| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.1 LAccepted-AOC | L1 | Accepted-AOC AOC IS AWARDED DUE TO L1 | |
| 2 | L2₹27.3 L+₹18,781 (0.69%)Rejected-Finance | L2 | Rejected-Finance BID IS REJECTED DUE TO QUALIFIED IN L2 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
20 Feb 2024, 2:00 pmClosed
EXECUTIVE ENGINEER, MGCCD 14, GARHMUKTESHWAR
EXECUTIVE ENGINEER, MGCCD 14, GARHMUKTESHWAR
Construction of Head Regulator of Muridpur Minor at Km. 4.800 of Hasanpur Dy.
2024_UPIDC_895789_1
03/EE/2023-24
Open Tender
Civil Works - Canal
Item Rate
120 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹1.6 L
26 Feb 2025
14 Feb 2024
20 Feb 2024
14 Feb 2024
20 Feb 2024
14 Feb 2024
14 Feb 2024 - 20 Feb 2024
Amount
Earthwork in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits and earth work in embankment to be in 20 cm layers including ramming and dressing the surface to the required levels and slopes and also including all lift and 30 metre lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank within 30 mtr distances as directed by engineer-in-charge
Earthwork in Excavation of foundation in dry soil (Loam, Clay or Sand) including all lift and 30 metre lead with back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of all labour, T & P etc but excluding cost of dewatering . The earth from cutting or excavation to be used in making embankment or to be deposited as spoil bank within 30 metre distance as directed by Engineer-in- charge.
Providing & Laying of C.C M15 (A-20) including all cost of coarse sand , coarse aggregate of 10 mm to 20 mm size, labour and T&P etc. required for proper complition of work.
Providing & Laying of Porous C.C. 1:0:4 Cement Coarse sand with A-40 Aggregate i/c all cost labour, Material T & P etc. for completion of work.
Providing & Laying of R:C:C M-20 (1:1.5:3) A-20 with cement coarse sand and crushed stone grit i/c all cost of labor, Material T & P etc. for Completion of work.
Providing & Laying of C:C M-20 (1:1.5:3) A-20 with cement coarse sand and crushed stone grit i/c all cost of labor, Material T & P etc. for Completion of work.
Supplying and Laying of R:C:C 1:1:2 M-25 A-20 with cement coarse sand and crushed stone grit i/c all cost of labour, Material T & P etc. for Completion of work.
Supplying and Laying of C:C 1:1:2 M-25 A-20 with cement coarse sand and crushed stone grit i/c all cost of labour, Material T & P etc. for Completion of work.
Providing Centering & Shuttering for C:C Works i/c all cost of material, labour T& P etc. for proper comp. of work.
Providing centering & Shuttering for R:C:C Works i/c all cost of material, labour T & P etc. for proper comp. of work.
Supplying and Laying of graded Filter filling with 4.2 to 10 mm size stone grit i/c all cost of material, labour T & P etc for proper comp. of work.
Providing & Laying of of graded Filter filling with 2 to 4.2 size pea gravel i/c all cost of material, labor T & P etc. for proper comp. of work.
P / Fixing 20mm expenssion joint with angle iron on both side and 6 mm thick steal plate over angle iron welded contineously including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing and fixing of nomitax Board for expansion / construction joint i/c all cost of material labour T & P etc. for proper comp. of work.
Providing and fixing of P.V.C. water stop for expansion/construction joint i/c all cost of material labour T & P etc. for proper comp. of work.
Supplying & Fixing Steel reinforcement with bending, binding, cutting & placing in proper position i/c all cost of material, labour T & P etc. for proper comp. of work. (Up to 10 mm dia)
Supplying & Fixing Steel reinforcement with bending, binding, cutting & placing in proper position i/c all cost of material, labour T & P etc. for proper comp. of work. (Above 10 mm dia)
Providing & laying of local sand in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing 100 mm dia PVC pipe for utility service including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Fixing 75 mm dia PVC drainage spout pipe including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.
Providing & Laying Boulder 20 to 40 Kg. in Bed of Canal i/c all cost of material, labour T & P etc. for proper comp. of work.
Providing & Fixing Angle Iron 50 x 50 x 8 mm at Head Regulator edges in position including cost of all mterial, labour and T&P for proper complition of work.
Supplying & Fixing Marble Name & year plate 450 X 300 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work.
Supplying & Fixing B.M. plate 150 X 150 X 25 mm. Size i/c all cost of material, labour T&P etc. for proper comp. of work.
Supplying & Fixing Wheel guard stone 150x150x900 mm Size i/c all cost of material, labour T&P etc. for proper comp. of work.
Earth work in Filling within 1 km. carriage i/c all cost of material, labour T&P etc. for proper comp. of work.
Laying brick on edge soiling laid dry filling joints i/c all cost of material, labour T&P etc. for proper comp. of work.
M/S RAJ KAMAL CONSTRUCTION CO
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .