Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹7.6 L+₹1.5 L (25.5%)Rejected-AOC | L2 | Rejected-AOC Second lowest | |
| 3 | L3₹7.9 L+₹1.8 L (30.3%)Rejected-AOC | L3 | Rejected-AOC Third lowest | |
| 4 | L4₹8.6 L+₹2.5 L (41.0%)Rejected-AOC | L4 | Rejected-AOC Fourth lowest | |
| 5 | L5₹8.7 L+₹2.7 L (43.8%)Rejected-AOC | L5 | Rejected-AOC Fifth lowest |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
27 Feb 2021, 6:00 pmClosed
Assistant Executive Engineer Irrigation Sub Divis
Office of the Assistant Executive Engineer Irrigation SubDivision ThalasseryPO Thiruvangad, PIN 670103
Silt removal
2021_Irrig_416902_1
AEE/ISD/TLY/ET-04/ 2020-21/S
Open Tender
Civil Works - Others
Item Rate
120 days
Ulikkal
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,950
Yes
₹13,000
Yes
3 Jul 2021
19 Feb 2021
5 Mar 2021
19 Feb 2021
27 Feb 2021
19 Feb 2021
Amount
Scheme 1 Removal of silt from ch 00-20m
od42256/2020_2021/IA : Excavation of deposited silt,earth,pebbles and boulders having size 20 to 45dm3 size form river bed by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, removal of large size boulders lead up to 50 m and lift up to 1.5 m, depositing and levelling,neatly dressing the same to form the damaged flooded embankment etc.complete as per the direction of deptl.officers at site.Take specification code 2.6.1 and add extra for 0.55 no coolie and 0.50 no beldar for levelling and forming embankment by using boulders and deposited silt.
Scheme 2 Removal of silt from ch 20-40m
od36972/2020_2021/IA : Excavation of deposited silt,earth,pebbles and boulders having size 20 to 45dm3 size form river bed by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, removal of large sizebboulders lead up to 50 m and lift up to 1.5 m, depositing and levelling,neatly dressing the same to form the damaged flooded embankment etc.complete as per the direction of deptl.officers at site.Take specification code 2.6.1 and add extra for 0.55 no coolie and 0.50 no beldar for levelling and forming embankment by using boulders and deposited silt.
Scheme 3 Removal of silt from ch 40-80m
od36972/2020_2021/IA : Excavation of deposited silt,earth,pebbles and boulders having size 20 to 45dm3 size form river bed by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, removal of large sizebboulders lead up to 50 m and lift up to 1.5 m, depositing and levelling,neatly dressing the same to form the damaged flooded embankment etc.complete as per the direction of deptl.officers at site.Take specification code 2.6.1 and add extra for 0.55 no coolie and 0.50 no beldar for levelling and forming embankment by using boulders and deposited silt.
Scheme 4 Removal of silt from ch 80-100m
od36972/2020_2021/IA : Excavation of deposited silt,earth,pebbles and boulders having size 20 to 45dm3 size form river bed by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, removal of large sizebboulders lead up to 50 m and lift up to 1.5 m, depositing and levelling,neatly dressing the same to form the damaged flooded embankment etc.complete as per the direction of deptl.officers at site.Take specification code 2.6.1 and add extra for 0.55 no coolie and 0.50 no beldar for levelling and forming embankment by using boulders and deposited silt.
Scheme 5 Removal of silt from ch 100-120m
od36972/2020_2021/IA : Excavation of deposited silt,earth,pebbles and boulders having size 20 to 45dm3 size form river bed by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, removal of large sizebboulders lead up to 50 m and lift up to 1.5 m, depositing and levelling,neatly dressing the same to form the damaged flooded embankment etc.complete as per the direction of deptl.officers at site.Take specification code 2.6.1 and add extra for 0.55 no coolie and 0.50 no beldar for levelling and forming embankment by using boulders and deposited silt.
Scheme 6 Removal of silt from ch 120-140m
od36972/2020_2021/IA : Excavation of deposited silt,earth,pebbles and boulders having size 20 to 45dm3 size form river bed by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, removal of large sizebboulders lead up to 50 m and lift up to 1.5 m, depositing and levelling,neatly dressing the same to form the damaged flooded embankment etc.complete as per the direction of deptl.officers at site.Take specification code 2.6.1 and add extra for 0.55 no coolie and 0.50 no beldar for levelling and forming embankment by using boulders and deposited silt.
K.T. DEVASIA
Rijo George
UDAYAPURAM LABOUR CONTRACT SOCIETY
KS JOSEPH
Bidder Name
KS JOSEPH
UDAYAPURAM LABOUR CONTRACT SOCIETY
K.T. DEVASIA
ANEESH.C.S
Rijo George
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_592085.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .