| 1 | L1₹8.1 LAccepted-AOC | ₹8.1 L | L1 | Accepted-AOC L1 Agency |
| 2 | L2₹8.4 L+₹27,587.72 (3.39%)Rejected-Finance | ₹8.4 L+₹27,587.72 (3.39%) | L2 | Rejected-Finance Higher |
| 3 | L3₹8.6 L+₹48,278.51 (5.93%)Rejected-Finance | ₹8.6 L+₹48,278.51 (5.93%) | L3 | Rejected-Finance Higher |
Tender Value
₹6.9 L
Closing Date
25 May 2026, 2:00 pmClosed
Registrar NIT Silchar
Registrar NIT Silchar
Renovation of roof at Type-III quarter Block no.2 at NIT Silchar.
2026_NS_909380_1
NIT/Estate/Limited/2026-27/03 Sl. No. 01
Limited
Civil Works
Percentage
NIT Silchar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
21 Aug 2026
20 May 2026
26 May 2026
20 May 2026
25 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per directions of Engineer-In-Charge. With cement mortar 1:4 (1cement: 4 coarse sand). | 170 | Sqm | 582.92 | ₹99,096.4 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 21 | Cum | 2,531.62 | ₹53,164.02 |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 1 | Cum | 2,142.61 | ₹2,142.61 |
| 4 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:
(a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm.
(b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm.
(c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around.
(d) fourth and final layer of brick tiling with cement mortar (which will be paid
for separately. For the purpose of measurement the entire treated surface will be measured | 355 | Sqm | 800.38 | ₹2,84,134.9 |
| 5 | 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1 : 4 ( 1 cement : 4 fine sand ) | 25 | Sqm | 415.43 | ₹10,385.75 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 0.5 | Cum | 10,771.85 | ₹5,385.93 |
| 7 | Grading roof for water proofing treatment with Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) | 21 | Cum | 8,363.99 | ₹1,75,643.79 |
| 8 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal outer dia Pipes | 20 | Rmt | 559.1 | ₹11,182 |
| 9 | 25 mm nominal dia Pipes | 10 | Rmt | 652.34 | ₹6,523.4 |
| 10 | 40 mm nominal dia Pipes | 40 | Rmt | 768.87 | ₹30,754.8 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.28 MB
BOQ_955778.xls
BOQ • 0.26 MB
TermsconditionsUpdtd.pdf
Additional Documents • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .