Loading…
Loading…
Tender Value
₹60.2 L
EMD Value
₹61,000
Closing Date
8 Sept 2026, 6:00 pm
Executive Engineer Medium Irrigation Project Division, Ankleshwar
Construction of Ashphalt Road from Moti Bhamri Village Road To Karjan Vadi Pumping Station Ta.Nandod
335488
06 of 2026-27
Open
Civil Works - Roads
Works
Bharuch
11 documents required · 10 mandatory · 1 optional
₹2,400
Executive Engineer, Medium Irrigation Project Division, Ankleshwar
₹61,000
18 Aug 2026
18 Aug 2026
18 Aug 2026
8 Sept 2026
18 Aug 2026
BILL OF QUANTITIES
Construction of Ashphalt Road from Moti Bhamri Village Road To Karjan Vadi Pumping Station
Ta.Nandod Dist.Narmada
Item Description of Item (with brief specification and Rate In
Quantity Unit Amount
No reference to book of specifications) figures
Clearing and grubbing road land including uprooting rank
vegetation grass bushes,shrubs,sapling and trees girth up to
1 300 mm removal of stumps of trees cut earlier and disposal 0.21 Hact. 28455.09
of unserviceable materials (C) By mechanical means in area
of light jungle
Box cutting the road surface to proper slope and camber for
making a base of road work including removing the
excavated stuff and depositing on the road side slopeas
directed up to 50 mts. Lead.
Earthwork in cutting in all sorts of soil and soft murrum
includng conveying and spreading the stuff, embankment as
and where directed within 200 Meters from the end of
cutting with all required lead and lift.
Providing laying and Spreading Granular sub-base (Grade I)
by providing close graded MCBT material in single layer with
motor grader on prepared surface, mixing by mix in place
method with rotavatore at OMC and compacted with
vibratory roller 80 to 110 KN static weight to achieve desire
density etc completed.
Providing and laying compacted layer of WBM of Grading-I
MCBT metal of size 63 mm to 45 mm in required layers
5 including using 16% stone screening, 13.2mm size and 8% 863.00 Cum 1208.97
stone dust as filler including spreading watering &
consolidation by vibratory roller etc. comp.
Providing and laying compacted WBM of Grading-II MCBT
metal of size 53 to 22.4 mm in required layers including
6 using 24% stone screening, 11.2 mm size and 8% stone dust 575.00 Cum 1404.91
as filler including spreading watering & consolidation by
vibratory roller etc. comp.
Earthwork for embakment including breaking clod, dressing
7 with all lead and lift (including watering and consolidation) 563.00 cum 196.49
(A) From Borrow pits within land width
Providing and laying quarry spall of approved quality
8 including spreading, watering consolidation with vibratory 209.00 Cum 711.04
roller including loading and unloading etc. complete.
Providing and laying Bituminous Grout 37.5 mm thick
compacted with B.T. aggregate as per M.O.R.T. & H.
specification and using Asphalt VG30 at the rate of 19.90 KG.
/ M.T. i.e. 1.99 % of total weight of mix, including heating and
mixing asphalt and aggregate by continuous of drum mix
9 plant and hot laid process laying with paver finisher and 361.00 MT 1980.61
consolidation with Vibratory roller as per M.O.R.T. & H
specification to achive desire density, including cost of
labour, materials , Asphalt, aggregates, labour charges,royalty
charges etc. completed using as directed, including flushing
key agg. @0.13 cum / 10 sq.m.
Providing and laying 37.50mm thick B. M.using B. T. Chips as
per required gradation and using asphalt as binder of VG-30
grade at the rate of 3.50% by weight of mix including tack
coat at 2.50 kg. / 10 sqm. of Bitumen, heating and mixing the
bitumen and aggregate by drum mix plant and laying by
paver finisher including consolidation with vibratory roller
and providing and operating plant and machinery and
equipment including cost of fuel, oil, lubricant , labour
charges, flushing of stone dust / sand @ 0.03 cum/10 sqm.,
cost of asphalt and aggregate etc. complete.
Providing and laying 20 mm thick mix seal surfacing using
stone chips as per gradation asphalt VG-30 (60-70) for
mixing at the rate of 51 Kg/M.T. (5.10%) of mix including
heating the asphalt and aggregate by continious batching of
11 hot mix plant and spreading the same by paver finisher and 192.00 M.T 3811.74
consolidation with vibratory roller 80-100 K.N. static weight
including the cost of labour charges, oil, kerosene, lubricants
etc. complete using contractor's own machinary and plant
Providing and laying Tack evenly tack using rapid setting
Emulsion (RS-1) material at the rate of 4.00 kg/10 sqm on
road surface using emulsion pressure sprayer including the
cost of all labour materials, heating, machinery & Equipment.
Providing and laying Tack evenly tack using rapid setting
Emulsion (RS-1) material at the rate of 2.50 kg/10 sqm on
road surface using emulsion pressure sprayer including the
cost of all labour materials, heating, machinery & Equipment.
Providing and laying Asphalt Painting on B.T. surface with
bitumen VG 30 at the rate of 5.00 kg/ 10sqm, and spreading
stone dust for painting surface at the rate of 0.03 cum/
Road marking with hot applied thermoplastic paints with
reflectorising glass beads on bitumin surface providing and
laying a hot applied thermoplastic compound 2.5 mm thick
including reflectorising glass beads @ 250gms per sqm area,
thickness of 2.5mm is excluding of surface applied glass
beds as per IRC:35-2015. The finished surface to be level,
uniform and free from streaks and holes. zebra patta /bump
15 patta lane/center line/ edge line/cut patta. The white color 209.00 Sqmt 367.72
marking should provide liminance coefficinet on cemend
road shalll be min 130 mcd/m2/lux and Asphalt road shall be
min 100 mcd/m2/lux during the service life during the day
time. The marking should meet the performance criteria for
night time reflectivity, wet reflectivity and skid resistance as
mentioned in the section-15 of IRC 35-2015. Warranty for
the Retro reflectivity should be two years
I/We am/are willing to carry out the work at…….. % above/below percent(Should be written in figures and words) of the
estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which no
extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
Executive Engineer
Medium Irrigation Project Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD KVK Road.pdf
BOQ KVK road.pdf
Tech Spec KVK Road.pdf
Drawing KVK Road.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].