DHONE MUNICIPALITY
Dhone
Construction of CC Road and 300mm CC drain from H.No: 7-2-26-4-4 TO Madhavaswamy house in ward no.24 in Pochaprabhakar reddy nagar Dhone Municipality.
923574
17/General Fund/2025-26/E1
OPEN - NCB
Public Health Engineering Works
NANDYAL, ANDHRA PRADESH
7 documents required · 6 mandatory · 1 optional
₹157
₹4,433
13 Apr 2026
13 Apr 2026
13 Apr 2026
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with initial lift of 3 mts and lead upto 50 m as per Technical Specification Clause 302.3 as directed by the Engineer in charge of the work
Construction of Granular sub-base by providing HBT(Trap) material confirming to Grading - V of MoRT&H Table 400-1 including cost and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. Excluding Seingorage Charges
Providing, Laying, Spreading and compacting graded HBT(Trap) crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. Excluding Seingorage Charges
Construction of VCC M30, 20mm Graded metal un-reinforced, at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 / 53 grade cement or any other type as per Clause 1501.2.2 and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, scared and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant,near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Note: Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS Code and as directed by the Engineer-in-Charge
Carting of excavated Earthwork with a lead of 1 km, including loading & unloading and conveyance charges for machines per kilometer for transporting materials by tippers and tractors etc., complete as directed by the Engineer-in-charge of work.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 / MORTH and as directed by the Engineer-in-Charge
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Manual Means and as directed by the Engineer-in-Charge
Supply and filling with stone dust in levelling course complying with standard specifications including cost and conveyance of sand to site to work labour charges watering tamping, ramming etc complete and as directed by the Engineer-in-Charge of the work (APDSS No.101).
Providing concrete for plain/reinforced concrete (1:2:4) M15 Nominal mix in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. and as directed by the Engineer-in-Charge
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete and as directed by the Engineer-in-charge for finished item of work.
Providing and laying reinforced cement concrete design mix RCC M20 using concrete mixer in super structure as per drawing and technical specifications clauses 800,1205.4 and 1205.5 MORD/sections 1500,1600&1700 MORTH for culvert. and as directed by the Engineer-in-charge of work
Carting of excavated Earthwork with a lead of 1 km, including loading & unloading and conveyance charges for machines per kilometer for transporting materials by tippers and tractors etc., complete as directed by the Engineer-in-charge of work. (80% of earth work qty)
Asst. Engineer Dhone Municipality
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ.xlsx
TENDER_DOCUMENT • 1.69 MB
NIT.doc
TENDER_DOCUMENT • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .