Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹39.9 LQualified Make: JBFS
Model: CGI SHEET 8' X 800MM C O HARDWARE SUPPLY STORES OLD A T ROAD DOOM DOOMA TINSUKIA ASSAM 786151 UDYAM AS 26 0001111 18AFQPP8392H1ZK R M | TINSUKIA | ASSAM | 786151 | Make: JBFS
Model: CGI SHEET 8' X 800MM | ₹39.9 L | L1 | Qualified MII |
| 2 | L2₹39.9 L+₹4,699 (0.12%)Qualified Make: JBFS
Model: CGI SHEET 8' X 800MM 01 PAHARI BHOJPUR PAHARI BHOJPUR MIRZAPUR CUM VINDHYACHAL MIRZAPUR MIRZAPUR UTTAR PRADESH 231001 | MIRZAPUR | UTTAR PRADESH | 231001 | Make: JBFS
Model: CGI SHEET 8' X 800MM | ₹39.9 L+₹4,699 (0.12%) | L2 | Qualified MII |
| 3 | L3₹48.1 L+₹8.2 L (20.6%)Qualified Make: JBFS
Model: CGI SHEET 8' X 800MM 21 NEW GANJ BAZAR NADIAD KABRASTAN CROSS ROAD NADIAD KHEDA GUJARAT 387001 UDYAM GJ 12 0005097 | KHEDA | GUJARAT | 387001 | Make: JBFS
Model: CGI SHEET 8' X 800MM | ₹48.1 L+₹8.2 L (20.6%) | L3 | Qualified MII |
| 4 | Qualified Make: JBFS
Model: CGI SHEET 8' X 800MM | Make: JBFS
Model: CGI SHEET 8' X 800MM | - | - | Qualified MII |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
8 Jul 2026, 9:00 amClosed
Nails
9486158
GEM/2026/B/7680383
Two Packet Bid
Galvanized Steel Sheets (Plain and Corrugated) (V2) as per IS 277,Nails and Screw size 2 inch,False
Cachar, Assam
Total value wise evaluation
PRODUCT
5 documents required · 5 mandatory
3 yrs
₹20 L
₹1.6 Cr
10%
| Item | Delivery Location | Qty | Delivery | Spec |
|---|---|---|---|---|
| Galvanized Steel Sheets (Plain and Corrugated) (V2) as per IS 277 (Q2) | Cachar | 146 | 40 days | - |
| Nails and Screw size 2 inch | Cachar | 30 | 40 days | |
| False Tceiling complete set | Cachar | 240 | 40 days | |
| Ceramic floor tiles 600 mm x 600 mm | Cachar | 2,121 | 40 days | |
| Matt Ceramic Floor Tiles 600 mm x 600 mm | Cachar | 464 | 40 days | |
| Non Skid Ceramic floor tiles 300 mm x 300 mm | Cachar | 1,226 | 40 days | |
| Glazed ceramic wall Tiles 304 mm x 457 mm | Cachar | 1,174 | 40 days | |
| Wall putty | Cachar | 654 | 40 days | |
| Primer | Cachar | 93 | 40 days | |
| Distemper | Cachar | 93 | 40 days | |
| Red oxide Paint | Cachar | 80 | 40 days | |
| UPVC Pipe 25 mm dia 6 mtr | Cachar | 78 | 40 days | |
| 15 mm Piller Cock | Cachar | 21 | 40 days | |
| Kitchen sink | Cachar | 7 | 40 days | |
| Hand wash basin complete set | Cachar | 18 | 40 days | |
| Bib cock | Cachar | 38 | 40 days | |
| WC Indian Type with flushing system | Cachar | 7 | 40 days | |
| WC European Type flushing system | Cachar | 13 | 40 days | |
| Gate Valve 1 inch | Cachar | 29 | 40 days | |
| Plain Socket 1 oblique 2 inch | Cachar | 29 | 40 days | |
| Nipple 1 oblique 2 inch | Cachar | 37 | 40 days | |
| PVC solution | Cachar | 14 | 40 days | |
| M seal | Cachar | 45 | 40 days | |
| Tower ring | Cachar | 15 | 40 days | |
| PVC Elbow 1 inch | Cachar | 60 | 40 days | |
| PVC Tee 1 inch | Cachar | 45 | 40 days | |
| PVC Socket 1 inch | Cachar | 12 | 40 days | |
| PVC Union 1 inch | Cachar | 17 | 40 days | |
| PVC Plug 1 oblique 2 inch | Cachar | 21 | 40 days | |
| UPVC Nipple 1 oblique 2 inch x 2 inch | Cachar | 40 | 40 days | |
| Nahani Trap | Cachar | 20 | 40 days | |
| PVC P Trap 4 inch | Cachar | 4 | 40 days | |
| PVC Pipe 3 inch 6 mtr long | Cachar | 15 | 40 days | |
| PVC Pipe 4 inch 6 mtr long | Cachar | 9 | 40 days | |
| UPVC Plain Tee 4 inch | Cachar | 5 | 40 days | |
| UPVC Nipple 1 inch | Cachar | 20 | 40 days | |
| PVC Wire 1 pt 5 sqm 90 mtr roll | Cachar | 35 | 40 days | |
| Ceiling fan | Cachar | 30 | 40 days | |
| Switch board 4 x4 with socket | Cachar | 10 | 40 days | |
| Security light | Cachar | 5 | 40 days | |
| LED Bulb 09 W | Cachar | 28 | 40 days | |
| Tube light 40 W LED | Cachar | 82 | 40 days | |
| Insulation tap 6 mtr roll | Cachar | 100 | 40 days | |
| BTC Wire 10 sqm | Cachar | 1,480 | 40 days | |
| Switch board 4 x7 | Cachar | 26 | 40 days | |
| PVC wire 2.5 sqm 90 mtr roll | Cachar | 25 | 40 days | |
| PVC wire 4.0 sqm 90 mtr roll | Cachar | 19 | 40 days | |
| MCB 16 amp with box | Cachar | 19 | 40 days | |
| MCB 32 amp | Cachar | 19 | 40 days | |
| MCB 32 amp box 02 way | Cachar | 8 | 40 days | |
| Ceiling rose | Cachar | 80 | 40 days | |
| Angle Holder | Cachar | 100 | 40 days | |
| Fan Regulator | Cachar | 30 | 40 days | |
| 2 inch Screw | Cachar | 3 | 40 days | |
| LED Bulb 15 W | Cachar | 36 | 40 days | |
| Casing caping | Cachar | 178 | 40 days | |
| 16 Amp switch | Cachar | 86 | 40 days | |
| 16 Amp Socket | Cachar | 86 | 40 days | |
| 06 Amp Socket and switch | Cachar | 55 | 40 days | |
| PVC door complete set 6 p 5 ft x 2 ft with all accesseries | Cachar | 15 | 40 days | |
| Aluminium Window 3 pt 5 x 4 feet with all accesseries | Cachar | 22 | 40 days | |
| White Cement | Cachar | 233 | 40 days | |
| Copper Wire 1 pt 5 sqm | Cachar | 500 | 40 days | |
| Switch 6 AMP | Cachar | 40 | 40 days | |
| Led light 18 W | Cachar | 20 | 40 days | |
| Exaust Fan Plastic | Cachar | 10 | 40 days | |
| Combined Switch Socket 16 Amp | Cachar | 50 | 40 days | |
| LED tube light 22 W | Cachar | 60 | 40 days | |
| LED light 9 W | Cachar | 10 | 40 days | |
| 3 Pin electrical plug 5 Amp | Cachar | 30 | 40 days | |
| 2.5 sqm Copper wire | Cachar | 360 | 40 days | |
| Connecting pipe for wash basin and Kitchen sink | Cachar | 10 | 40 days | |
| Wash basin and Kitchen sink coupling | Cachar | 10 | 40 days | |
| Bib cock SS for Kitchen sink | Cachar | 5 | 40 days | |
| Bib cock SS for wash basin | Cachar | 5 | 40 days | |
| Angle Cock SS | Cachar | 37 | 40 days | |
| Sink Cover SS | Cachar | 5 | 40 days | |
| Mirror washroom | Cachar | 5 | 40 days | |
| Looking Mirror | Cachar | 11 | 40 days | |
| Mirror for rooms | Cachar | 5 | 40 days | |
| 10 feet UPVC pipe 3 oblique 4 inch | Cachar | 16 | 40 days | |
| UPVC T Socket 1 oblique 2 inch | Cachar | 20 | 40 days | |
| UPVC Elbow 1 oblique 2 inch | Cachar | 22 | 40 days | |
| CPVC Elbow 3 oblique 4 inch | Cachar | 15 | 40 days | |
| 4 inch PVC Pipe septic tank | Cachar | 14 | 40 days | |
| 4 inch PVC Bend | Cachar | 8 | 40 days | |
| Union Socket 1 oblique 2 inch | Cachar | 20 | 40 days | |
| Sintax 1000 Ltrs Capacity | Cachar | 5 | 40 days | |
| Towel Hanger for bathroom SS | Cachar | 5 | 40 days | |
| Toilet flushing cistem | Cachar | 5 | 40 days | |
| Prepainted CGI Sheet 10 Feet x 3 feet | Cachar | 123 | 40 days | |
| AC Sheet 4 feet x 4 feet | Cachar | 173 | 40 days | |
| PVC Socket 25 mm | Cachar | 30 | 40 days | |
| PVC Union 25 mm | Cachar | 30 | 40 days | |
| WC P Trap 4 inch | Cachar | 19 | 40 days | |
| Switch Board 4 x 4 | Cachar | 38 | 40 days | |
| 16 Amp Socket Combined | Cachar | 62 | 40 days | |
| Hard Wood doors with frame with all accesseries | Cachar | 13 | 40 days | |
| 16 Amp Combined switch and Socket | Cachar | 31 | 40 days | |
| PVC Waste Pipe for wash basin and Kitchen | Cachar | 27 | 40 days | |
| MCB Box PVC | Cachar | 11 | 40 days | |
| GI Binding Wire 8 SWG Lasgubg wire | Cachar | 1,150 | 40 days | |
| Binding Wire 22 SWG Black | Cachar | 2,373 | 40 days |
HQ 24 BRTF, HQ 24 BRTF, Department of Defence, Border Road Organisation, Ministry of Defence, (Commander)
₹20,000
27 Jul 2026
27 Jun 2026
8 Jul 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9486158.pdf
GEM_BID • 0.63 MB
spec_2026-06-18-12-31-25_484e4a6aff24c61518b94ea956f1f701.pdf
BOQ • 0.20 MB
boq_2026-06-18-12-31-25_d08129e855f72faaad1f8300f8cd9d28.csv
BOQ • 0.01 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .