Loading…
Loading…
Tender Value
₹11.0 L
EMD Value
₹27,533
Closing Date
28 Sept 2026, 11:00 amDue tomorrow
Assistant Executive Engineer
Assistant Executive Engineer, MI SUBDIVISION ALUVA
Annual Maintenance of LIS
2026_Irrig_872607_1
IRR/IA/TR/3810/2026_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
300 days
Aluva
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹27,533
Yes
24 Sept 2026
24 Sept 2026
29 Sept 2026
24 Sept 2026
28 Sept 2026
24 Sept 2026
24 Sept 2026 - 28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 15,604 | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 93.5 | cum | - | - |
| 1.003 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 14,063 | sqm | - | - |
| 1.004 | OD24408/2026-2027:Supplying and providing plastic mesh 25x25x2mm for trashrack to fixing GI pipe frames including cost and conveyance of all materials and labour charges etc complete as per the direction of departmental officers at site | 76 | sqm | - | - |
| 1.005 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 67.57 | kg | - | - |
| 1.006 | OD24407/2026-2027:Labour engaged for clearing bloccks in siphons, removal of obstructions and waste etc in canal during the entire periods of water distribution. | 30 | each | - | - |
| 1.007 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 8.36 | cum | - | - |
| 1.008 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.62 | cum | - | - |
| 1.009 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.3 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1479868.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Preliminaryagmt.pdf
Tender Documents • 0.06 MB
PAY.pdf
Tender Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .