Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.5 CrAdmitted-Finance | ₹1.5 Cr | L1 | Admitted-Finance |
| 3 | L2₹1.6 Cr+₹8.2 L (5.31%)Admitted-Finance | ₹1.6 Cr+₹8.2 L (5.31%) | L2 | Admitted-Finance |
| 4 | L3₹1.6 Cr+₹9.1 L (5.87%)Admitted-Finance | ₹1.6 Cr+₹9.1 L (5.87%) | L3 | Admitted-Finance |
| 5 | L4₹1.6 Cr+₹9.1 L (5.88%)Admitted-Finance | ₹1.6 Cr+₹9.1 L (5.88%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Mukesh Kumar Singh L7 | Jayakrushna Sahu L5 | MANORANJAN MUDULI L1 | Kasinath Prusty L8 | DILIP KUMAR SWAIN L3 | Akash Dalai L4 | KAPIL CONSTRUCTION CO. L2 | DAYANIDHI SAHU L1 | BALARAM DALAI L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers,75 KL ltr Capacity O.H.R, compound wall, house hold connetion& internal electifiction,pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Gangapur under Sanakhemundi Block. | ||||||||||||
| 1.01 | Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C) . Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 46,34,200 ₹46,34,200 | 43,90,775 ₹43,90,775 | 41,46,870.16 ₹41,46,870.16 Lowest | 51,22,000 ₹51,22,000 | 43,90,335 ₹43,90,335 | 43,90,774 ₹43,90,774 | 42,00,000 ₹42,00,000 | 41,46,870.17 ₹41,46,870.17 | 43,90,775.01 ₹43,90,775.01 |
| 1.02 | Construction of 75,000 LTR OHR WITH 12M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 75,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 100mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 20,40,000 ₹20,40,000 | 19,32,802.26 ₹19,32,802.26 | 18,25,436.73 ₹18,25,436.73 Lowest | 22,54,686 ₹22,54,686 | 19,32,609 ₹19,32,609 | 19,32,802 ₹19,32,802 | 19,00,000 ₹19,00,000 | 18,25,436.73 ₹18,25,436.73 Lowest | 19,32,802.73 ₹19,32,802.73 |
| 2.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers ,house hold connetion& internal electifiction,pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Sumantapur under Sanakhemundi Block. | ||||||||||||
| 2.01 | Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C) . Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 31,71,800 ₹31,71,800 | 30,05,179.3 ₹30,05,179.3 | 28,38,243.48 ₹28,38,243.48 Lowest | 35,05,652 ₹35,05,652 | 30,04,878 ₹30,04,878 | 30,05,179 ₹30,05,179 | 30,00,000 ₹30,00,000 | 28,38,243.48 ₹28,38,243.48 Lowest | 30,05,179.34 ₹30,05,179.34 |
| 3.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers ,75 KL ltr Capacity O.H.R, house hold connetion& internal electifiction,pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Kaudia under Sanakhemundi Block. | ||||||||||||
| 3.01 | Supplying all materials labour T&P for .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well ,Internal electrificatio etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A toC). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 45,87,400 ₹45,87,400 | 43,46,431.6 ₹43,46,431.6 | 41,04,990.05 ₹41,04,990.05 Lowest | 50,70,272 ₹50,70,272 | 43,45,996 ₹43,45,996 | 43,46,430 ₹43,46,430 | 44,00,000 ₹44,00,000 | 41,04,990.06 ₹41,04,990.06 | 43,46,431.65 ₹43,46,431.65 |
| 3.02 | Construction of 75,000 LTR OHR WITH 12M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 75,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 100mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 20,40,000 ₹20,40,000 | 19,32,802.7 ₹19,32,802.7 | 18,25,436.75 ₹18,25,436.75 | 22,54,686 ₹22,54,686 | 19,32,609 ₹19,32,609 | 19,32,802 ₹19,32,802 | 20,00,000 ₹20,00,000 | 18,25,436.73 ₹18,25,436.73 Lowest | 19,32,802.73 ₹19,32,802.73 |
| 4.00 | Documentation charges | 1 | Nos | 990 ₹990 | 900 ₹900 | 850.1 ₹850.1 Lowest | 1,050 ₹1,050 | 900 ₹900 | 900 ₹900 | 1,000 ₹1,000 | 850.1 ₹850.1 Lowest | 900.1 ₹900.1 |
| 5.00 | The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure-G& H) | 1 | Nos | 8,23,800 ₹8,23,800 | 7,80,444.5 ₹7,80,444.5 | 7,37,091.36 ₹7,37,091.36 Lowest | 9,10,417 ₹9,10,417 | 7,80,366 ₹7,80,366 | 7,80,444 ₹7,80,444 | 8,00,000 ₹8,00,000 | 7,37,091.36 ₹7,37,091.36 Lowest | 7,80,444.57 ₹7,80,444.57 |
Tender Value
₹1.8 Cr
Closing Date
25 Oct 2021, 5:00 pmClosed
Superintending Engineer, RWSS Division, Berhampur
Near Jarada Bunglow, Berhampur
PWS to (1) Gangapur (2) Sumantapur and (3) Kaudia under Sanakhemundi Block
2021_RWSS_71575_3
EERWSSBAM- 20 / 2021-22
National Competitive Bid
Civil Works - Water Works
Item Rate
330 days
PWS to (1) Gangapur (2) Sumantapur and (3) Kaudi
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
20 Nov 2021
7 Oct 2021
26 Oct 2021
7 Oct 2021
25 Oct 2021
7 Oct 2021
7 Oct 2021 - 21 Oct 2021
Amount
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers,75 KL ltr Capacity O.H.R, compound wall, house hold connetion& internal electifiction,pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Gangapur under Sanakhemundi Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C) . Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 75,000 LTR OHR WITH 12M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 75,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 100mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers ,house hold connetion& internal electifiction,pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Sumantapur under Sanakhemundi Block.
Supplying all materials labour T&P for construction of Compound wall .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C) . Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers ,75 KL ltr Capacity O.H.R, house hold connetion& internal electifiction,pumping unit instalation etc With 5 years operation & maintenance in connection with etc pws to Kaudia under Sanakhemundi Block.
Supplying all materials labour T&P for .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,stand post, bore well platform,recharge pit,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well ,Internal electrificatio etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A toC). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 75,000 LTR OHR WITH 12M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 75,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 100mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
Documentation charges
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date concurrent with defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adepuate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical spacification mentioned (As per Annexure-G& H)
DAYANIDHI SAHU
KAPIL CONSTRUCTION CO.
DILIP KUMAR SWAIN
Akash Dalai
Jayakrushna Sahu
BALARAM DALAI
Mukesh Kumar Singh
Kasinath Prusty
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BOQ_368761.xls
BOQ • 0.28 MB
A03DTCNGangapur.pdf
Tender Documents • 1.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .