Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.8 L+₹1,447.56 (0.10%)Rejected-AOC | L2 | Rejected-AOC rejected | |
| 3 | L3₹15.2 L+₹37,591.43 (2.54%)Rejected-AOC KERALA KL | KANNUR | KERALA | 670511 | L3 | Rejected-AOC rejected | |
| 4 | L4₹16.6 L+₹1.7 L (11.7%)Rejected-AOC HIGH COURT VENDOR RNAKULAM | L4 | Rejected-AOC rejected |
Tender Value
₹15.6 L
EMD Value
₹39,101
Closing Date
3 Dec 2019, 2:00 pmClosed
Exe. Engineer PWD Buildings Division Ernakula
Exe. Engineer PWD Buildings Division Ernakula
Ayurveda college Thripunithura - Construction of Under ground water tank - East side of the Hospital building
2019_PWD_324302_1
PWD/2019-2020/3149/EKM
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thripunithura
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
online
₹39,101
Yes
14 Feb 2020
23 Nov 2019
7 Dec 2019
23 Nov 2019
3 Dec 2019
23 Nov 2019
23 Nov 2019 - 3 Dec 2019
Amount
Under ground water tank -East side
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od68961/2017_2018 : Dry rubble Packing with hard stone in foundation and plinth including cost of stone,Conveyance,Labour etc complete as per the direction of the departmental officers at site.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
22.5 : Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b) Second layer of slurry of cement @ 0.242 kg /sqm mixed with water proofing cement compound @ 0.126 kg/ sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.
13.7.1 : 12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand)
19.18.3 : Supplying and fixing C.I with out frame for manholes:560 mm diameter ( heavy duty) the weight of the cover to be not less than 108 kg
RATHEESH RAJAN
Jibin Jacob
MOHAMMED SHAFEEK T A
Bidder Name
Jibin Jacob
MOHAMMED SHAFEEK T A
madhu
RATHEESH RAJAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_448719.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .