Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | ₹1.8 L | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹2.0 L+₹23,811 (13.5%)Rejected-AOC | ₹2.0 L+₹23,811 (13.5%) | L2 | Rejected-AOC 2nd lowest |
| 3 | L3₹2.1 L+₹30,028.08 (17.1%)Rejected-AOC | ₹2.1 L+₹30,028.08 (17.1%) | L3 | Rejected-AOC 3rd lowest |
| 4 | L4₹2.1 L+₹37,556.24 (21.3%)Rejected-AOC 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | ₹2.1 L+₹37,556.24 (21.3%) | L4 | Rejected-AOC 4th lowest |
| 5 | L5₹2.6 L+₹84,078.61 (47.8%)Rejected-AOC | ₹2.6 L+₹84,078.61 (47.8%) | L5 | Rejected-AOC 5th lowest |
Tender Value
₹2.1 L
EMD Value
₹5,287
Closing Date
23 Mar 2026, 4:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, PWD Buildings sub division Shoranur
DEPOSIT SNGS COLLEGE PATTAMBI DEPOSIT WORK FOR RENOVATION OF SPORTS PAVILION ROOM General Civil
2026_PWD_846402_1
D1/eTN/18/2025-26
Open Tender
Civil Works - Buildings
Percentage
240 days
Shoranur
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
Yes
₹5,287
Yes
18 Jul 2026
11 Mar 2026
25 Mar 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 1.001 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | - | each | 379.56 | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 1 | cum | 2,129.84 | ₹2,127.71 |
| 1.003 | 14.82:Dismantling W.C. Pan of all sizes including disposal of dismantled materials i/c malba all complete as per directions of Engineer-in-Charge | - | no | 138.85 | - |
| 1.004 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,569.14 | - |
| 1.005 | 9.48.1:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to steel windows by welding | - | kg | 226.96 | - |
| 1.006 | OD132575/2025-2026:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications excluding appropriate priming coat, preparation of surface, etc. complete. On steel work | 1 | sqm | 175.78 | ₹175.6 |
| 1.007 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | - | sqm | 131.19 | - |
| 1.008 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter | - | metre | 8.35 | - |
| 1.009 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | - | sqm | 489.63 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429962.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_3.pdf
PDF • 0.13 MB
Tendernotice_4.pdf
PDF • 0.24 MB
Tendernotice_5.pdf
PDF • 0.09 MB
Tendernotice_6.pdf
PDF • 0.04 MB
Tendernotice_7.pdf
PDF • 0.19 MB
Tendernotice_8.pdf
PDF • 0.18 MB
Tendernotice_9.pdf
PDF • 0.19 MB
BOQ_1429962.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .