Loading…
Loading…
Tender Value
₹72.9 L
EMD Value
₹73,000
Closing Date
31 Jul 2026, 6:00 pmClosed
Executive Engineer, Public Health Works Division, Junagadh
Providing FRP sheet dome with MS section over RCC UG Sump at Moniya H.W. ,Vekariya SHW and Malsika MHW Under Visavadar RWSS
323570
14/2026-2027
Open
Civil Works - Water Works
Works
Junagadh
9 documents required · 9 mandatory
₹3,600
Executive Engineer, Public Health Works Division,Junagadh
₹73,000
31 Jul 2026
13 Jul 2026
1 Aug 2026
13 Jul 2026
31 Jul 2026
13 Jul 2026
Estimated Cost: Rs.
Gujarat Water Supply & Sewerage Board
Zone-5, Junagadh
Name of Work: Providing FRP sheet dome with MS section over RCC UG Sump at
Moniya H.W. ,Vekariya SHW and Malsika MHW Under Visavadar RWSS
(1) The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
(2) The rates and prices shall be submitted in the electronic formats given by n-procure
which is called Schedule-B. Rates and prices received in any other formats will be
rejected and the Bids will be disqualified.
(3) It will be entirely at the discretion of the Employer to accept or reject the bidder’s
proposal, without giving any reasons whatsoever and the bidder shall not be permitted
to withdraw his bid on this account.
supplied by client.
(5) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as
called for against the BOQ item.
Schedule-B only will be considered for price evaluation. In the Schedule B1, Schedule
the list of some principal items with tentative quantities of the work there of for the
guidance of the bidder. For any excess over tender quantities, Extra items and
variations in quantities, Refer Clause No 14 of Volume IB- General Conditions of
(7) The total of the item prices in Schedule B1, Schedule B2… shall be equal to the price
pendency of the Contract, except for items under-price variation clause. In case of any
considered and binding on the Contractor. The prices in Schedule B1 to B21 of the
successful bidder shall be corrected accordingly.
(8) The bidder shall quote their prices for year in schedule – C i.e. O & M prices. The
Agency with the lowest quoted rate will be considered as L1 agency by
calculating the combined total of quoted rate in capital works (Schedule B) and O
& M Work (Schedule C).
(9) Wherever for a particular item the quantities have been specified payment shall be on
unit rate basis and unit variation in quantity will be paid with pro rata basis.
(10) Each item is to be individually priced online and the amounts shall be added up to arrive
blank except where the item description requires the item to be priced on "as
applicable” basis. The item shall not be priced if it is “not applicable” to the bidder’s
design, in which case the bidder shall add the words “NOT APPLICABLE”. The wording
in the item description is for subject matter guidance only; clause references are
indicative only and all other relevant clauses shall also be referred to. The prices shall
allow for all the works covered under the bid and all liabilities and contractual
obligations whether separately specified or not. Items against which no prices are
quoted shall not be separately paid for and the bidder shall be deemed to have covered
the cost of execution of such items (according to the requirements of the bid document)
in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for by
the Employer when executed and shall be deemed to be already covered by other items
and rates listed in the price sheets. No extra payment shall be given for any item which
is required to complete and perform the project.
(12) Schedule ‘D gives the basis of interim payment for construction of works.
will be considered for financial evaluation of the bid.
(14) The bidder shall be deemed to have allowed in his price for provision, maintenance and
final removal of all temporary works of whatsoever nature required for construction
including temporary bunds, diverting water, pumping, de-watering etc. for the proper
execution of works. The rates shall also be deemed to include any works and setting
out that may be required to be carried out for laying out of all the works involved.
(15) Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to
be taken as mutually explanatory of one another.
(17) The bidder shall interpret the data furnished and carry out any additional survey work,
or investigation work required at his own cost.
(18) The prices quoted shall also include the cost of materials utilized for testing.
(19) The bidder should acquaint himself with the site conditions including the access to Work
site. The successful bidder shall have to make suitable access to work sites at his own
cost. These accesses will be used by the other contractors working for GWSSB.
prices shall include all the equipments / materials / accessories and services required
(21) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(22) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(23) Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
(24) The prices shall be quoted exclusive of GST but inclusive of all other taxes, royalties
and duties prevailing at the time of submission of the bids. Statutory variation if any
during the currency of contract shall have to borne by the agency which shall be not
reimbursed by the GWSSB.
(25) The rates quoted shall be exclusive of GST, but inclusive of all other taxes and cess or
levies or duties which shall not be paid extra. While GST will be paid for admissible part
of actual work done at the approved tender rates and tender conditions of price
variation. GST shall be paid as per prevailing rates at the time of payment. The TDS
shall be deducted at source as per provision of IT rules and GWSSB policy.
(26) The rates should be quoted exclusive of GST but inclusive of all other taxes as per
Volume-1 (B), General Conditions of Contract, Clause No.47.
(27) The Bidders shall have to quote the rates in this tender keeping in view of the GST. The
Complete responsibility of taxes, duties, levies rests with the Contractor/Agency only.
(28) The process requires that the bidder shall quote his price for the work components
fix during the entire period of performance of the contract except price variation allowed
for supply of DI/PVC/OPVC/MS pipe as per Volume-IB Clause No. 59, General
Conditions of Contract.
(29) Payment shall be made for the components for which lump sump prices are quoted, as
per the schedule of payment. Total cost will be worked out on the basis of work done of
individual items and rates quoted against those particular items only.
(30) Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada Water
Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell (
K-1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered from the
running bills of the work from time to time and remaining amount if any shall be
recovered from the final bill before releasing the security deposit of the work. The
contractor shall furnish the statement showing the quantity of quarried materials /
minerals from whom purchased (with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The contractor shall
also furnish such additional information as regards royalty payment to the competent
(31) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall be rest
with the agency and required amount shall be recovered from any due amount of the
(32) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
Signature of contractor Executive Engineer
P. H. Works Division,
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: Providing FRP sheet dome with MS section over RCC UG Sump at Moniya H.W.
,Vekariya SHW and Malsika MHW Under Visavadar RWSS
The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of the
above Contract, we the undersigned offer to design, Engineer, procure, construct,
complete, commission, operate and maintain the whole of the said works for 3 years
from the date of commissioning including defects liability period as given in Conditions
of Contract and in conformity with the drawings, conditions of Contract, specifications,
Nos.__________ (insert numbers) for Lump sum fixed price of
Rupees_____________________________________________) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by
the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons, from
the date or receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at any
time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but until
such agreement is prepared this Bid together with your written acceptance thereof
shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of
value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely to
be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
Name of Work:- Bid Documents for “Providing FRP sheet dome with MS section
over RCC UG Sump at Moniya H.W. ,Vekariya SHW and Malsika MHW Under
Visavadar RWSS “
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be
Particular Qty. Issue Rate Unit
1. Materials not included in “Schedule – A” but required for the work shall be provided by
the contractor at his own cost.
2. Any materials required for items other than labour charges items mentioned in
“Schedule – B” and materials not included in “Schedule – A” but available with dept. will
be issued on request of the
contractor at departmental issued rate or market rate whichever is more.
3. The contractor shall provide his own arrangement for loading, unloading and
transporting the materials issued by the dept. from store to site at his own cost.
Contractor will be responsible for damages whatsoever during transfer.
4. The unused materials issued by the department for this work shall be returned to the
department in good and acceptable condition by the contractors. Any such unused
materials not returned by the contractor in time or issued will be recovered at Double of
(As per issue rate + 3% storage charge or Board RC + 3% storage charges) whichever is
5. All materials such as Specials, Fittings, Spares,PAC solution and Alum/PAC etc. shall
be brought by Agency / Contractor at site of work.
6. Contractor shall supply chlorine gas
7. The material which requires to be procured by contractor and same as available with
the department the same can be issued to the contractor after prior approval from the
competent authority and charged for the same will be at the current market rate or issue
rate fixed by the department whichever is higher. The contractor shall have to deposit
total cost of materials issued or shall be recovered from the running account bill.
8. The materials issued for the above work shall be used in the above O&M work only. If
any of materials issued for this work and found used in other works shall be charged at
the double rate.
9. As per the instructions of the competent authority and availability of materials, if
needed contractor have to transport the same from the other store to Various RWSS
Scheme for which no extra carting, loading, unloading will be paid.
10. The materials issued free of cost to the contractor is to be transported to the site of
work in good condition by the contractor for which no extra payment will be made.
11. The materials to be brought/purchase by the contractor shall be got approval from the
Engineer in Charge before using in the work.
Executive Engineer
Signature of contractor P. H. Works Division
P.H.S.Sub Division,Visavadar
Tal.Visavadar Dist.Junagadh
Name of work :‐ Providing FRP sheet dome with MS section over RCC UG Sump at
Moniya H.W. , Vekariya SHW and Malsika MHW Under Visavadar RWSS
Memorandum showing the approximate quantities for item of works to be carried out for the
above work Approximate amount put to tender Rs.
Qty Unit Description of Item Rate Per Amount
Demolition including stacking of serviceable
121.53 Cum materials and disposal of unserviceable 1071.63 Cum
materials with all lead and lift. (i) R.C.C Work
Hiring of JCB including driver & diesel
Hiring of Hydra / Crane with driver (8
hours working in DAY)
Hiring of Crane
For Moniya HW & Vekariya HW for =
20.00 Day Total Working Hours :‐ 8*20 =160 6412.47 Day
Providing FRP sheet covering with 2 mm
thickness fire extinguishing grade FRP
2733.64 Sqmt 1130.29 Sq.mt
material.(Unsaturated polyster GP UV
Steel work, welded in built up sections
framed work including cutting, hoisting,
fixing in position and applying a priming
coat of red lead paint. (A) In beams and
334.20 quintal joists, channels angles Tees, flats, with 9018.30 quintal
connecting plates or angle cleats as in
main and cross beams. Hip and jack
rafters, purlins conneted to common
rafters and the like.
Labour charges for lowering laying, fixing,
33.42 MT various size of M. S. section such as joints 8523.00 MT
channel, angles plates etc. complete.
Applying priming coat over new steel
and other metel surface after and
including preparing the surface by
throughly cleaning, oil,grease, dirt and
other foreign matter and scoured with
brushes fine steel wood, scrapers and
sand paper with ready mixed priming
paint brushing red lead.
Painting two coats (excluding priming
coat) on new steel and other metal
surface with synthetic enamel paint,
brushing to give an even shade including
cleaning the surface of all dirt, dust and
other foreign matter.
Excavation for foundation upto 1.5 mt.
Depth incl. sorting out and stacking of
92.57 Cum useful materials and disposing of the 266.26 Cum
excavated stuff upto 50 mt. Lead. (A)
Providing and cast in situ mass cement
concrete in grade M-10 (approx corresp.
to prop. 1:3:6 ) using granite, quartizite
8.17 Cum 3972.00 Cum
trap metal of size 12 mm to 25 mm incld.
consolidation curing etc. 2.1 With form
Providing and casting in situ C.C. in
grade M-15 (porportions as per
mixdesign or as per Table 9 of IS456
2000 in masses by weigh batching )
using granite, quartzite trap metal of size
6 mm to 20 mm for RCC work, including
scaffolding centering, form work, needle
vibrated consolidation, curing comp. up
to 6 meter depth or height (excluding
cost of reinforcement and neat finishing)
with centering and shuttering etc. comp.
for structure for other than water
retaining Footing for column or
foundation (with form work)
Dewatering by pumping set of required
capacity including temporary platform
carting pumping at site and fixing the
same in position including all
accessories and fuel and labour etc.
(10 HP X 1 Dewatering set )
Providing & Fixing Chainlink Jali on M.S.
Angle post with necessary pins/welding
and level Two coat oil paint with priming
coat etc. Complete as directed by EIC.
I am/We are willing to carry out the work at____________ above/below (In
Words)__________
____________________________________ percent above/below the tender rates mentioned
All the items of work shall be carrried out as per the PWD Hand Book Vol. I
&II (Latest Edn.) & other specification of Division as directed.
All the column in Schedule shall be filled in ink & the total of the entries in
the last column shall be struck of by the contractor under his signature.
Rates quoted shal be for the completed item of work etc. shall be include
3 clearance of site. (prior to commencement of work its close) in all respect &
hold goods for workunder all conditions & site I.e. moisture weather.
The amount Recoverable from the contractor by the Gujarat Water Supply &
4 Sewerage Board on any Account shall be made to be Contractor's / suppliers
under this clause. recovered from the amount payable to the contractor.
Contractor's Dy.Ex.Engr., Executive Engineer
Signature, P.H.S.Sub-Division P.H.Works Dn,
Visavadar Junagadh
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01_VOL 1A Technical Bid_Visavadar Dt.10.07.pdf
02 VOL 1 B GCC_Visavadar Dt. 10.07.pdf
03 Vol - 2 Technical Specifications Item Wise.pdf
04_VOL 3 Price bid with price _Visavadar Dt.pdf
05_VOL 4 Drawings_Visavadar.pdf
Visavadar FRP Dome -19-06.pdf
affidavite-300 new.pdf
estimated rates without GST-compressed.pdf
Excess 11.07.17.pdf
GR LD Deduction 10-1-2018.pdf
GST and Price Veri. New close. 17.03.2023.pdf
Gujarat State Purchase Policy-2016.pdf
Insurance Circular_19_03_2012.pdf
R and B Circular Unbalance 16.11.11 and 27.11.2008.pdf
SD And E.M.D GR 2026-27.pdf
Sramyogi dt. 17.03.2021.pdf
pre bid MoM dt.21-7-2026.pdf
CORRIGENDUM
Amendment-1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .