Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 LRejected-AOC | ₹2.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JAYAMON JOSEPH L2 | GEO THOMAS L1 |
|---|---|---|---|---|---|
| 1.00Annual maintenance of RBMC | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 9,000 | sqm | 15.8 ₹1.4 L | 15 ₹1.4 L |
| 1.00 | OD18680/2025-2026:Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kinds of soil for clearing the canal bed for desilting and relining as per the direction of departmental officers at site. | 13.57 | cum | 400 ₹5,427.20 | 300 ₹4,070.40 |
| 1.00 | OD18681/2025-2026:Engaging coolie for the removal of floating materials from the canal wherever necessary during the water distribution and removal of silt and slipped earth at salient points depositing the same at places pointed out by the departmental officers without causing disturbance to the public including lowering and greasing the shutters and providing earth filled gunny bags at salient points etc complete as per the specification and as per direction of departmental officers at site | 41 | Day | 900 ₹36,900 | 900 ₹36,900 |
| 1.00 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | 1 | each | 22,500 ₹22,500 | 22,500 ₹22,500 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 5 | each | 2,250 ₹11,250 | 2,250 ₹11,250 |
Tender Value
₹2.5 L
EMD Value
₹6,243
Closing Date
21 Oct 2025, 5:00 pmClosed
BIJU M G
O/O the Assistant Executive Engineer, KIP RB Sub Division No II Thenmala
Annual maintenance like clearing light jungle, removal of silt and sediments from canals, removal of floating bodies during water distribution using labourers and tree cutting using in aqueduct and canal included in this estimate.
2025_Irrig_809361_1
IRR/PII/TR/3805/2025_5_1_1/1
Open Tender
Civil Works - Canal
Thenmala
Please refer Tender documents.
7 documents required · 7 mandatory
₹660
Yes
₹6,243
Yes
10 Feb 2026
14 Oct 2025
23 Oct 2025
14 Oct 2025
21 Oct 2025
14 Oct 2025
Amount
Annual maintenance of RBMC
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD18680/2025-2026:Earth work in rough excavation for removing silt and sediments from canal , lead upto 50 m and lift upto 3 m in all kinds of soil for clearing the canal bed for desilting and relining as per the direction of departmental officers at site.
OD18681/2025-2026:Engaging coolie for the removal of floating materials from the canal wherever necessary during the water distribution and removal of silt and slipped earth at salient points depositing the same at places pointed out by the departmental officers without causing disturbance to the public including lowering and greasing the shutters and providing earth filled gunny bags at salient points etc complete as per the specification and as per direction of departmental officers at site
2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
JAYAMON JOSEPH (BID ID -2398757)
Bidder Name
GEO THOMAS
JAYAMON JOSEPH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1350261.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 0.43 MB
prel.pdf
Tender Documents • 0.03 MB
fot.pdf
Tender Documents • 0.01 MB
BOQ_1350261.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.63 MB
affid.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid