| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | ₹6.5 L | L1 | Accepted-AOC Lowest bidder |
| 2 | L2₹8.0 L+₹1.5 L (22.7%)Rejected-AOC | ₹8.0 L+₹1.5 L (22.7%) | L2 | Rejected-AOC Second lowest |
| 3 | L3₹8.4 L+₹1.9 L (28.8%)Rejected-AOC MANALUVILA THUNDIL KAITHACODE KOLLAM | KOLLAM | KOLLAM | KERALA | ₹8.4 L+₹1.9 L (28.8%) | L3 | Rejected-AOC Third lowest |
Tender Value
₹8.9 L
EMD Value
₹22,200
Closing Date
22 Jan 2026, 4:00 pmClosed
Assistant Executive Engineer
Line Maintenance Subdivsion, Edamon
Capital Work for Replacing existing old and damaged ceramic suspension discs with composite insulators at Various locations of 220kV Edamon-Pothencode I and II Feeders under LMS, Edamon
2026_KSEB_826303_1
TENDER/25-26/3211/3dt.07-01-26
Open Tender
Electrical and Maintenance Works
Percentage
60 days
Edamon to Pothencode
See tender documents
5 documents required · 5 mandatory
₹2,124
₹22,200
18 Feb 2026
9 Jan 2026
29 Jan 2026
9 Jan 2026
22 Jan 2026
9 Jan 2026
Monkey patrolling on towers of 66/110/220kV lines for assessing the condition of the insulator strings.
Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by head load and initial lift of 1.5m at each end etc. - By lorry over 9km and upto 10km for Tower extensions and other structures and all other materials including earthing materials
Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection - By lorry for every additional km or part thereof over 10km for Tower extensions and other structures and all other materials including earthing materials
Dismantling of one set suspension clamp with line conductor from 220kV suspension string after lifting the conductor using special appliances, placing the conductor with suspension clamp on tower cross arm , lowering the string using rope and pulley, dismantling the string and re-assembling the same with new disc insulator after changing all rusted/flashed/damaged disc insulators then lifting the same and placing it to the existing U bolt at cross arm using rope and pulley then lifting the line conductor with suspension clamp and connecting the same to the bottom of string insulator as per the direction of department staff.
As per Circular no.FA/Tax Cell/GST- Tendering/2020-21 Dated24.02.2021, the following conditions shall be noted. 1. The contractor should quote only the amount excluding GST and TCS. 2.The contractor should not quote the GSTrate, GST amount and TCS. 3.It is mandatory to specify the registration status and quote the registration number along with the copy of GST registration and the same shall be uploaded.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1386006.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.25 MB
BOQ_1386006.xls
BOQ • 0.25 MB
Tenderspecification.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .