Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | ₹5.9 L | L1 | Accepted-AOC l1 |
| 2 | L2₹6.1 L+₹21,778.24 (3.72%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹6.1 L+₹21,778.24 (3.72%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical AT ARGADA DISTT RAMGARH JHARKHAND | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | M/S ADITYA ENTERPRISES L1 | coalfields engineering works L2 |
|---|---|---|---|---|---|
| 1.00 | A. 180KW,3.3KV , Si. No. F330435/1 Cost of DGC copper strip | 60 | Coil | 2,635.9 ₹1,58,154 Lowest | 2,733.5 ₹1,64,010 |
| 2.00 | Cost of moulding of one coil with craption,nomax and mica | 60 | Coil | 1,945 ₹1,16,700 Lowest | 2,015 ₹1,20,900 |
| 3.00 | Insulation cost | 1 | No. | 23,723.1 ₹23,723.1 Lowest | 24,601.5 ₹24,601.5 |
| 4.00 | Labour cost | 1 | No. | 23,723.1 ₹23,723.1 Lowest | 24,601.5 ₹24,601.5 |
| 5.00 | Less scrap value | 1 | No. | 94,892.4 ₹-94,892.4 Lowest | 98,406 ₹-98,406 |
| 6.00 | Dala housng welding and machining | 2 | No. | 16,850 ₹33,700 Lowest | 17,640 ₹35,280 |
| 7.00 | B. 180KW,3.3KV , Si. No. F330435/3 Cost of DGC copper strip | 60 | Coil | 2,635.9 ₹1,58,154 Lowest | 2,733.5 ₹1,64,010 |
| 8.00 | Cost of moulding of one coil with craption,nomax and mica | 60 | Coil | 1,945 ₹1,16,700 Lowest | 2,015 ₹1,20,900 |
| 9.00 | Insulation cost | 1 | No. | 23,723.1 ₹23,723.1 Lowest | 24,601.5 ₹24,601.5 |
| 10.00 | Labour cost | 1 | No. | 23,723.1 ₹23,723.1 Lowest | 24,601.5 ₹24,601.5 |
Tender Value
₹6.4 L
EMD Value
₹8,000
Closing Date
13 Sept 2025, 3:00 pmClosed
Project Engineer (EnM),Urimari OCP
Office of The Project Engineer (EnM),Urimari OCP, Barka Sayal Area, Pin 825311
Repairing, rewinding and maintenance of 2 no 180 KW 3.3KV, Make- Marathon, Si. No. F330435/1 and F330435/3 3phase induction motor installed at Potanga Quarry under Urimari OCP.
2025_CCL_343051_1
PE(EnM)/Urimari/e Tender/25-26/24
Open Tender
Electrical and Maintenance Works
Item Wise
30 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹8,000
4 Sept 2026
2 Sept 2025
15 Sept 2025
3 Sept 2025
13 Sept 2025
3 Sept 2025
3 Sept 2025 - 10 Sept 2025
Amount
A. 180KW,3.3KV , Si. No. F330435/1 Cost of DGC copper strip
Cost of moulding of one coil with craption,nomax and mica
Insulation cost
Labour cost
Less scrap value
Dala housng welding and machining
B. 180KW,3.3KV , Si. No. F330435/3 Cost of DGC copper strip
Cost of moulding of one coil with craption,nomax and mica
Insulation cost
Labour cost
Less scrap value
Rotor shaft bearing housing welding and machining to bearing size
Profit
Total impact of GST for the purpose of CTC
coalfields engineering works (BID ID -1183377)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .