Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Fee/PreQual/Technical/Finance VISHNU PRABHA HOUSE KAVIL P O NADUVANNUR VIA KOYILANDY KOZHIKODE DISTRICT KERALA 673614 | KOZHIKODE | KERALA | 673614 | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹9.3 L+₹8,471.60 (0.92%)Admitted-Fee/PreQual/Technical/Finance 1003 SUB TREASURY DEVIKULAM | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SREENATH. M.C. L1 | RAJAN L2 |
|---|---|---|---|---|---|
| 1.00side wall | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 68.2 | cum | 360.14 ₹24,561.55 Lowest | 363.46 ₹24,787.97 |
| 1.00 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 14.7 | cum | 988.02 ₹14,523.89 Lowest | 997.09 ₹14,657.22 |
| 1.00 | OD545333/2025-2026:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels ,cost and conveyance of all materials ,labour charged etc complete ( Approved OD from Division ) | 156 | cum | 3,998.2 ₹6,23,719.2 Lowest | 4,034.87 ₹6,29,439.72 |
| 1.00 | OD545387/2025-2026: DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 53.9 | cum | 2,970.7 ₹1,60,120.73 Lowest | 2,997.96 ₹1,61,590.04 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5 | cum | 8,579.3 ₹42,896.5 Lowest | 8,658 ₹43,290 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 20 | sqm | 386.64 ₹7,732.8 Lowest | 390.17 ₹7,803.4 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 144 | hour | 345.94 ₹49,815.36 Lowest | 349.12 ₹50,273.28 |
Tender Value
₹8.5 L
EMD Value
₹21,178
Closing Date
14 May 2026, 6:00 pmClosed
Assistant engineer
o/o the Assistant Engineer LID EW Thikkodi GP
please refer boq
2026_LSGD_849081_1
59/AE/TGP/2025-26
Open Tender
Civil Works - Others
Item Rate
690 days
thikkodi
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,178
Yes
21 May 2026
7 May 2026
16 May 2026
7 May 2026
14 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1side wall | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 1 | cum | - | - |
| 1.003 | OD545333/2025-2026:Dry rubble masonry without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels ,cost and conveyance of all materials ,labour charged etc complete ( Approved OD from Division ) | - | cum | - | - |
| 1.004 | OD545387/2025-2026: DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 1 | cum | - | - |
| 1.005 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
| 1.007 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
59sbd.pdf
Tender Documents • 1.84 MB
59pre.pdf
Tender Documents • 0.30 MB
epayment.pdf
Tender Documents • 0.28 MB
59affi.pdf
Tender Documents • 0.28 MB
integrity.pdf
Tender Documents • 0.23 MB
nitthoolika.pdf
Tender Documents • 0.36 MB
BOQ_1434817.xls
BOQ • 0.30 MB
59fot.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .