of ISI marked, confirming to IS-694/1990 and earth continuity in 1.5mm² S/C. Multistrand Cu. wire with Modular switch board of size 150 mmx 200mmx62mm made of 1.22mm thick G.I. Modular Box including provn. of earth screw, painted with one coat of DA grey enamel paint confirming to IS-5133 Part-I 1969 with 3mm thick Modular front cover fixed with steel screw including supply and fixing of 5A.,250V.,Modular switch of ISI marked, confirming to IS-3854/1997 and ceiling rose of ISI marked confirming to IS-371/1999 mounted on C.I. circular box having front Modular cover complete with all accessories and connections. as per direction of Engineer-in-charge. (Make of wire-Finolex/ Anchor/ Havels/V-guard/Polycab/KEI)
SECOND FLOOR:
STILT FLOOR:
Recessed wiring to Light points/fan points/ Exhaust fan/ Call bell in 20mm dia non-metalic flexible Polythine conduit, confir-ming to IS-6946/1973 with 1.5mm² 1.1KV in-sulated, S.C.multistrand HR FR copper wire of ISI marked, confirming to IS-694/1990 and earth continuity in 1.5mm² S/C. Multistrand Cu. wire with Modular switch board of size 150 mmx 200mmx62mm made of 1.22mm thick G.I. Modular Box including provn. of earth screw, painted with one coat of DA grey enamel paint confirming to IS-5133 Part-I 1969 with 3mm thick Modular front cover fixed with steel screw including supply and fixing of 5A.,250V.,Modular switch of ISI marked, confirming to IS-3854/1997 and ceiling rose of ISI marked confirming to IS-371/1999 mounted on C.I. circular box having front Modular cover complete with all accessories and connections. as per direction of Engineer-in-charge. (Make of wire-Finolex/ Anchor/ Havels/V-guard/Polycab/KEI)
TERRACE FLOOR:
Group-A
Recessed wiring to Light points/fan points/ Exhaust fan/ Call bell in 20mm dia non-metalic flexible Polythine conduit, confir-ming to IS-6946/1973 with 1.5mm² 1.1KV in-sulated, S.C.multistrand HR FR copper wire of ISI marked, confirming to IS-694/1990 and earth continuity in 1.5mm² S/C. Multistrand Cu. wire with Modular switch board of size 150 mmx 200mmx62mm made of 1.22mm thick G.I. Modular Box including provn. of earth screw, painted with one coat of DA grey enamel paint confirming to IS-5133 Part-I 1969 with 3mm thick Modular front cover fixed with steel screw including supply and fixing of 5A.,250V.,Modular switch of ISI marked, confirming to IS-3854/1997 and ceiling rose of ISI marked confirming to IS-371/1999 mounted on C.I. circular box having front Modular cover complete with all accessories and connections. as per direction of Engineer-in-charge. (Make of wire-Finolex/ Anchor/ Havels/V-guard/Polycab/KEI)
TERRACE FLOOR:
Recessed wiring to 5/6Amps.socket outlet with 2x1.5mm² F.R. PVC Insulated single core multi-strand copper conductor of ISI marked in with 20mm dia non-metalic PVC flexible conduit with 6A. 250V.Modular switch of ISI marked, phenolic laminated sheet suitable size ISI marked Modular box and earthing point with 1x1.5mm2 F.R.PVC insulated single core multistrand copper conductor for loop earthing etc. (Make of wire- Finolex/Anchor/Havels/V-guard/Polycab)
STILT FLOOR:
Group-A
b) On Existing board.
25mm dia G.I. pipe
Supplying and fixing of metal box of 180x100x60mm deep (nominal size) on surface or in recess with suitable size of phenolic Modular sheet cover in front including providing and fixing of 3Pin 20Amps. modular Socket outlet and 15/16A. Modular switch, connection, painting etc. as required. (for light plugs to be used in non-residential buildings)
Recessed wiring to submain in following size of FR PVC insulated Single core multistrand copper conductor of ISI marked confirming to IS-694/1900 in 20mm dia non-metalic heavy duty flexible conduit 1.5mm thick alongwith FR PVC insulated S.C.multistrand copper conductor as earth wire as required. (Make of wire-Finolex/ Anchor/Havels/Polycab)
b) 2x1.5mm2 + 1x1.5mm2 (Extra wire for Group-b & Group-c)
STILT FLOOR:
c) 2x2.5mm2 + 1x1.5mm2.
Supplying and fixing of metal box of 180x100x60mm deep (nominal size) on surface or in recess with suitable size of phenolic Modular sheet cover in front including providing and fixing of 3Pin 20Amps. modular Socket outlet and 15/16A. Modular switch, connection, painting etc. as required. (for light plugs to be used in non-residential buildings)
Recessed wiring to submain in following size of FR PVC insulated Single core multistrand copper conductor of ISI marked confirming to IS-694/1900 in 20mm dia non-metalic heavy duty flexible conduit 1.5mm thick alongwith FR PVC insulated S.C.multistrand copper conductor as earth wire as required. (Make of wire-Finolex/ Anchor/Havels/Polycab)
b) 2x1.5mm2 + 1x1.5mm2 (Extra wire for Group-b & Group-c)
d) 2x4mm2 + 1x1.5mm2.
Group-A
c) 2x2.5mm2 + 1x1.5mm2.
Supplying and fixing of metal box of 180x100x60mm deep (nominal size) on surface or in recess with suitable size of phenolic Modular sheet cover in front including providing and fixing of 3Pin 20Amps. modular Socket outlet and 15/16A. Modular switch, connection, painting etc. as required. (for light plugs to be used in non-residential buildings)
Recessed wiring to submain in following size of FR PVC insulated Single core multistrand copper conductor of ISI marked confirming to IS-694/1900 in 20mm dia non-metalic heavy duty flexible conduit 1.5mm thick alongwith FR PVC insulated S.C.multistrand copper conductor as earth wire as required. (Make of wire-Finolex/ Anchor/Havels/Polycab)
b) 2x1.5mm2 + 1x1.5mm2 (Extra wire for Group-b & Group-c)
d) 2x4mm2 + 1x1.5mm2.
a) 1x1.5mm2 for inverter wiring.
STILT FLOOR:
Group-A
e) 2x6mm2 + 1x2.5mm2.
STILT FLOOR:
Group-A
Supplying and fixing of Call Bell/Buzzer of ISI marked suitable for AC/DC of Single phase including connections etc. as required.
STILT FLOOR:
Group-A
Supplying and fixing of Batten holder/B.K. Angle holder of ISI marked including connections etc. as required.
STILT FLOOR:
Group-A
S/F. of 8Way double door D.Box with 1x40A. DP + 6x6A.-32A. S.P.MCB of Havels/L&T/C&S/Legrand make.
STILT FLOOR:
Group-A
S/F. of 48" 1200mm Usha-BLDC Technic/Havels-Efficiency Neo (2Star)/C.G.-Energy Greave with replacement warrantee will be 4 Years with regulator make:
STILT FLOOR:
Group-A
FIRST FLOOR:
S/F. of 20Wt. LED Tube light fittings of Havels-LUMILINE NEO/Crompton-20Wt. Laser Ray make:
STILT FLOOR:
Group-A
S/F. of 13.5/10W
25mm dia G.I. pipe
STILT FLOOR:
Group-A
t. LED B.H. fittings of Havels-Ellipse Neo Hexa/Bajaj-10Wt. WEE PLUS LED/C.G.-STUD - LBHP-10-CDL make.
S/F. of 63A. ICDP Main Switch of Havels/Anchor make on M.S. box with bakelite front cover including all accessories & connections.
STILT FLOOR:
FIRST FLOOR:
S/F. of Standard earthing confirming to IS-3043/1987 including S/F. of 38mm/40mm dia heavy duty G.I. pipe 3mtr long confirming to IS-1239/Part-I/1990. The pipe shall have 12mm dia perforated holes at 15cm interval centre to centre upto 2.5mtr height from the bottom to upper end threaded and fitted with 38mm/40 mm dia G.I. flange with Provision of holes for making connections of earth continuity wire, complete with masonary works, for earth pit chamber and S/F. of C.I. hinged top cover 30x30x1cm size.
STILT FLOOR:
Group-A
Supply & Laying of No.8 G.I. wire for extension of Earth continuity (To be run from Gr. Floor to 1st. Floor)
25mm dia G.I. pipe
S/F. of 45Wt. LED Street light fittings of Havels-ENDURAPEARLNEOSL/Bajaj-EDGE- BRTFG/ Crompton-FREEDOM NEO LSTS-45-CDL-M make.
25mm dia G.I. pipe
S/F. of 32A. D.P. MCB Protected plug & socket with plastic cover of Havels/L&T/ C&S make including all connections. (For A.C.Machines)
STILT FLOOR:
Group-A
S/F. of 18Wt. LED Recess/Surface mounting down lights of Havels-Trim Cosmo Surface Round/Bajaj-SLEEK SURFACE LED make.
FIRST FLOOR:
PH Works
Terrace Floor
Group-C.
First Floor
Second Floor
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge (Ori Plast/Finolex/Supreme Make)
Ground Floor
First Floor
Second Floor
25mm dia C-PVC pipe SDR-11
First Floor
Second Floor
32mm dia C-PVC pipe SDR-11
40 mm dia C-PVC pipe SDR-11
Supplying all materials, labour T&P and fitting and fixing brass/CP fittings of the following nominal bore with supply of all joiniting materials including cost & conveyance of all materials to worksite, payment of taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge.
15mm dia CP angle stop cock (Jaquar)CON-CHR-059KN
15mm dia CP two way bib cock (Jaquar)CON-041KN
Top Floor
20mm dia C-PVC pipe SDR-11
15mm dia CP Pillar cock (Con-CHR-011KN Jaquar make)
15mm dia CP Long body Bib cock (Con-CHR-107KN Jaquar make)
20mm dia CP consealed stop cock(Con-CHR-083KN Jaquar make)
25mm dia brass full way valve (Shakti make)
32mm dia brass full way valve (Shakti make)
25mm dia CP Health Faucet (Jaquar Make)ALD - CHR - 565
15mm CP Extension piece
125mm CP grating
15mm size C.P. flange
Supplying all materials , labour, T&P and fixing rotational moulded polyethylene cylindrical vertical water storage tanks conforming to IS:12701/1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts, fixing ball valve etc. including hoisting upto a height of 5 metres above ground level and placing the tank to the required position and providing 5.40 mtr. lengthx0.25 mtr width KB brickwork in cement mortar (1:6) of 0.46m height in staging and 0.13mtr thick circular protection wall of 0.46mtr height to support the tank,12mm thick cement plaster in cement mortar (1:6) over brick work, RCC slab of size 1.60mX1.60m and 0.10m thick ,RCC beam of 0.25mx0.30m and 3.40m average length in cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips and required steel reinforcement including centering and shuttering,watering,curing ,cost of all materials,conveyance of all materials to worksite , payment of royalty, all taxes etc.all complete as per approved drawing , P.H. specification and direction of Engineer-in-charge
40mm dia brass full way valve (Shakti make)
supplying all materials, labour, T&P and cutting holes through existing brick work including making good the damages in cement mortar (1:4) for taking G.I. Pipes and fittings/ P.V.C. pipes and fittings including watering, curing, cost & conveyance of all materials to worksite, payment of royality, taxes etc. all complete as per direction of Engineer-in-charge.
First Floor
Second Floor
Supplying all materials , labour, T&P and cutting holes in RCC floors and roofs upto 19cm thick for passing P.V.C pipes and G.I fittings etc. , and repairing the holes after insertion of pipe etc. with cement concrete (1:2:4) including finishing complete so as to make it leak-proof as per P.H. specification and direction of Engineer-in-charge
First Floor
Second Floor
Supplying all materials, labour, T&P and cutting grooves in pucca floors and walls for taking G.I./P.V.C. pipes and making good the damages including watering , curing , cost & conveyance of all materials to worksite, payment of royality, taxes etc all complete as per direction of the Engineer-in-charge.
First Floor
Second Floor
Supplying all materials, labour, T&P and fitting and fixing U-PVC SWR soil waste ventilating pipes and fittings of the following outside diameter conforming to ISI No 13592/1992 to walls with nails, bobbins and wooden plugs or laying in trenches including jointing with supply of approved rubber lubricant by non-heat application method/as per manufacturer's specification, testing, earthwork in excavation in all kinds of soil and refilling of trenches , cost & conveyance of all materials to worksite, payment of taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge.
110mm U-PVC SWR Pipe (Ori Plast/Finolex/Supreme Make Type-B)
15mm dia CP Bib cock (Con-CHR-047KN Jaquar make)
110mm U-PVC ‘P’ Trap(Ori Plast/Finolex/Supreme Make)
110mm U-PVC door bend(Ori Plast/Finolex/Supreme Make)
110mm U-PVC offset without ear(Ori Plast/Finolex/Supreme Make)
110mm U-PVC Plain bend(Ori Plast/Finolex/Supreme Make)
110mm U-PVC Cowl(Ori Plast/Finolex/Supreme Make)
110mm U-PVC S/Jn door(Ori Plast/Finolex/Supreme Make)
110mm U-PVC Plain tee(Ori Plast/Finolex/Supreme Make)
110mm U-PVC Door tee(Ori Plast/Finolex/Supreme Make)
110mm U-PVC Socket(Ori Plast/Finolex/Supreme Make)
75mm U-PVC plain bend(Ori Plast/Finolex/Supreme Make)
75mm U-PVC door bend(Ori Plast/Finolex/Supreme Make)
75x75x75mm U-PVC double equal door Tee(Ori Plast/Finolex/Supreme Make)
75mm U-PVC vent cowl(Ori Plast/Finolex/Supreme Make)
Supplying all materials, labour, T&P and fixing vitreous china water closet, squatting pan (Indian type W.C pan/Orissa pattern squatting pan) duly embedded in cement concrete (1:5:10) using 4cm size hard granite metal including fixing a pair of vitreous china 250mm x 130mm x30mm footrest, fixing 100mm dia HCI 'p' or 's' trap (with/without 50mm dia horn) for water colset squatting pan including jointing the trap with pan in cement mortar (1:1) cutting the floor and mending good the damages , cost & conveyance of all materials to worksite, payment of royality , taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge.
75 mm U-PVC SWR Pipe (Ori Plast/Finolex/Supreme Make Type-B)
2000 liters capacity PVC water storage tank roof of 2nd Floor
580mm size Orissa pan (Hindware/Parryware/Cera make)
Supplying all materials, labour, T&P and fixing the following vitreous china Wash Down Water Closet(European type W.C. pan)with integral 'p' or 's' trap to the floor with wooden plug and chromium plated pedestal screws including jointing the trap with soil pipe in cement mortar (1:1) fixing plastic seat and cover for wash down water closet with chromium plated brass hinges and rubber buffers including polishing , cost & conveyance of all materials to worksite, payment of royality, taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge
Supplying all materials, labour T&P and and fixing 12.50 liters/10 liters capacity low level flushing cistern with a pair of cast iron or M.S. brackets complete with fittings such as siphonic arrangements 15mm nominal size brass/pvc ball valve with polythene float CP brass handle,unions and couplings for connection with inlet, outlet and overflow pipes, 32mm dia CP long flush bend, 15mm dia pvc inlet connection pipe including cutting holes and making good the same and connecting the flush bend with cistern and closet and connceting the inlet pipe with suupply main , cost & conveyance of all materials to worksite, payment of taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge
Supplying all materials, labour T&P and fixing wash basins with hole for pillar taps with cast iron or M.S.brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc, fixing pedestal for wash basin recessed at the back for the reception of pipes and fittings, fixing PVC waste pipe of 32mm nominal diameter for wash basin including brass check nut complete, fixing pillar taps capstan head screw down high pressure lettered 'Hot' and 'Cold' with long screws, shanks and back nuts of 15mm dia nominal bore, fixing 15mm dia PVC inlet connection pipe and making connection with pillar cocks and supply mains for wash basin, fixing 32mm dia CP brass waste, cost & conveyance of all materials to worksite, payment of taxes etc. all complete as perP.H specification and direction of the Engineer-in-charge
European water closet with 'S' trap plain(Hindware/Parryware/Cera make)
550mmx400mm W.H.basin (Hindware/Parryware/Cera make)with 15mm dia C.P.pillar cock
Supplying all materials, labour, T&P and fixing standard sized CP towel rail complete with CP brass brackets fixed to wooden plugs with CP screws as per specification and direction of the Engineer in charge
550mmx400mm W.H.basin (Hindware/Parryware/Neycer make)with 15mm dia C.P.pillar cock with pedestal
20mmx600mm long CP towel rail
Supplying all materials, labour, T&P and fixing CP soap holder complete with CP brass brackets fixed to wooden plugs with CP screws as per specification and direction of the Engineer in charge
CP towel Ring
Supplying all materials, labour, T&P and fixing standard sized glass-shelf with CP brass brackets and guard rail complete fixed to wooden plugs with CP screws as per specification and direction of Engineer in charge.
CP soap holder
Supplying all materials, labour, T&P and fixing mirror of superior glass mounted on 6mm.thick A.C. sheet or ply wood sheet and fixed to wooden plugs with CP screws and washers complete as per specification and direction of Engineer in charge.
600 x 125mm plate glass shelf with CP guard rails
Supplying all materials labor T&P & Fitting & fixing CP shower with rim with supply of red lead and yarn nail complete as per direction of Engineer in charge.
15mm CP revolving shower (Jaquar)CON-CHR-209KN
600mmx450mm size Frammed mirror
Supplying all materials , labour, T&P and cutting holes through existing brick or laterite masonry wall for taking U-PVC pipes and fittings including making good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge
10 ltr. Capacity pvc L.L. cistern with 32mm. Dia CP long flush bend ( Slimline-white-Parryware make )
Supplying all materials, labour, T&P and providing 12mm thick cement plaster (1:4) on brickwork with cement punning for skirting including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge
Supplying all materials, labour, T&P for fitting & fixing plain edge kitchen/wall sink of all standard sizes with a pair of bracket, C.P. waste, trap & P.V.C. waste pipe & painting brackets including supply of cement concrete & mortar etc. all complete. 24” x 18” x 10” sink(Parryware make)
Second Floor
Supplying all materials labour & laying the waterproofing material of Dr. fixit torch shield P3160(3mm) with its primer 2 coats or equivalent water proofing materials after drying cleaning the concrete surface over the concrete floor/roof/balcony/ sunken and dado upto1'6" in wall including cleaning, applying and mending as per specification including cost, conveyance, taxes, royalities of all materials to worksite etc. all complete as per the direction of the Engineer- in- charge.
Supplying all materials, labour, T&P and providing cement concrete ( 1:2:4 ) with 12mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge
First Floor
First Floor =
Supplying all materials, labour, T&P and providing and fixing ceramic tiles in floors, treads or steps and landing on 25mm thick bed of cement mortar (1:1) ( 1 cement : 1 sand ) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including watering, curing,cost of all materials, conveyance of all materials to work site , payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge ( ceramic floor tiles of premium grade having thickness 7mm to 8mm conforming to IS 13755 of size 40cmx40cm special printed series to be pre-approved by the Engineer-in-charge )
Second Floor
First Floor
Supplying all materials , labour, T&P and cutting of RCC chajja for taking HCI or U-PVC pipe and fittings including making good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge
Supplying all materials,labour,T&P and providing 12mm thick cement plaster(1:4) on brick work including watering,curing,cost of all materials, conveyance of all materials to worksite,payment of royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer-in-charge.
First Floor
Second Floor
Supplying all materials, labour, T&P and providing and fixing porcelain glazed tiles in dado skirting on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including watering, curing,cost of all materials, conveyance of all materials to work site , payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge( ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm conforming to IS 13753 of size 25cmx33cm special plain / printed series to be pre-approved by the Engineer-in-charge )
Kajaria/Somany/Johnson tile 60cmx60cm
First Floor
Supplying all materials , labour, T&P and cutting of RCC chajja for taking HCI or U-PVC pipe and fittings including making good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge
Factory made single leaf Solid WPC (Wood polymer) composite door shutter of 25mm thickcompacted with wood grain finish structural foam panel of 29mm thickness and a density of 20kg/cu.mtr shall be used as core material for fitting the metal fittings such as tower bolts, aldrops, handles etc shall be provided. A structural adhesive compatible with (EPS) foam shall be used for bending the core material, The material and process for manufacturing the door shutters shall conform to RV-TIFAC composites Design Centre's standards and specifications and the door shutters Conforming to relevant I.S.specification. The finish of door shutter will be plain colour white/ Ivory/ Beige/ Light grey/ Mahogany/ Teak wood or any other colour using high quality pigments. Three heavy whight mild steel butt hinges type-I(ISI marked) size 100mm are to be fitted on one side of shutter.
Factory made Solid WPC door frame of size 95mmx55mm fabricated .The door frame consist of four segments which are provided with plug-in-socket arrangement in-situ in the mould. The segments are plugged in and are joined together by means of screw. The WPC frame shall be provided with The material and process for manufacturing the door frames shall conform to Relavent I.S.specification. The finish of door frame will be plain colour white/ Ivory/ Beige/ Light grey/ Golden brown/Mahogany/ Teak wood/sand stone/Champagne/Pastel blue or any other colour using high quality pigments complete in all respect as per specification and direction of the Engineer in charge
Supplying all materials, labour, T&P and laying in trenches (to level or slope) unplasticized P.V.C. pipe conforming to IS 4985/2000 of the following out side dia for class- 3 (0.60mpa ) including jointing with supply of approved solvent cement by non-heat application method/as per manufacture's specification, provoding and laying in trench cement concrete (1:4:8) with 40mm size hard granite metal in the type C-1 standard bedding surrounding or encasing including concrete for bedding and curing etc all complete as per P.H. specification and direction of the Engineer in charge
110mm dia u-pvc pipe alround concrete
Kajaria/Somany/Johnson tile 60cmx30cm
Supplying all materials ,labour ,T&P and constructing gully trap chamber of inside size 250mmx250mm with 8cm thick RCC precast cover slab in cement concrete (1:2:4) mix using 12mm size crusher broken HG chips, foundation concrete (1:4:8) using 40mm size crusher broken HG metal on bed and around trap, KB brick work in cement mortar (1:6) in foundation and plinth and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mmx100mm size HCI gully trap, 150mmX150mm size CI grating etc.all complete as per drawing, specification and direction of Engineer-in-charge
Supplying all materials ,labour ,T&P and constructing Inspection Chamber of inside size 760mmx760mmx460mm with cement concrete (1:3:6) using 40mm size crusher broken hard black granite metal on bed , KB brick work in cement mortar
(1:6) in foundation and plinth, moulding and shaping the channel inside and benching with cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips, 12mm thick cement plaster (1:3) with cement punning to inside, cement flush pointing (1:3) to outside, R.C.C cover slab (1:2:4) using 12mm size crusher broken hard black granite chips with R.C.C man hole cover, earth work in excavation in all kinds of soil and refilling the cavity around the chamber including watering,curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc.all complete as per approved drawing, P.H specification and direction of Engineer-in-charge
Inside size 76cmx76cmx46cm with 18” dia RCC MH cover
Second Floor =
Supplying all materials labour T&P and constructing 1.40m dia x 2.00 m deep soak way pit with dry brick having crossing strength not less than 75Kg/CM2 to 99Kg/CM2 in CM(1:6) for the remaining 0.4572mm height of wall at top CC(1:3)inside and outside inside fill with dry brick khoa size 38mm ,CM thick RCC perforated slab to a height of 1.9012m from bottom covered by means of 50mmthick RCC wall cover in pieces filled with iron plugs including earth work in excavation refilling of cavity around the pit and painting the iron works complete as per PHD design and specification including carriage of all materials to site.
Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge.
1 nos 50 Users RCC septic tank (Size-5.00m X 2.00m X 2.10m)
Supplying all materials labor T&P filling sand in foundation and plinth with well watered and rammed etc all complete as per direction of Engineer-in-charge..
Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge with 1st extra lift of 1.50 m over initial laft.
Supplying all materials, labor T&P providing CC (1:3:6) with 4 cm HG metal including watering curing lead of all materials to site etc. complete…
Supplying all materials, labour, T&P and providing steel reinforcement of Fe-415 /Fe-500 grade for RCC work including cutting,bending,binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge,cost of steel, conveyance of all materials to worksite, payment of royalty,all taxes etc all complete as per PWD specification and direction of the Engineer-in-charge.
Supplying all materials, labour, T&P and providing rigid & smooth centering and shuttering for RCC works including false work and dismantling them after casting including conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of the Engineer-in-charge
Supplying all materials, labour, T&P and providing cement concrete (1:1½:3) with 12mm size crusher broken hard black granite chips for RCC works including hoisting, laying, watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per PWD specification and direction of the Engineer in charge.
Supplying all materials, labour, T&P and providing cement concrete (1:1½:3) with 12mm size crusher broken hard black granite chips for RCC works inclu
Supplying all materials, labour, T&P and providing cement punning including watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per specification and direction of the Engineer-in-charge
RCC floor, roof slab chhaja up to 4.430 m height
160mm dia u-pvc pipe alround concrete
Supplying all materials labour T&P and constructing 1.40m dia x 2.00 m deep soak way pit with dry brick having crossing strength not less than 75Kg/CM2 to 99Kg/CM2 in CM(1:6) for the remaining 0.4572mm height of wall at top CC(1:3)inside and outside inside fill with dry brick khoa size 38mm ,CM thick RCC perforated slab to a height of 1.9012m from bottom covered by means of 50mmthick RCC wall cover in pieces filled with iron plugs including earth work in excavation refilling of cavity around the pit and painting the iron works complete as per PHD design and specification including carriage of all materials to site.
ding hoisting, laying, watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per PWD specification and direction of the Engineer in charge..
Supplying all materials, labour, T&P and providing 6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chipping and slurry tratment including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc all complete as per specification and direction of the Engineer in charge
14,000 ltr capacity R.C.C. Under ground sump of in side size (2.80m x 2.80m x 2.0m)
Supplying all materials, labour, T&P and providing cement concrete ( 1:2:4 ) with 12mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge.
Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge with 1st extra lift of 1.50 m over initial laft.
Supplying all materials, labour, T&P and providing rigid & smooth centering and shuttering for RCC works including false work and dismantling them after casting including conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of the Engineer-in-charge
Supplying all materials, labour, T&P and providing cement concrete (1:1½:3) with 12mm size crusher broken hard black granite chips for RCC works including hoisting, laying, watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per PWD specification and direction of the Engineer in charge.
Supplying all materials, labour, T&P and providing cement concrete (1:1½:3) with 12mm size crusher broken hard black granite chips for RCC works inclu
Supplying all materials, labour, T&P and providing cement punning including watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per specification and direction of the Engineer-in-charge
RCC floor, roof slab chhaja up to 4.430 m height
Supplying all materials labour T&P filling sand in foundation and plinth with well watered and rammed etc. all complate. As per direction of ELC.
Supplying all materials, labour, T&P and providing steel reinforcement of Fe-415 /Fe-500 grade for RCC work including cutting,bending,binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge,cost of steel, conveyance of all materials to worksite, payment of royalty,all taxes etc all complete as per PWD specification and direction of the Engineer-in-charge.
Construction of 1 nos production well including scientific source finding through consolidated and unconsolidated rock with down the ODEX drilling rig with PVC, GI, MS pipe and installation of submersible pump set with all accessories.
Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with combination drilling rig as required to suit the site condition as per the direction of Engineer-in-charge including supply of own rig with its accessories, tools and plant and consumables etc. for lowering of 200mm /150mm dia M.S. Pipe / PVC casing fitted with socket and with or without well screen as per the necessity for sub-medium hard and boulder formation (M.S./PVC casing pipe if required to prevent collapse of over burden is to be provided by contractor including lowering and withdrawing after completion of the tube well) 200mm dia x 400mm dia in over burden position inlcluding packing of gravel supplied by Contractor for 400mm bore only etc as per direction of Engineer incharge.
Drilling for 200mm dia bore
31mtr to 65 mtr
Drilling for 150mm dia bore
66mtr to above
Lowering the following size of G.I. / PVC / M.S. housing pipe with or without slotted pipe as per the necessity for ground level upto 45 mtr depth and fitted and fixed up perfectly vertical position including cutting and threading of pipes and slotted pipes and supplying and fixing all jointing materials, tools and plants etc all complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials.
Lowering 200mm dia M.S.ERW pipe casing pipe
00mtr to 85 mtr
cleaning and developing the tube well with supply of compressor worked till clear and adequate discharge in obtained from the tube well including supply and use of all necessary equipment and labour as per direction of Engineer-in-charge.
By DTH / Rotary
Supplying all labour, materials and T&P for providing sanitary sealing by cement concrete grouting of annular space around M.S. casing pipe uptp 5 mtr below groun dlevel to plug the bore hole excluding cost of cement etc all complete as per direction of EIC.
Supplying all materials, labour, T&P and providing fittings and fixing submersible pump with squarrel cage induction type submersible electric motor to run on 3 phase / single phase line voltage ranging from 320 volt to 450 volt conforming to IS:8034/89 with following specification with suitable control panel, jointing with GI / PVC / HDPE pipes, electrification, testing commissioning, trial running, conveyance of all materials to worksite, payment to taxes etc all complete as per the specification and direction of the Engineer in charge. (Texmo / Crompton Greaves / Kirloskar make)
1HP single phase 3 stage vertical / horizontal submersible pump set at head range 20 to 35 meters discharge 145 to 110 LPM with outlet dia of 25mm
2HP single phase 3 stage vertical / horizontal submersible pump set at head range 20 to 35 meters discharge 145 to 110 LPM with outlet dia of 25mm
DOL control panel
50mm size CI bracket
40mm steel short piece
well cap
4 sqmm flat cable
steel rope with cover
labour charges for lowering including transportation
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
UMERKOTEDTCN.pdf
Tender Documents • 1.27 MB
BOQ_566027.xls
BOQ • 1.01 MB
Download all tender documents and submit your bid