| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAccepted-AOC | L1 | Accepted-AOC Work Completed | |
| 2 | L2₹21.8 L+₹1,348.23 (0.06%)Rejected-Finance | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹21.9 L+₹9,851.78 (0.45%)Rejected-Finance V P O KARSOG TEHSIL KARSOG DISTT MANDI HP | KARSOG | MANDI | HIMACHAL PRADESH | L3 | Rejected-Finance Not lowest | |
| 4 | L4₹22.3 L+₹55,909.83 (2.57%)Rejected-Finance | L4 | Rejected-Finance Not lowest | |
| 5 | L5₹22.5 L+₹75,138.83 (3.45%)Rejected-Finance | L5 | Rejected-Finance Not lowest |
Tender Value
₹25.6 L
EMD Value
₹45,950
Closing Date
23 Dec 2021, 5:00 pmClosed
EE Shillai
Executive Engineer HP PWD Division Shillai
Construction of link road from Ronhat to village Rast km. 0/0 to 6/0 (SH-construction of RCC Box culvert of size 3.0x4.0 meter at RD 4/022)
2021_PWD_54714_5
PW-TA-12072-12172dt3-12-21
Open Tender
Civil Works - Roads
Item Wise
90 days
Shillai
please refer to tender document
12 documents required · 12 mandatory
₹1,500
₹45,950
30 Dec 2023
16 Dec 2021
24 Dec 2021
16 Dec 2021
23 Dec 2021
16 Dec 2021
Amount
Earth work in excavation for structures in all depths as per drawing and technical specification of Ministry of Rural Development for rural roads clouse- 305.1(Clause - Three Hundred Five point One) including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials, including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited).all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places, in specified manner, systematically with due consideration to avoiding adverse effects on environment, trimming filling of unevenness blind age and finishing of the road to specified dimension to the entire satisfaction as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.
Providing and laying reinforced cement concrete RCC grade -25 (Twenty five) 1:1.5:3 ( One cement : One and Half Sand : Three graded stone aggregate ) in superstructure as per drawing and as per Ministry of Rural Development technical specifications Clauses 800, 1205.4 and 1205.5 in all heights and depth including haulage of material with in all leads, lifts , carriage of materials and other incidentals complete as directed by the Engineer In charge.
Providing and laying reinforced cement concrete PCC grade-20(Twenty) 1:2:4 ( One cement : Two Sand : four graded stone aggregate ) in Sub-structure as per drawing and as per Ministry of Rural Development technical specifications Clauses 802, 804, 805, 807,1202 and 1204 in all heights and depth including haulage of material with in all leads, lifts , carriage of materials and other incidentals complete as directed by the Engineer In charge.
Providing and laying cement concrete 1:4: 8 ( one cement : four sand: Eight graded crusher stone aggregate 40mm ( Forty millimeter nominal size) and curing complete including the cost of form work for plain / reinforced concrete in open foundation/ sub-structures complete as per drawing and HP.PWD. as per Ministry of Rural Development Technical specifications. Clauses 802, 803, 1202 and 1203 including haulage of material with in all leads, lifts , carriage of materials and other incidentals complete as directed by the Engineer In charge.
Supplying, fitting, and placing HYSD bar reinforcement in super structure complete as per drawing and as per Ministry of Rural Development technical specifications Clauses 1002, 1010 and 1202 in all heights and depth including haulage of material with in all leads, lifts , carriage of materials and other incidentals complete as directed by the Engineer In charge.
Providing Drainage Spouts complete as per drawing and as per Ministry of Rural Development Technical specifications as per clause 1209.including haulage of material with in all leads, lifts , carriage of materials and other incidentals complete as directed by the Engineer In charge.
Providing and laying filter media with granular crushed aggregates as per specifications to a thickness of not less than 600 ( Six hundred) mimlimetre with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 within all leads lifts.and carriage of material as per the direction of the Engineer Incharge.
Providing weep holes in brick/stone masonry/plain/ reinforcement concrete work abutment, wing walls, return walls with 100 mm ( One hundred milimetre) dia A/C pipe extending through the full width of the structure with slope of 1(One verical) : 20 (Twenty Horizetial) toward drawing face complete as per drawing and as per Ministry of Rural Development technical specification clause 614,709, 1204.3.7. including all leads, lifts a, carriage of materials and other incidentals complete as per entire satisfaction of the Engineer in charge.
Banking excavated earth in layers in all depth, breaking clods. Watering, rolling each layer with half tonne roller, or steel rammers, androlling every 3rd (three) layer with power roller of minimum 8 (eight) tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks with in aleads and lifts .including haulage of material with in all leads, lifts , carriage of materials and other incidentals complete as directed by the Engineer In charge.
dinesh singta
SATPAL
AJAY CHAUHAN
M/S VIKRAM SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .