Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | Rejected-Technical | - | Rejected-Technical 2nd lowest |
Tender Value
Refer Docs
EMD Value
₹26,800
Closing Date
18 Jan 2021, 3:00 pmClosed
Executive Engineer
Kerala Water Authority, P.H. Division, Malappuram
State plan 2020-21- MWSS Malappuram- Supply, erection, testing and commissioning of Centrifugal pump set with starter to suit the existing accessories in old clear water pump house Malappuram
2020_KWA_402393_1
KWA/EE/PH/MPM/160/20-21
Open Tender
Civil Works - Water Works
Percentage
120 days
Malappuram
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,800
₹26,800
Yes
16 Jun 2021
28 Dec 2020
20 Jan 2021
28 Dec 2020
18 Jan 2021
28 Dec 2020
Amount
Pump : Supply, erection, testing and commissioning of KWA pre-qualified reputed make Centrifugal pump sets with Bronze/SS impeller, SS shaft and CI pump casing with suitable type base plate with coupling, coupling guard foundation bolts & nuts etc. complete suitable for coupling the pump and motor above the base plate etc. complete including providing suitable concrete foundation including cost of cement sand and metal etc. complete Discharge - 70Lps Total Head - 75 Mtrs Suction Head- Alternatively the inlet & outlet levels, type, size & ength of pumping main etc. can be given. Minimum thickness for GI/MS pipes may be specified. Modification may be done for Monoblock pump sets
Starter: Supply, erection, testing and commissioning of suitable rating (Fully Automatic starter with air break contact for less than 100HP and for above 100HP FCMA starters to be used) starter suitable for the above motor with over voltage and under voltage protection, single phase preventer, over load relay with motor protection relay with main contractor and bypass contractor as per IE rules and code of practice etc. complete
Cabling work: Supply, laying, testing and commissioning of suitable size XLPE cables for the above pumpset from panel board to starter and from starter to motor considering energy conservation.
Erection charges for all the items above including fitting charges and transportation charges to work site etc.completed including trial running, commissioning and maintenance period of 2Years .
Note : GST extra as applicable .GST will be paid as per norms of KWA and Govt.of Kerala
K SUNDARAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .