Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹3.7 L+₹13,074.50 (3.62%)Rejected-AOC ASHAYIL CHENGARA PATHANAMTHITTA | KOTTAYAM | KERALA | 686001 | L2 | Rejected-AOC SECOND LOWEST | |
| 3 | L3₹3.8 L+₹19,119.90 (5.29%)Rejected-AOC | L3 | Rejected-AOC THIRD LOWEST | |
| 4 | L4₹3.8 L+₹22,291.90 (6.17%)Rejected-AOC | L4 | Rejected-AOC FOURTH LOWEST |
| Sl No | Description | Qty | Unit | JOJY JOEPH L3 | VARKEY.K.K L1 | LOVELY CONSTRUCTION L4 | RAJESH A BHASKAR L2 |
|---|---|---|---|---|---|---|---|
| 1.00Maintanance work | |||||||
| 1.00 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 580 | kg | 198 ₹1,14,840 | 188.1 ₹1,09,098 | 200 ₹1,16,000 | 183 ₹1,06,140 Lowest |
| 1.00 | OD341890/2022-2023:Roofing with GI hard colour powder coated traffold sheet .35mm thick or nearest available
thickness with overlap of 150mm at ends and GI hook or crank CI bolts and nuts including plain
washers and bitumin washers etc. complete. | 47.04 | per sqm | 608 ₹28,600.32 | 577.3 ₹27,156.19 Lowest | 618 ₹29,070.72 | 602 ₹28,318.08 |
| 1.00 | OD306131/2022-2023:Providing and fixing150mm PVC gutter pipe cemicircular section including fittings with 32x5mm MS flat
support 1m intervel etc complete | 40 | metre | 264 ₹10,560 | 251.3 ₹10,052 Lowest | 270 ₹10,800 | 450 ₹18,000 |
| 1.00 | 11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. | 32.14 | sqm | 1,843 ₹59,235.86 | 1,749.64 ₹56,235.18 Lowest | 1,843 ₹59,235.86 | 1,766.26 ₹56,769.36 |
| 1.00 | 50.6.2.3:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 2.75 | cum | 8,189 ₹22,478.81 | 7,772.09 ₹21,334.39 Lowest | 8,200 ₹22,509 | 7,977.84 ₹21,899.17 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.55 | cum | 309 ₹168.71 | 294.18 ₹160.62 Lowest | 309 ₹168.71 | 296.94 ₹162.13 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.19 | cum | 7,113 ₹1,365.7 | 6,750.65 ₹1,296.12 Lowest | 7,113 ₹1,365.7 | 6,814.89 ₹1,308.46 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 5.09 | sqm | 350 ₹1,780.8 | 332.15 ₹1,689.98 Lowest | 350 ₹1,780.8 | 335.31 ₹1,706.06 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.74 | cum | 8,340 ₹6,154.92 | 7,915.52 ₹5,841.65 Lowest | 8,340 ₹6,154.92 | 7,990.86 ₹5,897.25 |
Tender Value
₹3.8 L
EMD Value
₹9,523
Closing Date
12 Jan 2023, 5:00 pmClosed
AE
LID and EW section Ramankary GP
Anganvaadi 43 Roofing ward No.5 in Ramankary Grama panchayath-General Civil Work
2023_LSGD_546095_1
ET-12/143/AE/LSGD/RMKY/2022
Open Tender
Civil Works - Buildings
Item Rate
180 days
Ramankary
Please refer Tender documents.
7 documents required · 7 mandatory
₹840
₹9,523
4 Jun 2026
4 Jan 2023
13 Jan 2023
4 Jan 2023
12 Jan 2023
4 Jan 2023
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .