| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹16.2 L+₹32,582.88 (2.05%)Rejected-Finance | L2 | Rejected-Finance Second lowest |
Tender Value
₹16.2 L
EMD Value
₹40,500
Closing Date
20 Feb 2020, 5:00 pmClosed
Executive engineer
Executive engineer,Irrigation Division,Ernakulam
Desilting
2020_Irrig_341865_1
41/EE/I/2019-20/S(RT)
Open Tender
Civil Works - Others
Item Rate
120 days
chellanam
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,750
online
₹40,500
Yes
27 Aug 2020
7 Feb 2020
24 Feb 2020
7 Feb 2020
20 Feb 2020
7 Feb 2020
7 Feb 2020 - 20 Feb 2020
Amount
SCHEME 1 (CHAINAGE 1897 -2037)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 2 (CHAINAGE 2037 -2177)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 3 (CHAINAGE 2177 -2317)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 4 (CHAINAGE 2317 -2377)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 5 (CHAINAGE 2377 -2517)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 6 (CHAINAGE 2517 -2657 )
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 7 (CHAINAGE 2657 -2797)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 8 (CHAINAGE 2797 -2937)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 9 (CHAINAGE 2937 -3077)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 10 (CHAINAGE 3077 -3217)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 11 (CHAINAGE 3217 -3357)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
SCHEME 12 (CHAINAGE 3357 -3497)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.il
SCHEME 13 (CHAINAGE 3497 -3637)
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Earth work in excavation in all kinds of soil by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, with all leads and lifts and stacking the spoil in shape without falling into the excavated area as well as without making inconvenience to the public as directed by Departmental officers at site.
QUBE CONSTRUCTION
Bidder Name
QUBE CONSTRUCTION
MUHAMMED ALSIFE K S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_478051.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .