Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.0 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDARI SHAHDOL MP | NOWROZABAD | UMARIA | MADHYA PRADESH | 484110 | L1 | Accepted-AOC L1 | |
| 2 | L2₹69.0 L+₹63.2 L (1080.0%)Rejected-Finance 444 VIVEKANAD NAGAR MOPKA DISTRICT BILASPUR C G | BILASPUR | BILASPUR | CHHATTISGARH | L2 | Rejected-Finance L2 | |
| 3 | L3₹79.1 L+₹73.2 L (1252.2%)Rejected-Finance A 49 10 VINDHIYA COLONY PINOURA NOWROZABAD DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical WARD NO 06 JAMUNA COLLIERY JAMUNA COLLIERY JAMUNA COLLIERY ANUPPUR MADHYA PRADESH 484444 | ANUPPUR | MADHYA PRADESH | 484444 | - | Rejected-Technical Not complied work experience as define in NIT. |
Tender Value
₹85.8 L
EMD Value
₹1.1 L
Closing Date
22 Jul 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO(Mining) Baikunthpur Area.
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Maintenance of 1200 / 1000 mm wide main belt conveyor namely 79 Ist belt, C8 and C9 belt conveyors in UG at West Block of Churcha Mine (RO).
2022_SECL_248643_1
SECL/BKP/SO(M)/22-23/CW/eT/13 Dt.01.07.2022
Open Tender
Civil Works - Others
Item Rate
365 days
West Block of Churcha Mine (RO)
Please refer Tender document
5 documents required · 5 mandatory
₹1.1 L
21 Nov 2022
2 Jul 2022
25 Jul 2022
3 Jul 2022
22 Jul 2022
3 Jul 2022
3 Jul 2022 - 15 Jul 2022
Amount
Item Description/ Heading : - (Work Period - 365 days)
Cleaning of spillage coal and Maintenance of 1200mm / 1000mm like levelling, alignment, replacement of structure / brackets, top & bottom roller etc. and joint repairing of belt in underground. Scope of work: - Cleaning of spillage coal, Levelling of belt, Alignment of belt, Replacement of top rollers, bottom rollers, channel, carrier, stool etc. and stacking damaged item as directed, joint repairing & belt fastening & greasing and maintenance of drive head discharge and tail end. ( Average 05 manpower skilled and 11 manpower unskilled for 312 days) (Total Manpower = 4992)
Total impact of GST for the purpose of CTC
MAYANK CONSTRUCTION
ABADH KISHOR SHARMA
stage.html
html • 0.05 MB
technical_256882.pdf
PDF • 0.27 MB
techsummary_256882.pdf
PDF • 0.20 MB
finance_256882.pdf
PDF • 0.19 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_256882.pdf
PDF • 0.47 MB
AOC49CW13.pdf
PDF • 1.98 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .