Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.7 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹33.0 L+₹29,003.01 (0.89%)Rejected-Finance HISAR HISAR HARYANA | HISAR | HARYANA | 125001 | 2 | Rejected-Finance Rejected | |
| 3 | 3₹33.4 L+₹70,260.81 (2.15%)Rejected-Finance | 3 | Rejected-Finance Rejected | |
| 4 | 4₹33.9 L+₹1.2 L (3.61%)Rejected-Finance | 4 | Rejected-Finance Rejected | |
| 5 | 5₹44.0 L+₹11.3 L (34.6%)Rejected-Finance | 5 | Rejected-Finance Rejected |
Tender Value
₹40.8 L
EMD Value
₹80,000
Closing Date
6 Apr 2026, 5:00 pmClosed
Narender Singh Suhag
Municipal Corporation Yamunanagar
Const of Street and Drain From H/o Pritam to Goga Madi, H/o Jagmal to Plot of Joginder, Ravidas Mandir to Main Road, Adjoining H/o Raj Kumar, Sant Ram ki Chakki to IPS, H/o Karam Chand to H/o Amar Nath, Ravidas Mandir to Pawan Mistri, W11 Recall
2026_HRY_511425_1
20260BCBD69B C2F5 42B1 8EAA 2A3E966539F0288ULB
Open Tender
Civil Works
Works
100 days
Yamunanagar
2 documents required · 2 mandatory
₹5,000
₹80,000
Yes
17 Apr 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
6 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | - | cum | 1,863 | - |
| 1.02 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | - | Sqm | 113 | - |
| 1.03 | [17.23.1]Water Bound Macadam Grading - II 1. Water Bound Macadam (63mm to 45 mm) Grading I with screening Type “A” (13.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate] | - | cum | 1,188 | - |
| 1.04 | [17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate] | - | cum | 184 | - |
| 1.05 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | - | Sqm | 655 | - |
| 1.06 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | - | Sqm | 26 | - |
| 1.07 | [21.2.2]Dismantling existing drains of different sizes cunnettes, section only including recovery of all useable materials, stacking the same near site of dismantled works and disposal of all rubbish off site of works. 2. Type I Drain [Through Rate] | - | 10 Metres | 327 | - |
| 1.08 | [21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate] | - | Metre | 160 | - |
| 1.09 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] | - | Metre | 363 | - |
| 1.1 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | - | cum | 66 | - |
stage.html
html • 0.05 MB
technical_590221.pdf
techsummary_590221.pdf
finance_590221.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_590221.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .