| 1 | L1₹9.7 LAccepted-AOC MARANADI KHOWAI | ₹9.7 L | L1 | Accepted-AOC STOOD L1 |
| 2 | L2₹10.0 L+₹22,697.12 (2.33%)Rejected-Finance PURAN BAZAR KHOWAI TRIPURA PIN 799201 | KHOWAI | KHOWAI | TRIPURA | 799201 | ₹10.0 L+₹22,697.12 (2.33%) | L2 | Rejected-Finance HIGHER THAN L1 |
Tender Value
₹10.8 L
EMD Value
₹21,616
Closing Date
22 Jun 2026, 2:00 pmClosed
The Executive Engineer Agri West Agartala
The Executive Engineer West-I Department of Agriculture and F W Agartala Tripura
Construction of Boundary Wall and Yard Development for Village Level Farmers Advisory Centre at Sonatala.
2026_AGRI_73731_1
22/AGRI/EE(WEST-I)/2026-27
Open Tender
Civil Works
Percentage
90 days
SONATALA
AS PER DNIT
6 documents required · 6 mandatory
₹1,000
₹21,616
27 Aug 2026
12 Jun 2026
22 Jun 2026
13 Jun 2026
22 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, liftupto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 53.57 | Cum | 231.6 | ₹12,406.81 |
| 2 | Filling available excavated earth (excluding rock) in trenches,plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
-All kinds of soil | 35.71 | Cum | 161.3 | ₹5,760.02 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 3.35 | Cum | 1,177.3 | ₹3,943.96 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | 3.35 | Cum | 8,980 | ₹30,083 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 18.57 | Cum | 11,693.5 | ₹2,17,148.3 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 3.88 | Cum | 12,925.6 | ₹50,151.33 |
| 7 | Centering shuttering including struttings, propping etc.and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank | 22.32 | Sqm | 333.9 | ₹7,452.65 |
| 8 | Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank | 56.25 | Sqm | 391 | ₹21,993.75 |
| 9 | Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank | 62 | Sqm | 570 | ₹35,340 |
| 10 | Reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto floor five level. Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars. | 2,694.2 | kg | 103.9 | ₹2,79,927.38 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_75039.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_75039.xls
BOQ • 0.29 MB
DNIT22.pdf
Tender Documents • 4.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .