Tender Value
₹50.7 L
Closing Date
29 Jun 2026, 4:00 pm
R G DESAI
Tender For Work of Height Rising of Various 220KV Class EHV Line under Agiyol AM Division Under R&M 2025-26
313129
2026-27 / HTC / 18
Open
Electrical and Maintenance Works
Sabarkantha
16 documents required · 16 mandatory
₹5,900
GETCO,Himatnagar
10 Jun 2026
10 Jun 2026
10 Jun 2026
29 Jun 2026
10 Jun 2026
No a Line-2 a Line-2 Line Line
Loc.No. Loc.No. Loc.No. Loc.No.
Check Survey along with plotting of line route on village (tika) map with
1 Coordinates including detailed survey, preparation of profiles and revision No. 3.5 3.5 1.2 3.2 11.4 9277.00
in original route alignment, if any and as per instruction of EIC.
Excavation excluding back filling, but including shoring, shuttering,
dewatering, tree cutting for tower footings etc. for :-
2 a) Normal soil either dry or wet/Sandy soil Cu.m 20 10 10 10 50 307.00
3 b) Black Cotton Soil either dry or wet Cu.m 96 48 48 48 240 614.00
Stub-setting with prop or template including back-filling, during back filling
dispose of excess soil and levelling of site is to be done as per instructions
of EIC but excluding excavation and concreting etc. for all types of
towers/extensions except special towers. (Weight of stub, cleat & template
with Bolt & Nuts of stub & template shall be counted)
5 Concreting of foundation by M20/M15/M25 mixture including shoring,
shuttering, compaction, dewatering etc. for normal tower / tower with
extension upto 25mtr.
After completion of concrete work, curring (watering to concerte) is to be
done as per instruction of EIC.
(Rates are inclusive of supply of GETCO approved Cement only.)
(M20 mixture) CUM 12 6 6 6 30 12246.00
(M15 mixture) CUM 1.2 0.6 0.6 0.6 3 10306.00
Installation of steel reinforcement in concrete foundation including supply of
GETCO Approved M.S. bars, binding wire. Work also includes their cutting,
bending, shaping and binding with binding wire and fixing in position of TMT MT
bars as per drawing before the concrete work and as per instruction of the
Grounding of towers with pipe type earthing including excavation and back
filling, with supply of all materials like 32mm dia heavy duty 3 mtr. long G.I.
7 Pipe, 50 x 6 mm G.I. flat, GI bolt-nuts, with GI spring washer, salt, charcoal SET 1 1 1 1 4 8985.00
etc. as per drawing and as per instruction of EIC.
Erection of super structure upto 6 meter extension including tree cutting,
fixing of tower accessories, attachments except ACD /DP /NP /CIP /PP and
excluding tack welding of bolts as per instruction of EIC. This includes
8 taking delivery of tower materials and bolt‑nuts from GETCO’s stores etc. MT 4.7 3.6 4.7 4.4 17.4 10076.00
for normal, extension & special towers at destination and keeping them in
safe custody and transporting the same to erection site.
Fixing of Anti-climbing devices including supply of barbed wire as per
9 drawing and as per instruction of EIC. LOC 1 1 1 1 4 3589.00
Fixing of DP / NP / PP / CIP including supply of plates and supply of G.I.
10 bolts-nuts & tack welding as per drawings and as per instruction of EIC.(b) LOC 1 1 1 1 4 3379.00
Tack welding of nuts upto approx. 10 mtrs. height OR two bottom-most
panel from ground level at three places on the nuts diametrically and PER
applying zinc rich paint immediately after tack welding and as per instruction BOLT
Stringing of ACSR/ AAAC 3 (Three) conductors for single circuit including
laying, jointing, tensioning, clamping with armour rods, hoisting of insulator
string fixing of jumpers, dampers etc. & with required tree cutting on entire
length for adequate clearances / safe charging of line, as per instruction of
EIC. FOR 220KV ZEBRA Condcutor
Complete Installation of OPGW cable (24/48 fibres) including laying,
providing required hardwares, in line splices to be encased in Fibre Optic
Splice Enclosures, Laying and termination of a fibre optic approach cable
required to connect Overhead Fiber Optic Cable (OPGW) between the final
13 Route Km. 3.5 3.5 1.2 3.3 11.5 97193.00
iin line splice enclosure on the gantry/tower and the Fibre Optec Distribution
panel (FODP) to be installed within the building at both the substation ends
as per technical specifications
14 Link up of OPGW Cable including all related activities as per inst. Of EIC. Route Km. 3.5 3.5 1.2 3.3 11.5 8850.00
Dismantling of OPGW cable with require accessories and creadit to
13 Route Km. 3.5 3.5 1.2 3.3 11.5 48597.00
GETCO's store OR Sub station as per instruction of EIC.
Dismantling of any type of tower including transportation & crediting to
14 PER MT 3.8 0 0 0 3.8 8434.00
nearest GETCO’s store or substation as per instruction of EIC.
Cutting of stubs of old tower to be dismantled including breaking of
chimney/cutting of RCC upto 450mm below ground level & crediting stubs & PER
steel bars to GETCO's store or substation including back‑filling & leveling of TOWER
site as per inst. of EIC.
Dismantling of conductors and line materials of existing line including
transportation & creaditing to nearest GETCO's store or substation as per
instruction of EIC. (A) COLD CONDITION 3 CONDUCTORS (S/C) ZEBRA
SUB TOTAL-Height Rising of Various 220KV Class EHV Line
GST@18% IN Rs
NET TOTAL IN Rs
Rs-Fifty lakhs Seventy Four Thousand Seven Hundred Fortyy Six Rs Only
CERTIFICATE
I we am / are willing to carry out the above work at_______________________________________ % above / below (percentage)
should be written in figures and words. ___________________________________________________________Percentage above /
below the tender amount work out Rs. ______________________________________________Rupees in
words____________________________________________________________________________
Signature of Contractor,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2026-27 HTC 18 Tech Bid.pdf
2026-27 HTC 18 Price Bid.pdf
Download all tender documents and submit your bid