| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 CrAccepted-Finance | ₹28.8 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹28.9 CrRejected-Finance | ₹28.9 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹29.2 CrRejected-Finance | ₹29.2 Cr | L3 | Rejected-Finance L3 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹44.4 L
Closing Date
1 Apr 2026, 10:00 amClosed
EE HPPWD Sarahan
EE HPPWD SARAHAN
Construction of State of Art Model De-addiction and Rehabilitation Centre at Kotla Barog District Sirmour (H.P) (SH- C/O Building portion Civil work, water supply and sanitary installation Construction of rain water harvesting tank, , Soak pit
2026_PWD_132333_1
PW/SRN/CB/Tender/-9428-77 dated 16.03.2026
Open Tender
Civil Works - Buildings
545 days
Sarahan
Please refer Tender documents.
17 documents required · 17 mandatory
₹40,000
₹44.4 L
16 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto any height, including getting out the excavated soil and disposal of surplus excavated soil within all leads & lifts.In all kinds of soil and sorting useful and un useful material and transportation by the un- useful material for dispring at dumping site (to be arrangend by the contractor) as on stasifaction of Engineer -in charge including all modes of transportation i/c head load animal load or material means along with its levelling fine dressing and with all kinds of labour,machinries,tools equipment and safety measures and incidential necessary to complete the work by mechanical means and labour (if required) .any lose to the puplic and private property during the course of excavation and disposal of serviceable and un serviceable material shall be the absolute resposibilty by the contractor and shall have to be duly compensated by him in all respect i/c all incidential charges. | |||||
| 2Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 3Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Foundation footing and basis of columns, etc. and mass concrete. including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 4Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 5Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Flat surfaces such as soffits of suspended floors, roofs, landings and the like :including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 6Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Lintels, beams, plinth beams, girders, bressumers and cantilevers including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 7Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Columns, Pillars, Piers, Abutments, Posts and Struts including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 8Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form for Stairs, (excluding landings) except spiral staircases including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 9Providing form work with steel plates 3.15mm(three point one five millimetre) thick welded with angle iron in frame 30x30x5mm ,so as to give a fair finish including centring ,shuttering ,strutting and propping etc. with wooden battens and ballies , height of propping and centring below supporting floor to ceiling up to all heights and removal of the same for insitu-reinforced concrete & plain concrete work inCentering and shuttering including strutting, propping etc and removal of the form forEdges of slabs and break in floors and walls :-Under 20cm wide :-including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
| 10Providing and laying cement concrete 1:6:12 (1 cement : 6 coarse sand: 12 graded stone aggregate 40 mm nominal size) mechnical mixed and curing complete excluding cost of centring and shuttering in Foundation and plinth as required complete including carriage of all labour equipments and materials to various location through all modes of transportation upto all leads, lifts and other incidential charges. | |||||
stage.html
html • 0.04 MB
technical_195684.pdf
techsummary_195684.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.32 MB
SBD.pdf
Tender Documents • 3.04 MB
BOQ_195684.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid