Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.1 LAccepted-AOC | 1 | Accepted-AOC Agreement executed by him | |
| 2 | 2₹15.8 L+₹2.6 L (19.2%)Rejected-AOC | 2 | Rejected-AOC Second lowest |
Tender Value
₹13.7 L
EMD Value
₹20,700
Closing Date
17 Sept 2021, 3:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Sabarimala Development Project, TDB Building, Kumbazha Road, Pathanamthitta
SDP-Nilackal- Mandalam and Makaravilakku festival in 1197 ME- Providing Chemical treatment process for the sewage generated from the permanent toilets at Nilackal and for the operation of modular sewage treatment plant for the sewage generated from c
2021_TDB_438528_1
SDP/EE/ET-49/21-22
Open Tender
Civil Works - Others
Item Rate
90 days
Nilackal
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹20,700
12 May 2023
9 Sept 2021
20 Sept 2021
9 Sept 2021
17 Sept 2021
9 Sept 2021
Amount
APPENDIX A - Engaging labours and supply of chemicals Part I Wages of Employees Skilled Mazdoor(1 no per shift per day)
Pump Operators ( 1 no per shift for 2 shifts per day )
Man Mazdoor( 1 no per shift for 2 shifts per day )
Part II - Supply of chemicals Supply of Ferric Chloride at sewage treatment plant site having the following specification. Assay Iodometric 14.0 % Iron (II) chloride 1.0 % Free acid as hel. 1.0 % Sulphate (So4) 0.05% Heavy metals as PH 0.005% Arsenic 0.001% Phosphate (Po4) 0.005% Total nitrogen 0.005%
Do do supply of Hydrated lime (Ca2OH) having the following soecifications Assay (Acidemetric ) 96.0% Carbonate (CaCo3) max 3.0% Chloride(Cl) max 0.2% Sulphate So4 max 0.005% Heavy metals 0.05% (as PH) max Iron FC max 0.05% Substances not precipitated by Sulphate max 2.5%
Do do Supply of Hypochlorite at STP site
APPENDIX B - Engaging labours and supply of chemicals Part I Wages of Employees Plumber ( 1 No per shift for 2 shift for 67 days 1x2x67=134 days)
Elecrician Grade-1 ( 1 No per shift for 2 shift for 67 days 1x2x67=134 days)
Skilled mazdoor ( 1 No per shift for 2 shift for 67 days 1x2x67=134 days)
Pump operators( 1 No per shift for 2shift for 67 days 1x2x67=134 days)
Part II - Supply of chemicals Supply of Ferric Chloride at sewage treatment plant site having the following specification. Assay Iodometric 14.0 % Iron (II) chloride 1.0 % Free acid as hel. 1.0 % Sulphate (So4) 0.05% Heavy metals as PH 0.005% Arsenic 0.001% Phosphate (Po4) 0.005% Total nitrogen 0.005%
Do do supply of Hydrated lime (Ca2OH) having the following soecifications Assay (Acidemetric ) 96.0% Carbonate (CaCo3) max 3.0% Chloride(Cl) max 0.2% Sulphate So4 max 0.005% Heavy metals 0.05% (as PH) max Iron FC max 0.05% Substances not precipitated by Sulphate max 2.5%
Do do Supply of Hypochlorite at STP site
HARILAL P.V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_623476.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .