| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC H NO 159 VILL AND P O BHAUWALA NEAR S N PUBLIC SCHOOL RAJAWALA ROAD DEHRADUN UTTARAKHAND 248007 | DEHRADUN | UTTARAKHAND | 248007 | L1 | Accepted-AOC l1 | |
| 2 | L2₹7.3 L+₹2,666.86 (0.37%)Rejected-Finance GROUND FLOOR LANE NO 5 SUBHASH NAGAR DEHRADUN U K 248 B O 286 PRAGATI NAGAR MEERUT | 248 | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.4 L+₹3.1 L (43.2%)Rejected-Finance LANE NO 03 PRAGATI VIHAR RISHIKESH | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹27,000
Closing Date
25 Jun 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE(OANDM) CR, PTCUL DEHRADUN
SE(OANDM) CR, PTCUL, YAMUNA COLONY, DEHRADUN
Work of Height Raising of 220 KV IIP-Rishikesh Line on Lattice Structure Tower Near Resham Majri, Bhaniyawala under OandM Division Dehradun against E-Tender specification no.T- 07/SE (O and M)/ CR/D.Dun/2022-23
2022_PTCUX_44810_1
07/SE(OANDM)CR/PTCUL/DDUN22-23
Open Tender
Miscellaneous Works
Lump-sum
45 days
DEHRADUN
AS PER BID
3 documents required · 3 mandatory
₹590
Executive Engineer (O and M)Division, PTCUL D.DUN
₹27,000
3 Aug 2023
26 May 2022
27 Jun 2022
26 May 2022
25 Jun 2022
26 May 2022
180 days
Amount
SUPPLY Tower Accessories:
Pipe type earthing material(Set of 2)
Hardware suitable for ACSR Zebra
Single tension fitting
160 KN Standard Disc insulator
Hardware suitable for ACSR Zebra
Double Tension fitting
Anti Climbing device barbed wire type
Hardware suitable for 7/9 SWG
Tension fitting for 7/9 SWG
Mid Span compression joint for 7/9 SWG
ERECTION
Survay including preparation of final tower schedule of material, making of location (Route length) and super impose the GPS coordinates of diverted location on road plan to get the clearence from building before start work between tower No-121A to 123A.
Check survay and final peg marking (Route Length)
Cost of excavation of 220 kV Single circuit lattice structure type foundation pits including all earth work and leveling etc.
concreting in ratio 1:2:4 for all types foundation including cost of cement, shuttering, forming and curing but excluding cost of rainforcement bars with M-15 mix concrete.
Providing and Laying position cement concrete of specified grade including the cost of centering and shuttering.All work up to plinth level 1:3:6(1 Cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) M10
Setting of stub:
B type tower
Back earth filling after completing of foundation work with ramming,curing etc including all labur,material and T&P etc.
Erection of 220 kV Single circuit lattice structure & there extension wherever required including all work above groung level,Tack welding on bolts & nuts on first section of 220kV tower
220 KV (B+3) Single Circuit tower
Laying tensioning, stringing, clamping, jointing etc. complete with ACSR Zebra conductor including hoisting of insulators, fittings of all nessessary hardware & accessories etc
Laying tensioning, stringing, clamping, jointing etc. complete with ground wire including hoisting of all hardware & accessories etc for 1 no. 7/9 SWG GS earth wire
Tack welding on bolts & nuts on forst section of tower of 220kV Single S/c
Installation of earthing of towers for pipe type earthing (Set of 2)
Dewatering if any
Work of strengthening of 220kV towers by Providing stays to all three cross arm with the help of steel rope and Turn buckle at suitable dry place near tower, including excavation of earth, grouting of stay with all necessary work required in order to ensure safety of next suspension tower to prevent from any distortion and safe desagging of three line conductors and earthwire from the damaged Tower.
Fixing of Anti Climbing Device barbed wire type
Cost involved in Dismentling of existing line
Dismantling of old 220 KV towers is 122 A(3.810*1)
Destringing of 220 KV ACSR Dear conductor (for all 3 conductors )
De stringing of 7/9 SWG E/W Between desmantaled Line
Transportation of dismantled material of 220kV i.e. Tower structure, conductor, insulators,earth wire and other material back to near by PTCUL store and proper stacking on material as per direction PTCUL representative (GST will be paid extra as applicable) Note: for detailed BOQ, Check tender document.
m/s star power solutions
KOTHARI ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .