Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
₹12.8 L
EMD Value
₹32,111
Closing Date
28 Sept 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer
The Executive Engineer PWD Roads Division Kollam
GENERAL-RM 2022-23/cluster 2/ one year RC/Karunagappally/KLM-- RM 2022-23 Zone 4- One year Running Contract for Various PWD Roads Under Roads Section Karunagappally in Kollam District - 7 road stretches for a length of 17.139
2023_PWD_562584_8
132/ET/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
360 days
Kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹32,111
Yes
23 Dec 2023
20 Sept 2023
30 Sept 2023
20 Sept 2023
28 Sept 2023
20 Sept 2023
Amount
Appendix A Reactive Maintenance/Initial rectification
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
OD160114/2022-2023:Providing,laying and rolling of close graded pre mix carpet of 20mm thickness composed of 11.2mm to 0.09mm(MORTH-M-041) aggregates premixed using viscosity grade Bitumen usingVG30 to the required line gradeand level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tonne capacity and finishing to required level and grade
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Appendix B Premonsoon Works
OD34868/2022-2023:Engaging mazdoor for lowering side berms ,clearing side berms, clearing side drains ,removing silt and clay from culverts and BT surface,cutting earthen drains,diverting blocked water,removing the branches of fallen trees or trees leaned towards the road clearing traffic blockage ,stack the wood at suitable place and various works as directed by engineer in charge
OD130771/2022-2023:Filling up pot holes with bituminous ready mix compacting (25kg bag) and compacted (rate is arrived a bag of 25kg )and compacted by ramming to get a compact surface including cost of materials laying charges, transportation to site etc complete. Assuming that an average of 30 bag of 25kg ready mix compound will laid in pot holes in a day
OD130772/2022-2023:Engaging tipper for conveying waste and debrisfrom site as per the direction of departmental officers in charge
OD130773/2022-2023:Engaging Hydraulic Excavator of 1cum bucket for various works as directed by the officer in charge.
Appendix C Proactive/Prevent Maintenance
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
Appendix D Road Emergency works
OD130784/2022-2023:Engaging tipper for conveying waste and debrisfrom site as per the direction of departmental officers in charge
OD130785/2022-2023:Engaging Hydraulic Excavator of 1cum bucket for various works as directed by the officer in charge.
OD35314/2022-2023:Engaging mazdoor for lowering side berms ,clearing side berms, clearing side drains ,removing silt and clay from culverts and BT surface,cutting earthen drains,diverting blocked water,removing the branches of fallen trees or trees leaned towards the road clearing traffic blockage ,stack the wood at suitable place and various works as directed by engineer in charge
Appendix E Routine Inspection Charges
OD34884/2022-2023:Conducting and Reporting Routine Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period of the Running Contract as directed by the departmental officers at site. Additional RI may be required in response to reports of complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc and are not measurable/ payable. A proportion of the RI should be carried out either during or immediately following a period of we weather.
Bidder Name
SALIM MOHAMMED KUNJU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_901599.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .