Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹3,980
Closing Date
19 Aug 2023, 4:00 pmClosed
Executive Engineer
Executive Engineer Hydraulic Division Uri
Construction of protection work by way of RR masonary retaining wall near house of Mushtaq Ahmad and others at Salamabad Dachina
2023_IFC_226054_3
eNIT No 32 of 2023-24
Open Tender
Civil Works
Item Rate
15 days
Uri
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Hydraulic Division Uri
₹3,980
21 Aug 2023
11 Aug 2023
21 Aug 2023
11 Aug 2023
19 Aug 2023
11 Aug 2023
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone (including all sorts of carriages upto site of work)
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) (including all sorts of carriages upto site of work)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (including all sorts of carriages upto site of work)
Flush pointing in stone work with cement mortar 1:3 (1 cement : 3 fine sand) (including all sorts of carriages upto site of work)
Dumping stones including cost of stones in Horizontal on level including costof stones (including all sorts of carriages upto site of work)
GH MOHAMMAD NAIK
Mohammad Amin Khan
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .