| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.2 LAccepted-Finance | ₹34.2 L | L1 | Accepted-Finance 1st lowest |
| 2 | L2₹35.8 L+₹1.6 L (4.65%)Rejected-Finance | ₹35.8 L+₹1.6 L (4.65%) | L2 | Rejected-Finance 2nd lowest |
| 3 | L2₹35.8 L+₹1.6 L (4.65%)Rejected-Finance P O SATOG TEHSIL THEOG DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹35.8 L+₹1.6 L (4.65%) | L2 | Rejected-Finance 2nd lowest |
| 4 | L3₹35.8 L+₹1.6 L (4.66%)Rejected-Finance | ₹35.8 L+₹1.6 L (4.66%) | L3 | Rejected-Finance 3rd lowest |
| 5 | L4₹36.8 L+₹2.6 L (7.59%)Rejected-Finance GOVT CONTRACTOR DISTT CHAMBA HP 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹36.8 L+₹2.6 L (7.59%) | L4 | Rejected-Finance 4th lowest |
Tender Value
₹51.1 L
EMD Value
₹1.1 L
Closing Date
7 Sept 2026, 5:00 pmClosed
Er. B.C. Negi
Executive Engineer, Kullu Division, HP.PWD, Kullu
Construction of Barshaini to Nakthan road km 0/000 to 3/020 (SH-5/7mtr wide formation cutting in km-0/900 to 2/000)
2026_PWD_142249_1
. PW/KD/TA/26- 7135-42 date 26.08.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Kullu
As refer to bid document
9 documents required · 9 mandatory
₹2,000
₹1.1 L
16 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, blasting work both in soft and hard rock with chiseling/wedging out of rock( where blasting is not required ) and their intermediate classification of soil including, dewatering wherever required setting out to the required line grades, side slopes trimming bottom and level as shown on the drawings as directed by Engineer-in-charge at site according to technical specifications clause 1603.1,&1603.2 and sorting out useful/un useful materials and stacking the same in all leads and lifts and transportation of the un-useful materials for filling in road ways, embankments for grades improvements and levelling to the required grade and then disposing of surplus excavated earth in acquired width of roads or on approved dumping sites through all modes of transportation including head load animal load or mechanical means along with its levelling fine dressing and all labour, machineries, materials, tools equipments and safety measures and incidentals necessary to complete the work by all means (if any required) Recovery for useful material of 2210.85 Cum @ 300/-per cubic metre amounting to Rs663254/- only shall be done on prorate basis for the quantity of cutting in earth work effected. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all respect. | 15,879.65 | Per Cubic Metre. | 321.98 | ₹51,12,929.71 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
sbd.pdf
Tender Documents • 2.43 MB
BOQ_211278.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .